2011 Inspection Reports

The purpose of inspection reports is to document the inspection scope, observation, and findings of inspections conducted by the NRC. The NRC performs inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors. The NRC performs inspections to verify the quality and suitability of vendor products, licensee-vendor interface, and review of equipment problems found during operation and their corrective action.

For inspections and related vendor inspections conducted by Region II for the Mixed Oxide Fuel Fabrication Facility, please reference the Meetings About Mixed Oxide Fuel page.

Prior to December 1999, the NRC issued NUREG-0040, "Licensee Contractor and Vendor Inspection Status Report," (The White Book) to document the results of inspections performed by the NRC's Quality Assurance, Vendor Inspection, Maintenance and Allegations Branch that were distributed to the inspected organizations. As of November 1999, these inspection reports are available electronically in the NRC's record retrieval system, ADAMS. The following inspections have been conducted since May 2005:

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
11/30/11

Gerdau, Charlotte Reinforcing Steel, Charlotte, NC, follow-up inspection to review Gerdau's implementation of corrective actions in response to response letter to the NRC's Notice of Nonconformance (NON) documented in the NRC's Inspection Report (IR) No. 99901407/2011-201, dated October 3, 2011

  • No Response Required
11/04/11

Westinghouse Electric Sweden AB (Westinghouse) facility in VästerĂ¥, Sweden, inspection of selected portions of Westinghouse's quality assurance (QA) program and 10 CFR Part 21 program

11/03/11

Obayashi Corporation, Tokyo, Japan, inspection of selected portions of Obayashi Corporation's quality assurance (QA) program and 10 CFR Part 21 program

10/28/11

Flowserve Pump Division (Flowserve) facility, Vernon, CA, inspection of selected portions of Flowserve's quality assurance (QA) program and 10 CFR Part 21 program

10/03/11

Gerdau, Charlotte Reinforcing Steel, Charlotte, NC, inspection of selected portions of Gerdau's quality assurance (QA) program and 10 CFR Part 21 program

09/27/11

Westinghouse Electric Company (WEC) LLC, Cranberry Township, PA, Engineering Design Verification inspection of the WEC AP1000 reactor design

09/20/11

Shaw Nuclear Services (SNS), Charlotte, NC, limited-scope inspection of selected portions of SNS's quality assurance (QA) program

09/13/11

Emerson Process Management, Fisher Controls International LLC (Fisher Controls), Marshalltown, IA, inspection of selected portions of Fisher Control's quality assurance (QA) program and 10 CFR Part 21 program

09/07/11

Westinghouse Electric Company (WEC) LLC, Newington Operations, Newington, NH, inspection of selected portions of WEC's quality assurance program and 10 CFR Part 21 program

  • No Response required
09/07/11

Shaw Nuclear Services (SNS), Charlotte, NC, limited-scope inspection of selected portions of SNS's quality assurance (QA) program and 10 CFR Part 21 program

07/29/11

Continuum Dynamics, INC, (CDI), Ewing, NJ, inspection of selected portions of CDI's quality assurance (QA) program and 10 CFR Part 21 program

07/20/11

CS Innovations, INC, (CSI), Scottsdale, AZ, inspection of selected portions of CSI's quality assurance (QA) program and 10 CFR Part 21 program

07/05/11

Areva NP, INC, Lynchburg, VA, limited-scope inspection of Areva NP's quality assurance (QA) program

04/22/11

Flowserve Limitorque, Lynchburg, VA, inspection of selected portions of Flowserve Limitorque's quality assurance (QA) program and 10 CFR Part 21 program

01/24/11

Shaw Modular Solutions, Lake Charles, LA, early termination of inspection of selection portions of SMS's quality assurance (QA) program and 10 CFR Part 21 program

01/20/11

GE Hitachi Nuclear Energy, Wilmington, NC, inspection of selected portions of GE Hitachi's quality assurance (QA) program and 10 CFR Part 21 program

01/03/11

Consolidated Power Supply, Birmingham, AL, inspection of selected portions of CPS's quality assurance (QA) program and 10 CFR Part 21 program