Generic Letters - 1982
| File Name | Date | Description |
|---|---|---|
| gl82032 | 12/29/1982 | Draft Steam Generator Report (SAI) |
| gl82030 | 12/28/1982 | Filings Related to 10 CFR 50 Production and Utilization Facilities |
| gl82039 | 12/22/1982 | Problems with Submittals of Subsequent Information of CURT 73.21 For Licensing Reviews |
| gl82038 | Meeting to Discuss Developments for Operator Licensing Examinations | |
| gl82037 | This Generic Letter was Never Issued | |
| gl82036 | This Generic Letter was Never Issued | |
| gl82035 | This Generic Letter was Never Issued | |
| gl82034 | This Generic Letter was Never Issued | |
| gl82031 | This Generic Letter was Never Issued | |
| gl82033 | 12/17/1982 | Supplement 1 to NUREG-0737 - Emergency Response Capabilities |
| gl82029 | This Generic Letter was Never Issued | |
| gl82028 | 12/10/1982 | Inadequate Core Cooling Instrumentation System |
| gl82027 | 11/15/1982 | Transmittal of NUREG-0763 - Guidelines For Confirmatory In-Plant Tests of Safety-Relief Valve Discharge for BWR Plants |
| gl82026 | 11/12/1982 | NUREG-0744, REV. 1 - Pressure Vessel Material Fracture Toughness |
| gl82024 | 11/04/1982 | Safety Relief Valve Quencher Loads: BWR MARK II and III Containments |
| gl82025 | 11/03/1982 | Integrated IAEA Exercise for Physical Inventory at LWRS |
| gl82023 | 10/30/1982 | Inconsistency Between Requirements of 10CFR 73.40(D) and Standard Tech Specs For Performing Audits of Sadeguards Contin |
| gl82022 | 10/26/1982 | Congressional Request for Information Concerning Steam Generator Tube Integrity |
| gl82020 | 10/26/1982 | Guidance for Implementing the Standard Review Plan Rule |
| gl82018 | 10/12/1982 | Reactor Operator and Senior Reactor Operator Requalification Examinations |
| gl82021 | 10/06/1982 | Fire Protection Audits |
| gl82019 | 10/05/1982 | Submittal of Copies of Documentation to NRC-Copy Requirements for Emergency Plans and Physical Security Plans |
| gl82017 | 10/01/1982 | Inconsistecny of Requirements Between 50.54(T) and 50.15 |
| gl82016 | 09/20/1982 | NUREG-0737 Technical Specifications |
| gl82015 | This Generic Letter was Never Issued | |
| gl82014 | 08/09/1982 | Submittal of Documents to the NRC |
| gl82013 | 06/17/1982 | Reactor Operator and Senior Reactor Operator Examinations |
| gl82012 | 06/15/1982 | Nuclear Power Plant Staff Working Hours |
| gl82011 | 06/09/1982 | Transmittal of NUREG-0916 Relative to the Restart of R.E. Ginna Nuclear Power Plant |
| gl82010 | 05/05/1982 | Post-TMI Requirements |
| gl82009 | 04/20/1982 | Environmental Qualification of Safety Related Electrical Equipment |
| gl82008 | 04/15/1982 | Transmittal of NUREG-0909 Relative to the Ginna Tube Rupture |
| gl82007 | 04/15/1982 | Transmittal of NUREG-0909 Relative to the Ginna Tube Rupture |
| gl82006 | This Generic Letter was Never Issued | |
| gl82003 | 03/31/1982 | High Burnup MAPLHGR Limits |
| gl82005 | 03/17/1982 | Post-TMI Requirements |
| gl82004 | 03/09/1982 | Use of INPO See-in Program |
| gl82002 | 02/08/1982 | Commission Policy on Overtime |
| gl82001 | 01/12/1982 | New Applications Survey |