0350 Oversight Panel for 2002
The Nuclear Regulatory Commission staff has established a special oversight panel to coordinate the agency's activities in assessing the performance problems associated with the corrosion damage to the reactor vessel head at the Davis-Besse Nuclear Power Plant, monitoring corrective actions, and evaluating the readiness of the plant to resume operations.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Description |
|---|---|
| 12/23/02 | Category 1 meeting: Discuss the license's
expansion of their System Health Assurance Plan
|
| 12/10/02 | Category 3 meeting: Present to the
local public the status of the NRC's Oversight Panel activities
for the Davis-Besse Nuclear Power Station
|
| 12/10/02 | Category 1 meeting: Discuss License
performance and progress on the Return to Service Plan as part of
the IMC 0350 Process
|
| 11/20/02 | Lessons Learned Task Force Public Meeting
|
| 11/13/02 | Category 3 meeting: Present to the
local public the status of the NRC's Oversight Panel activities
for the Davis-Besse Nuclear Power Station.
|
| 11/13/02 | Category 1 meeting: Discuss License
performance and progress on the Return to Service Plan as part of
the IMC 0350 Process
|
| 10/16/02 | Category 1 meeting: Discuss preliminary
findings and observations from the two NRC special inspections conducted
to review radiolocial work planning, dose to workers during the
outage, and offsite contamination events |
| 10/16/02 | Category 1 meeting: Discuss licensee
performance and progress on the Return to Service Plan as of the
IMC 0350 Process. |
| 10/16/02 | Category 3 meeting: Present to the local
public the status of the NRC's Oversight Panel activities for the
Davis-Besse Nuclear Power Station |
| 09/18/02 | Category 1 meeting: Discuss the licensee's
planned corrective actions to address the Davis-Besse organizational
and human performance problems presented to the NRC during the August
15, 2002, public meeting.
|
| 09/17/02 | Category 3 meeting: Present to the local
public the status of the NRC's oversight panel activities for the
Davis-Besse Nuclear Power Station |
| 09/17/02 | Category 1 meeting: Discuss licensee
performance and progress on the Return to Service Plan as part of
the IMC 0350 Process
|
| 08/23/02 | Category 2 meeting: This meeting is to discuss the NEI and PWR licensees Bulletin 2002-02, "Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles Inspections Programs." |
| 08/20/02 | Category 3 meeting: Present to the
local public the status of the NRC's oversight panel activities
for the Davis-Besse Nuclear Power Station.
|
| 08/20/02 | Category 1 meeting: Discuss
licensee performance and plans for restart as part of the IMC 0350
process.
|
| 08/16/02 | Transmittal of NRC Inspection Manual Chapter 0350 Panel Restart Checklist |
| 08/15/02 | Category 1 meeting: Discuss the licensee's root cause analysis of the non-technical issues that led to the reactor pressure vessel head degradation. Contact: Christine Lipa, 630-829-9619
|
| 07/16/02 | Category 1 meeting: Discuss
licensee performance and plans for restart as part of the IMC 0350
Process
|
| 07/16/02 | Category 3 Meeting: Present
to the local public the status of NRC's oversight panel activities
for the Davis-Besse Nuclear Power Station
|
| 07/03/02 | Davis Besse IMC 0350 Charter Revision 1 |
| 06/12/02 | Public Meeting: To discuss
plant performance and plans for restart of the Davis-Bese Nuclear
Power Station, as part of the implementation of NRC's Inspection
Manual Chapter (IMC) 0350.
|
| 06/12/02 | Public Meeting: Status of
the NRC's activities related to the plant performance and plans
for restart of the Davis-Besse Nuclear Power Station. |
| 05/09/02 | Public Meeting: Implementation
of NRC Oversight Panel (IMC 350) |
| 05/03/02 | NRC Press Release III-02-024: Davis-Besse Oversight Panel to Hold First Meeting May 9 in Oak Harbor, Ohio |
| 04/30/02 | NRC Press Release III-02-023: Establishes Agency Oversight Panel for Davis-Besse Reactor Head Degradation Issue |
| 04/29/02 | Letter from J.E. Dyer, Regional Administrator, Region III, to Howard Bergendahl, Vice President - Nuclear, Davis-Besse, regarding NRC Oversight Efforts regarding the Davis-Besse Nuclear Power Station |
| 03/06/01 | Inspection Manual Chapter
0350: Oversight of Operating Reactor Facilities in an Extended Shutdown
as a Result of Significant Performance Problems. |
For related information see Generic Activities on Alloy 600 Cracking.