Home > NRC Library > ADAMS Public Documents
Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, and Tier 1.
Accession Number: ML17206A249
Date Released: Tuesday, September 1, 2026
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17206A251 - Virgil C. Summer Nuclear Station, Units 2 & 3, Submittal of Revision 5 to Updated Final Safety Analysis Report, and Tier 1. (7/12/2017)
- ML17206A323 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report Tier 1. (7/12/2017)
- ML17206A252 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant. (7/12/2017)
- ML17206A254 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 2, Table of Contents. (7/12/2017)
- ML17206A255 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics. (7/12/2017)
- ML17206A256 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 2, Section 2.1, Geography and Demography. (7/12/2017)
- ML17206A257 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 2, Section 2.2, Nearby Industrial, Transportation, and Military Facilities. (7/12/2017)
- ML17206A258 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 2, Section 2.3, Meteorology. (7/12/2017)
- ML17206A259 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Hydrologic Engineering. (7/12/2017)
- ML17206A260 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering. (7/12/2017)
- ML17206A261 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5,2, Vibratory Ground Motion. (7/12/2017)
- ML17206A262 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5,3, Surface Faulting Combined License Information. (7/12/2017)
- ML17206A263 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5,4, Stability and Uniformity of Subsurface Materials and Foundations. (7/12/2017)
- ML17206A266 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5.5, Combined License Information for Stability of Slopes. (7/12/2017)
- ML17206A267 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5.6, Combined License Information for Embankments and Dams. (7/12/2017)
- ML17206A272 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Table of Contents. (7/12/2017)
- ML17206A273 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Section 3.1, Conformance with Nuclear Regulatory Commission General Design Criteria. (7/12/2017)
- ML17206A275 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Section 3.2, Classification of Structures, Components, and Systems. (7/12/2017)
- ML17206A276 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Section 3.3, Wind and Tornado Loadings. (7/12/2017)
- ML17206A277 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Section 3.4, Water Level (Flood) Design. (7/12/2017)
- ML17206A278 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Section 3.5, Missile Protection. (7/12/2017)
- ML17206A279 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Section 3.6, Protection Against the Dynamic Effects Associated with the Postulated Rupture of Piping. (7/12/2017)
- ML17206A280 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Section 3.7, Seismic Design. (7/12/2017)
- ML17206A281 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Category I Structures. (7/12/2017)
- ML17206A282 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Section 3.9, Mechanical Systems and Components. (7/12/2017)
- ML17206A283 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Section 3.10, Seismic and Dynamic Qualification of Seismic Category I Mechanical and Electrical Equipment. (7/12/2017)
- ML17206A284 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Section 3.11, Environmental Qualification of Mechanical and Electrical Equipment. (7/12/2017)
- ML17206A285 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, HVAC Ducts and Duct Supports. (7/12/2017)
- ML17206A287 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Leak-Before-Break Evaluation of the AP1000 Piping. (7/12/2017)
- ML17206A288 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3C, Reactor Coolant Loop Analysis Methods. (7/12/2017)
- ML17206A289 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3D, Methodology for Qualifying AP1000 Safety-Related Electrical and Mechanical Equipment. (7/12/2017)
- ML17206A290 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3E, High-Energy Piping in the Nuclear Island. (7/12/2017)
- ML17206A291 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3F, Cable Trays and Cable Tray Supports. (7/12/2017)
- ML17206A292 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Nuclear Island Seismic Analyses. (7/12/2017)
- ML17206A293 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3H, Auxiliary and Shield Building Critical Sections. (7/12/2017)
- ML17206A295 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3I, Evaluation for High Frequency Seismic Input. (7/12/2017)
- ML17206A298 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 4, Reactor. (7/12/2017)
- ML17206A299 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems. (7/12/2017)
- ML17206A302 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (7/12/2017)
- ML17206A303 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls. (7/12/2017)
- ML17206A304 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 8, Electric Power. (7/12/2017)
- ML17206A305 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems. (7/12/2017)
- ML17206A306 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion. (7/12/2017)
- ML17206A307 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (7/12/2017)
- ML17206A308 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection. (7/12/2017)
- ML17206A309 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operation. (7/12/2017)
- ML17206A310 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program. (7/12/2017)
- ML17206A311 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses. (7/12/2017)
- ML17206A312 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications. (7/12/2017)
- ML17206A313 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance. (7/12/2017)
- ML17206A314 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering. (7/12/2017)
- ML17206A315 - Virgil C. Summer Nuclear Station, Units 2 & 3, Revision 5 to Updated Final Safety Analysis Report, Chapter 19, Probabilistic Risk Assessment. (7/12/2017)