Westinghouse AP1000 Design Control Document Rev. 18
Accession Number: ML103480572
Date Released: Tuesday, December 21, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML103480394 - Westinghouse AP1000 Design Control Document Rev. 18 - Introduction (19 page(s), 12/1/2010)
- ML103480395 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 - Change Roadmap (36 page(s), 12/1/2010)
- ML103480396 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 - List of Effective Pages (5 page(s), 12/1/2010)
- ML103480397 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 - Table of Contents (6 page(s), 12/1/2010)
- ML103480398 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 1 - Introduction - Section 1.0 Introduction (13 page(s), 12/1/2010)
- ML103480399 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 2 - SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 2.1 Reactor (51 page(s), 12/1/2010)
- ML103480400 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 2 - SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 2.2 Nuclear Safety Systems (107 page(s), 12/1/2010)
- ML103480401 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 2 - SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 2.3 Auxiliary Systems (128 page(s), 12/1/2010)
- ML103480402 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 2 - SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 2.4 Steam and Power Conversion Systems (22 page(s), 12/1/2010)
- ML103480403 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 2 - SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 2.5 Instrumentation and Control Systems (44 page(s), 12/1/2010)
- ML103480404 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 2 - SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 2.6 Electrical Power Systems (56 page(s), 12/1/2010)
- ML103480406 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 2 - SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 2.7 HVAC Systems (45 page(s), 12/1/2010)
- ML103480407 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 3 - NON-SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 3.1 Emergency Response Facilities (2 page(s), 12/1/2010)
- ML103480408 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 3 - NON-SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 3.2 Human Factors Engineering (7 page(s), 12/1/2010)
- ML103480409 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 3 - NON-SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 3.3 Buildings (47 page(s), 12/1/2010)
- ML103480410 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 3 - NON-SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 3.4 Initial Test Program (1 page(s), 12/1/2010)
- ML103480411 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 3 - NON-SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 3.5 Radiation Monitoring (8 page(s), 12/1/2010)
- ML103480412 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 3 - NON-SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 3.6 Reactor Coolant Pressure Boundary Leak Detection (2 page(s), 12/1/2010)
- ML103480413 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 3 - NON-SYSTEM BASED DESIGN DESCRIPTIONS AND ITAAC - 3.7 Design Reliability Assurance Program (7 page(s), 12/1/2010)
- ML103480414 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 4 - INTERFACE REQUIREMENTS - Section 4.0 INTERFACE REQUIREMENTS (1 page(s), 12/1/2010)
- ML103480415 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 1 Chapter 5 - SITE PARAMETERS - 5.0 SITE PARAMETERS (11 page(s), 12/1/2010)
- ML103480416 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 - List of Effective Pages (38 page(s), 12/1/2010)
- ML103480417 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 - Change Pages (223 page(s), 12/1/2010)
- ML103480418 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 - Master Table of Contents (32 page(s), 12/1/2010)
- ML103480419 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 1 - Introduction and General Description of the Plant - Section 1.1 Introduction (6 page(s), 12/1/2010)
- ML103480420 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 1 - Introduction and General Description of the Plant - Section 1.2 General Plant Description (57 page(s), 12/1/2010)
- ML103480421 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 1 - Introduction and General Description of the Plant - Section 1.3 Comparisons With Similar Facility Designs (7 page(s), 12/1/2010)
- ML103480422 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 1 - Introduction and General Description of the Plant - Section 1.4 Identification of Agents and Contractors (3 page(s), 12/1/2010)
- ML103480423 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 1 - Introduction and General Description of the Plant - Section 1.5 Requirements for Further Technical Information (10 page(s), 12/1/2010)
- ML103480424 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 1 - Introduction and General Description of the Plant - Section 1.6 Material Referenced (22 page(s), 12/1/2010)
- ML103480425 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 1 - Introduction and General Description of the Plant - Section 1.7 Drawings and Other Detailed Information (12 page(s), 12/1/2010)
- ML103480426 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 1 - Introduction and General Description of the Plant - Section 1.8 Interfaces for Standard Design (23 page(s), 12/1/2010)
- ML103480427 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 1 - Introduction and General Description of the Plant - Section 1.9 Compliance with Regulatory Criteria (159 page(s), 12/1/2010)
- ML103480428 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 1 - Introduction and General Description of the Plant - Table of Contents (5 page(s), 12/1/2010)
- ML103480429 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 1 - Introduction and General Description of the Plant - APPENDIX 1A CONFORMANCE WITH REGULATORY GUIDES (74 page(s), 12/1/2010)
- ML103480430 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 1 - Introduction and General Description of the Plant - APPENDIX 1B SEVERE ACCIDENT MITIGATION DESIGN ALTERNATIVES (23 page(s), 12/1/2010)
- ML103480431 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 10 – Steam and Power Conversion System – Section 10.1 Summary Description (5 page(s), 12/1/2010)
- ML103480432 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 10 – Steam and Power Conversion System – Section 10.2 Turbine-Generator (27 page(s), 12/1/2010)
- ML103480433 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 10 – Steam and Power Conversion System – Section 10.3 Main Steam Supply SystemTier 2 Chapter 10 – Steam and Power Conversion System – S (39 page(s), 12/1/2010)
- ML103480434 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 10 – Steam and Power Conversion System – Section 10.4 Other Features of Steam and Power Conversion System (70 page(s), 12/1/2010)
- ML103480435 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 10 – Steam and Power Conversion System – Table of Contents (6 page(s), 12/1/2010)
- ML103480436 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 11 – Radioactive Waste Management – Section 11.1 Source Terms (16 page(s), 12/1/2010)
- ML103480437 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 11 – Radioactive Waste Management – Section 11.2 Liquid Waste Management Systems (53 page(s), 12/1/2010)
- ML103480438 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 11 – Radioactive Waste Management – Section 11.3 Gaseous Waste Management System (23 page(s), 12/1/2010)
- ML103480439 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 11 – Radioactive Waste Management – Section 11.4 Solid Waste Management (35 page(s), 12/1/2010)
- ML103480440 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 11 – Radioactive Waste Management – Section 11.5 Radiation Monitoring (30 page(s), 12/1/2010)
- ML103480441 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 11 – Radioactive Waste Management – Table of Contents (5 page(s), 12/1/2010)
- ML103480442 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 12 – Radiation Protection – Section 12.1 Assuring that Occupational Radiation Exposures Are As-Low-As-Reasonably Achievable (ALARA) (8 page(s), 12/1/2010)
- ML103480443 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 12 – Radiation Protection – Section 12.2 Radiation Sources (63 page(s), 12/1/2010)
- ML103480444 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 12 – Radiation Protection – Section 12.3 Radiation Protection Design Feature (70 page(s), 12/1/2010)
- ML103480445 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 12 – Radiation Protection – Section 12.4 Dose Assessment (19 page(s), 12/1/2010)
- ML103480446 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 12 – Radiation Protection – Section 12.5 Health Physics Facilities Design (4 page(s), 12/1/2010)
- ML103480447 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 12 – Radiation Protection – Table of Contents (7 page(s), 12/1/2010)
- ML103480448 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 13 - Conduct of Operations - Table of Contents (1 page(s), 12/1/2010)
- ML103480449 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 13 - Conduct of Operations (5 page(s), 12/1/2010)
- ML103480450 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 14 - Initial Test Program - Section 14.1 Specific Information to be Included in Preliminary Final Safety Analysis Reports (1 page(s), 12/1/2010)
- ML103480451 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 14 - Initial Test Program - Section 14.2 Specific Information to be Included in Standard Safety Analysis Reports (134 page(s), 12/1/2010)
- ML103480452 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 14 - Initial Test Program - Section 14.3 Certified Design Material (52 page(s), 12/1/2010)
- ML103480453 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 14 - Initial Test Program - Section 14.4 Combined License Applicant Responsibilities (2 page(s), 12/1/2010)
- ML103480454 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 14 - Initial Test Program - Table of Contents (6 page(s), 12/1/2010)
- ML103480455 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 14 - APPENDIX A DAC ITAAC Closure Process (1 page(s), 12/1/2010)
- ML103480456 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 15 - Accident Analyses - Section 15.0 Accident AnalysesTier 2 Chapter 15 - Accident Analyses - Section 15.1 Increase in Heat Removal Fr (40 page(s), 12/1/2010)
- ML103480457 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 15 - Accident Analyses - Section 15.1 Increase in Heat Removal From the Primary System (74 page(s), 12/1/2010)
- ML103480458 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 15 - Accident Analyses - Section 15.2 Decrease in Heat Removal by the Secondary System (86 page(s), 12/1/2010)
- ML103480459 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 15 - Accident Analyses - Section 15.3 Decrease in Reactor Coolant System Flow Rate (34 page(s), 12/1/2010)
- ML103480460 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 15 - Accident Analyses - Section 15.4 Reactivity and Power Distribution Anomalies (78 page(s), 12/1/2010)
- ML103480461 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 15 - Accident Analyses - Section 15.5 Increase in Reactor Coolant Inventory (34 page(s), 12/1/2010)
- ML103480462 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 15 - Accident Analyses - Section 15.6 Decrease in Reactor Coolant Inventory (263 page(s), 12/1/2010)
- ML103480463 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 15 - Accident Analyses - Section 15.7 Radioactive Release from a Subsystem or Component (6 page(s), 12/1/2010)
- ML103480464 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 15 - Accident Analyses - Section 15.8 Anticipated Transients Without Scram (1 page(s), 12/1/2010)
- ML103480465 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 15 - Accident Analyses - Table of Contents (22 page(s), 12/1/2010)
- ML103480466 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 15 - Accident Analyses - APPENDIX 15A EVALUATION MODELS AND PARAMETERS FOR ANALYSIS OF RADIOLOGICAL CONSEQUENCES OF ACCIDENTS (18 page(s), 12/1/2010)
- ML103480467 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 15 - Accident Analyses - APPENDIX 15B REMOVAL OF AIRBORNE ACTIVITY FROM THE CONTAINMENT ATMOSPHERE FOLLOWING A LOCA (12 page(s), 12/1/2010)
- ML103480468 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 16 - Technical Specifications - 16.1 Bases Part 1 (248 page(s), 12/1/2010)
- ML103480469 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 16 - Technical Specifications - 16.1 Bases Part 2 (310 page(s), 12/1/2010)
- ML103480470 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 16 - Technical Specifications - 16.1 TECHNICAL SPECIFICATIONS (288 page(s), 12/1/2010)
- ML103480471 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 16 - Technical Specifications - 16.2 DESIGN RELIABILITY ASSURANCE PROGRAM (1 page(s), 12/1/2010)
- ML103480472 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 16 - Technical Specifications - 16.3 INVESTMENT PROTECTION (49 page(s), 12/1/2010)
- ML103480473 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 16 - Technical Specifications - Table of Contents (8 page(s), 12/1/2010)
- ML103480474 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 17 - Quality Assurance - Table of Contents (3 page(s), 12/1/2010)
- ML103480475 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 17 - Quality Assurance (25 page(s), 12/1/2010)
- ML103480476 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.10 Training Program Development (1 page(s), 12/1/2010)
- ML103480477 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.11 Human Factors Engineering Verification and Validation (3 page(s), 12/1/2010)
- ML103480478 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.12 Inventory (10 page(s), 12/1/2010)
- ML103480479 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.13 Design Implementation (1 page(s), 12/1/2010)
- ML103480480 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.14 Human Performance Monitoring (1 page(s), 12/1/2010)
- ML103480481 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.1 Overview (5 page(s), 12/1/2010)
- ML103480482 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.2 Human Factors Engineering Program Management (23 page(s), 12/1/2010)
- ML103480483 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.3 Operating Experience Review (1 page(s), 12/1/2010)
- ML103480484 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.4 Functional Requirements Analysis and Allocation (2 page(s), 12/1/2010)
- ML103480485 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.5 AP1000 Task Analysis Implementation Plan (8 page(s), 12/1/2010)
- ML103480486 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.6 Staffing (1 page(s), 12/1/2010)
- ML103480487 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.7 Integration of Human Reliability Analysis with Human Factors Engineering (2 page(s), 12/1/2010)
- ML103480488 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.8 Human System Interface Design (30 page(s), 12/1/2010)
- ML103480489 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Section 18.9 Procedure Development (1 page(s), 12/1/2010)
- ML103480490 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 18 - Human Factors Engineering - Table of Contents (5 page(s), 12/1/2010)
- ML103480491 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - Sections 19-1 to 19.14 (19 page(s), 12/1/2010)
- ML103480492 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - Sections 19.15 to 19.33 (20 page(s), 12/1/2010)
- ML103480493 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - Sections 19.34 to 19.35 (10 page(s), 12/1/2010)
- ML103480494 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - Sections 19.36 to 19.38 (4 page(s), 12/1/2010)
- ML103480495 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - Sections 19.39 to 19.40 (12 page(s), 12/1/2010)
- ML103480496 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - Sections 19.41 to 19.54 (24 page(s), 12/1/2010)
- ML103480497 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - Sections 19.55 to 19.58 (50 page(s), 12/1/2010)
- ML103480498 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - Sections 19.59 PRA Results and Insights (101 page(s), 12/1/2010)
- ML103480499 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Table of Contents (14 page(s), 12/1/2010)
- ML103480500 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - APPENDIX 19A THERMAL HYDRAULIC ANALYSIS TO SUPPORT SUCCESS CRITERIA (1 page(s), 12/1/2010)
- ML103480501 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - APPENDIX 19B EX-VESSEL SEVERE ACCIDENT PHENOMENA (10 page(s), 12/1/2010)
- ML103480502 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - APPENDIX 19C ADDITIONAL ASSESSMENT OF AP1000 DESIGN FEATURES (1 page(s), 12/1/2010)
- ML103480503 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - APPENDIX 19D EQUIPMENT SURVIVABILITY ASSESSMENT (36 page(s), 12/1/2010)
- ML103480504 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 19 - Probabilistic Risk Assessment - APPENDIX 19E SHUTDOWN EVALUATION (94 page(s), 12/1/2010)
- ML103480506 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 2 - Table of Contents (2 page(s), 12/1/2010)
- ML103480507 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 2 - SITE CHARACTERISTICS (28 page(s), 12/1/2010)
- ML103480508 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - Section 3.10 Seismic and Dynamic Qualification of Seismic Category I Mechanica (8 page(s), 12/1/2010)
- ML103480509 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - Section 3.11 Environmental Qualification of Mechanical and Electrical Equipmen (57 page(s), 12/1/2010)
- ML103480510 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - Section 3.1 Conformance with Nuclear Regulatory Commission General Design Crit (35 page(s), 12/1/2010)
- ML103480511 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - Section 3.2 Classification of Structures, Components, and Systems (94 page(s), 12/1/2010)
- ML103480512 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - Section 3.3 Wind and Tornado Loadings (6 page(s), 12/1/2010)
- ML103480513 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - Section 3.4 Water Level (Flood) Design (28 page(s), 12/1/2010)
- ML103480514 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - Section 3.5 Missile Protection (16 page(s), 12/1/2010)
- ML103480515 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 3 Chapter 3 - Design of Structures, Components, Equip. & Systems - Section 3.6 Protection Against the Dynamic Effects Associated with the Postula (55 page(s), 12/1/2010)
- ML103480516 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - Section 3.7 Seismic Design (115 page(s), 12/1/2010)
- ML103480517 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - Section 3.8 Design of Category I Structures (190 page(s), 12/1/2010)
- ML103480518 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - Section 3.9 Mechanical Systems and Components (169 page(s), 12/1/2010)
- ML103480519 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems – Table of Contents (26 page(s), 12/1/2010)
- ML103480520 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - APPENDIX 3A HVAC DUCTS AND DUCT SUPPORTS (4 page(s), 12/1/2010)
- ML103480521 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - APPENDIX 3B LEAK-BEFORE-BREAK EVALUATION OF THE AP1000 PIPING (43 page(s), 12/1/2010)
- ML103480522 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - APPENDIX 3C REACTOR COOLANT LOOP ANALYSIS METHODS (5 page(s), 12/1/2010)
- ML103480523 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - APPENDIX 3D METHODOLOGY FOR QUALIFYING AP1000 SAFETY-RELATED ELECTRICAL AND M (115 page(s), 12/1/2010)
- ML103480524 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - APPENDIX 3E HIGH-ENERGY PIPING IN THE NUCLEAR ISLAND (11 page(s), 12/1/2010)
- ML103480526 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - APPENDIX 3F CABLE TRAYS AND CABLE TRAY SUPPORTS (3 page(s), 12/1/2010)
- ML103480527 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - APPENDIX 3G NUCLEAR ISLAND SEISMIC ANALYSES (69 page(s), 12/1/2010)
- ML103480528 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - APPENDIX 3H AUXILIARY AND SHIELD BUILDING CRITICAL SECTIONS (74 page(s), 12/1/2010)
- ML103480529 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 3 - Design of Structures, Components, Equip. & Systems - APPENDIX 3I EVALUATION FOR HIGH FREQUENCY SEISMIC INPUT (73 page(s), 12/1/2010)
- ML103480530 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 4 – Reactor – Section 4.1 Summary Description (12 page(s), 12/1/2010)
- ML103480531 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 4 – Reactor – Section 4.2 Fuel System Design (54 page(s), 12/1/2010)
- ML103480532 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 4 – Reactor – Section 4.3 Nuclear Design (89 page(s), 12/1/2010)
- ML103480533 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 4 – Reactor – Section 4.4 Thermal and Hydraulic Design (42 page(s), 12/1/2010)
- ML103480534 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 4 – Reactor – Section 4.5 Reactor Materials (4 page(s), 12/1/2010)
- ML103480535 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 4 – Reactor – Section 4.6 Functional Design of Reactivity Control Systems (4 page(s), 12/1/2010)
- ML103480536 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 4 – Reactor – Table of Contents (7 page(s), 12/1/2010)
- ML103480537 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 5 – Reactor Coolant System and Connected Systems – Section 5.1 Summary Description (20 page(s), 12/1/2010)
- ML103480538 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 5 – Reactor Coolant System and Connected Systems – Section 5.2 Integrity of Reactor Coolant Pressure Boundary (41 page(s), 12/1/2010)
- ML103480539 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 5 – Reactor Coolant System and Connected Systems – Section 5.3 Reactor Vessel (40 page(s), 12/1/2010)
- ML103480540 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 5 – Reactor Coolant System and Connected Systems – Section 5.4 Component and Subsystem Design (102 page(s), 12/1/2010)
- ML103480541 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 5 – Reactor Coolant System and Connected Systems – Table of Contents (7 page(s), 12/1/2010)
- ML103480542 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 6 - Engineered Safety Features - Section 6.0 Engineered Safety Features (2 page(s), 12/1/2010)
- ML103480543 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 6 – Engineered Safety Features – Section 6.1 Engineered Safety Features Materials (14 page(s), 12/1/2010)
- ML103480544 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 6 – Engineered Safety Features – Section 6.2 Containment Systems (141 page(s), 12/1/2010)
- ML103480545 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 6 – Engineered Safety Features – Section 6.3 Passive Core Cooling System (73 page(s), 12/1/2010)
- ML103480546 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 6 – Engineered Safety Features – Section 6.4 Habitability Systems (22 page(s), 12/1/2010)
- ML103480547 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 6 – Engineered Safety Features – Section 6.5 Fission Product Removal and Control Systems (8 page(s), 12/1/2010)
- ML103480548 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 6 – Engineered Safety Features – Section 6.6 Inservice Inspection of Class 2 and 3 Components (4 page(s), 12/1/2010)
- ML103480549 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 6 – Engineered Safety Features – Table of Contents (8 page(s), 12/1/2010)
- ML103480551 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 6 - Engineered Safety Features - APPENDIX 6A FISSION PRODUCT DISTRIBUTION IN THE POST-DBA CONTAINMENT ATMOSPHERE (11 page(s), 12/1/2010)
- ML103480552 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 7 - Instrumentation and Controls - Section 7.1 Introduction (19 page(s), 12/1/2010)
- ML103480553 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 7 - Instrumentation and Controls - Section 7.2 Reactor Trip (47 page(s), 12/1/2010)
- ML103480554 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 7 - Instrumentation and Controls - Section 7.3 Engineered Safety Features (42 page(s), 12/1/2010)
- ML103480555 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 7 - Instrumentation and Controls - Section 7.4 Systems Required for Safe Shutdown (15 page(s), 12/1/2010)
- ML103480556 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 7 - Instrumentation and Controls - Section 7.5 Safety-Related Display Information (38 page(s), 12/1/2010)
- ML103480558 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 7 - Instrumentation and Controls - Section 7.6 Interlock Systems Important to Safety (6 page(s), 12/1/2010)
- ML103480559 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 7 - Instrumentation and Controls - Section 7.7 Control and Instrumentation Systems (26 page(s), 12/1/2010)
- ML103480560 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 7 - Instrumentation and Controls – Table of Contents (5 page(s), 12/1/2010)
- ML103480561 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 8 – Electric Power – Section 8.1 Introduction (10 page(s), 12/1/2010)
- ML103480562 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 8 – Electric Power – Section 8.2 Offsite Power System (4 page(s), 12/1/2010)
- ML103480563 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 8 – Electric Power – Section 8.3 Onsite Power Systems (65 page(s), 12/1/2010)
- ML103480564 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 8 – Electric Power – Table of Contents (3 page(s), 12/1/2010)
- ML103480565 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 9 – Auxiliary Systems – Section 9.1 Fuel Storage and Handling (76 page(s), 12/1/2010)
- ML103480566 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 9 – Auxiliary Systems – Section 9.2 Water Systems (67 page(s), 12/1/2010)
- ML103480567 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 9 – Auxiliary Systems – Section 9.3 Process Auxiliaries (67 page(s), 12/1/2010)
- ML103480568 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 9 – Auxiliary Systems – Section 9.4 Air-Conditioning, Heating, Cooling, and Ventilation System (120 page(s), 12/1/2010)
- ML103480569 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 9 – Auxiliary Systems – Section 9.5 Other Auxiliary Systems (78 page(s), 12/1/2010)
- ML103480570 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 9 – Auxiliary Systems – Table of Contents (12 page(s), 12/1/2010)
- ML103480571 - Westinghouse AP1000 Design Control Document Rev. 18 - Tier 2 Chapter 9 – Auxiliary Systems – APPENDIX 9A FIRE PROTECTION ANALYSIS (195 page(s), 12/1/2010)