Home > NRC Library > ADAMS Public Documents
Crystal River, Unit 3, License Amendment Request #310, Revision 1 Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane - Response to Request for Additional Information.
Accession Number: ML113140510
Date Released: Monday, November 21, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11314A115 - Crystal River, Unit 3, License Amendment Request #310, Revision 1 Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane - Response to Request for Additional Information. (8 page(s), 9/1/2011)
- ML11314A119 - Crystal River, Unit 3, Calculation No. S09-0036, Auxiliary Building Overhead Crane (FHCR-5) Supporting Steel Structure - Analysis. (89 page(s), 9/1/2011)
- ML11314A120 - Crystal River, Unit 3, Calculation No. S10-0049, Auxiliary Building Overhead Crane (FHCR-5) Supporting Steel Structure - ANSYS Model. (1125 page(s), 1/11/2011)
- ML11314A121 - Crystal River, Unit 3, Calculation No. S10-0063, Auxiliary Building Overhead Crane (FHCR-5) Supporting Steel Structure - Connection Evaluation. (29 page(s), 8/5/2011)
- ML11314A122 - Crystal River, Unit 3, FPC118-PR-001, Revision 2, Design Criteria Document Regarding Auxiliary Building Evaluation for Crane Upgrade. (49 page(s), 8/8/2011)
- ML11314A123 - Crystal River, Unit 3, Drawing No. 522-041-003, EC70139, Rev. 0, Attachment Z45R0, Vertical Bracing Connections. (1 page(s), 9/1/2011)
- ML11314A124 - Crystal River, Unit 3, Drawing No. 522-041-004, EC70139, Rev. 0, Attachment Z46R0, Vertical Bracing Connections. (1 page(s), 9/1/2011)
- ML11314A125 - Crystal River, Unit 3, Drawing No. 522-041-005, EC70139, Rev. 0, Attachment Z47R0, Vertical Bracing Connections. (1 page(s), 9/1/2011)
- ML11314A126 - Crystal River, Unit 3, Drawing No. 522-041-006, EC70139, Rev. 0, Attachment Z48R0, Vertical Bracing Connections. (1 page(s), 9/1/2011)
- ML11314A127 - Crystal River, Unit 3, Drawing No. 522-041-007, EC70139, Rev. 0, Attachment Z49R0, Vertical Bracing Connections. (1 page(s), 9/1/2011)
- ML11314A128 - Crystal River, Unit 3, Drawing No. 522-041-008, EC70139, Rev. 0, Attachment Z50R0, Vertical Bracing Connections. (1 page(s), 9/1/2011)
- ML11314A129 - Crystal River, Unit 3, Drawing No. 522-041-009, EC70139, Rev. 0, Attachment Z51R0, Vertical Bracing Connections. (1 page(s), 9/1/2011)
- ML11314A130 - Crystal River, Unit 3, Drawing No. 522-041-010, EC70139, Rev. 0, Attachment Z52R0, E-W Member Moment Connections at Floor EL. 162'-0" (1 page(s), 9/1/2011)
- ML11314A131 - Crystal River, Unit 3, Drawing No. 522-041-011, EC70139, Rev. 0, Attachment Z52R0, Crane Girder Bracket Connections. (1 page(s), 9/1/2011)
- ML11314A132 - Crystal River, Unit 3, Drawing No. 522-041-012, EC70139, Rev. 0, Attachment Z70R0, E-W Member Moment Connections at Floor, EL. 162'-0". (1 page(s), 9/1/2011)
- ML11314A133 - Crystal River, Unit 3, Drawing No. 522-041-013, EC70139, Rev. 0, Attachment Z72R0, E-W Member Moment Connections at Floor, EL. 162'-0". (1 page(s), 9/1/2011)
- ML11314A134 - Crystal River, Unit 3, Drawing No. 522-041-014, EC70139, Rev. 0, Attachment Z73R0, N-S Member Connections at EL. 162'-0". (1 page(s), 9/1/2011)
- ML11314A135 - Crystal River, Unit 3, Drawing No. 522-041-015, EC70139, Rev. 0, Attachment Z91R0, N-S Member Connections at EL. 162'-0". (1 page(s), 9/1/2011)
- ML11314A136 - Crystal River, Unit 3, Drawing No. 522-041-016, EC70139, Rev. 0, Attachment Z92R0, N-S Member Connections at EL. 162'-0". (1 page(s), 9/1/2011)
- ML11314A137 - Crystal River, Unit 3, Drawing No. 522-041-018, EC70139, Rev. 0, Attachment Z93R0, Column Connections to Concrete Floor. (1 page(s), 9/1/2011)
- ML11314A138 - Crystal River, Unit 3, Drawing No. 522-041-019, Rev. 0, EC70139, Rev. 0, Attachment Z95R0, Column Connections to Concrete Floor. (1 page(s), 9/1/2011)
- ML11314A140 - Crystal River, Unit 3, Drawing No. S-521-102, EC70139, Rev. 0, Attachment Z96R0, N-S Member Connections (Purlin) at Roof EL. 209'-1". (1 page(s), 9/1/2011)
- ML11314A139 - Crystal River, Unit 3, Drawing No. 521-142-001, EC70139, Rev. 0, Attachment Z100R0, Horizontal Bracing Connections at Roof El. 209'-1" (Between Column Line I1 & J1). (1 page(s), 9/1/2011)
- ML11314A141 - Crystal River, Unit 3, Drawing No. S-522-003, EC70139, Rev. 0, Attachment Z101R0, E-W Member Moment Connections at Floor EL. 162'-0", E-W Member Connections at El. 162'-0" (at Column Line L, at Column Line S1, and Between Column Line M1 and N1), N-S.... (1 page(s), 9/1/2011)
- ML11314A142 - Crystal River, Unit 3, Drawing No. S-522-004 EC70139, Rev. 0, Attachment Z102R0, E-W Member Connections at Roof EL. 209'- 1" (at Column Line S1), N-S Member Connections at Roof EL. 209'-1" (Between Column Line P1 & Q1)., N-S Member Connections.... (1 page(s), 9/1/2011)
- ML11314A143 - Crystal River, Unit 3, Drawing No. S-522-006, EC70139, Rev. 0, Attachment Z103R0, Vertical Bracing Member Replacement and Vertical Bracing Connections. (1 page(s), 9/1/2011)
- ML11314A144 - Crystal River, Unit 3, Drawing No. 522-041-017, EC70139, Rev. 0, Attachment Z104R0, Miscellaneous N-S Member Connections and E-W Member Connections at EL. 189'-9" (at Column Line S1). (1 page(s), 9/1/2011)
- ML11314A145 - Crystal River, Unit 3, Drawing No. 521-142-002, EC70139, Rev. 0, Attachment Z105R0, Crane Girder Bracket Connections. (1 page(s), 9/1/2011)
- ML11314A146 - Crystal River, Unit 3, Drawing No. 522-041-020, EC70139, Rev. 0, Attachment Z106R0, Vertical Bracing Member Replacement and Vertical Bracing Connections. (1 page(s), 9/1/2011)
- ML11314A147 - Crystal River, Unit 3, Drawing No. 522-041 Sheet 001, EC 70139, Rev. 0, Attachment Z107R0, Vertical Bracing Member Replacement, Vertical Bracing Connections, N-S Member Connections at Roof EL. 209'-1" (Between Column Line P1 & Q1), E-W Member.... (1 page(s), 9/1/2011)
- ML11314A148 - Crystal River, Unit 3, Drawing No. 522-041-002, EC70139, Rev. 0, Attachment Z108R0, Vertical Bracing Connections. (1 page(s), 9/1/2011)
- ML11314A149 - Crystal River, Unit 3, Drawing No. 521-142-003, EC70139, Rev. 0, Attachment Z109R0, Column Connections to Concrete Floor. (1 page(s), 9/1/2011)
- ML11314A150 - Crystal River, Unit 3, Drawing No. 521-142-004, EC70139, Rev. 0, Attachment Z110R0,Column Connections to Concrete Floor. (1 page(s), 9/1/2011)
- ML11314A151 - Crystal River, Unit 3, Drawing No. 522-041-021, EC70139, Rev. 0, Attachment Z111R0, Crane Girder Bracket Connections. (1 page(s), 9/1/2011)
- ML11314A152 - Crystal River, Unit 3, Drawing No. 521-142-005, EC70139, Rev. 0, Attachment Z117R0, Crane Girder Bracket Connection. (1 page(s), 9/1/2011)
- ML11314A153 - Crystal River, Unit 3, Drawing No. 521-142-006, EC70139, Rev. 0, Attachment Z118R0, Crane Girder Bracket Connections. (1 page(s), 9/1/2011)
- ML11314A154 - Crystal River, Unit 3, Drawing No. 422-057-001, EC70139, Rev. 0, Attachment Z119R0, Concrete Tie Beam between 301-S, and 302A-S Concrete Column Pier. (1 page(s), 9/1/2011)
- ML11314A155 - Crystal River, Unit 3, Drawing No. 522-041-022, EC70139, Rev. 0, Attachment Z120R0, Crane Girder Bracket Connections. (1 page(s), 9/1/2011)
- ML11314A156 - Crystal River, Unit 3, Drawing No. 522-041-023, EC70139, Rev. 0, Attachment Z121R0, E-W Member Moment Connections at Floor EL. 162'-0". (1 page(s), 9/1/2011)
- ML11314A157 - Crystal River, Unit 3, Drawing No. 522-041-024, EC70139, Rev. 0, Attachment Z122R0, Vertical Bracing Connections. (1 page(s), 9/1/2011)