0350 Oversight Panel for 2005

The Nuclear Regulatory Commission staff has established a special oversight panel to coordinate the agency's activities in assessing the performance problems associated with the corrosion damage to the reactor vessel head at the Davis-Besse Nuclear Power Plant, monitoring corrective actions, and evaluating the readiness of the plant to resume operations.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
5/24/05

Category 1 Meeting: Discuss Transition of Davis-Besse Nuclear Power Station Oversight to the Reactor Oversight Process (ROP)

5/19/05 Closure of NRC Inspection Manual Chapter 0350 Oversight Panel for Davis-Besse Nuclear Power Station; Disposition of Findings Identified during the IMC 0350 Process; and Inspection Schedule Update (Inspection Report NO. 50-346/05-012)
2/22/05

Category 1 Meeting: Davis-Besse 0350 Panel Public Meeting

For related information see Reactor Pressure Boundary Integrity Issues for Pressurized Water Reactors.

(To top of page)