Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
CR-80-25 |
Case Histories of Radiography Events |
-- |
12/05/1980 |
-- |
CR-80-24 |
AECL Teletherapy Unit Malfunction |
-- |
12/02/1980 |
-- |
CR-80-23 |
Potential Defects in Beloit Power Systems Emergency Generators |
-- |
10/31/1980 |
-- |
CR-80-22 |
Confirmation of Employee Qualifications |
-- |
10/02/1980 |
-- |
CR-80-21 |
Regulation of Refueling Crews |
-- |
09/10/1980 |
-- |
CR-80-20 |
Changes in Safe-Slab Tank Dimensions |
-- |
08/21/1980 |
-- |
CR-80-19 |
Noncompliance with License Requirements for Medical Licensees |
-- |
08/18/1980 |
-- |
CR-80-18 |
10 CFR 50.59 Safety Evaluations for Changes to Radioactive Waste Treatment Systems |
W |
81 FR 73448
10/25/16 |
-- |
08/22/1980 |
CR-80-17 |
Fuel Pin Damage Due to Water Jet from Baffle Plate Corner |
-- |
07/23/1980 |
-- |
CR-80-16 |
Operational Deficiencies in Rosemount Model 510DU Trip Units and Model 1152 Pressure Transmitters |
-- |
06/27/1980 |
-- |
CR-80-15 |
Loss of Reactor Coolant Pump Cooling and Natural Circulation Cooldown |
-- |
06/20/1980 |
-- |
CR-80-14 |
Radioactive Contamination of Plant Demineralized Water System and Resultant Internal Contamination of Personnel |
-- |
06/24/1980 |
-- |
CR-80-13 |
Grid Strap Damage in Westinghouse Fuel Assemblies |
-- |
05/28/1980 |
-- |
CR-80-12 |
Valve-Shaft-to-Actuator Key May Fall Out of Place when Mounted Below Horizontal Axis |
-- |
05/14/1980 |
-- |
CR-80-11 |
Emergency Diesel Generator Lube Oil Cooler Failures |
-- |
05/13/1980 |
-- |
CR-80-10 |
Failure to Maintain Environmental Qualification of Equipment |
-- |
04/29/1980 |
-- |
CR-80-09 |
Problems with Plant Internal Communications Systems |
-- |
04/28/1980 |
-- |
CR-80-08 |
BWR Technical Specification Inconsistency - RPS Response Time |
-- |
04/18/1980 |
-- |
CR-80-07 |
Problems with HPCI Turbine Oil System |
-- |
04/03/1980 |
-- |
CR-80-06 |
Control and Accountability Systems for Implant Therapy Sources |
-- |
04/14/1980 |
-- |
CR-80-05 |
Emergency Diesel-Generator Lubricating Oil Addition and Onsite Supply |
-- |
04/01/1980 |
-- |
CR-80-04 |
Securing of Threaded Locking Devices on Safety-Related Equipment |
-- |
03/14/1980 |
-- |
CR-80-03 |
Protection from Toxic Gas Hazards |
-- |
03/06/1980 |
-- |
CR-80-02 |
Nuclear Power Plant Staff Work Hours |
-- |
02/01/1980 |
-- |
CR-80-01 |
Service Advice for GE Induction Disc Relays |
-- |
01/17/1980 |
-- |