Issued Combined Licenses for Turkey Point, Units 6 and 7 Application

On June 30, 2009, Florida Power & Light Company (FPL) submitted its application for combined licenses (COLs) for two Westinghouse Advanced Passive 1000 (AP1000) Pressurized Water Reactors (PWRs) designated as Turkey Point, Units 6 and 7.

For detail (including the latest submittal of the application, the related review schedule, and the associated staff documentation), see the following topics on this page:

Reference Documents

In accordance with Title 10, Part 52, of the Code of Federal Regulations (10 CFR Part 52), "Licenses, Certifications, and Approvals for Nuclear Power Plants," a COL application may reference a standard design certification, an early site permit, both, or neither. Many COL applications have referenced an application for design certification, in accordance with 10 CFR 52.55(c). On that basis, FPL referenced Westinghouse's application to amend the AP1000 standard design certification and cited the following amended design control document (DCD) in its COL original application for Turkey Point, Units 6 & 7:

To top of page

Application Information

The following table provides access to the COL Application that FPL submitted for Turkey Point, Units 6 & 7.

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Final Safety Analysis Report and associated Technical/Topical Reports would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Part Description Revision
0 Combined License Application Cover Letter Rev. 8*
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
1 Administrative and Financial Information Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
2 Final Safety Analysis Report (FSAR) Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
3 Environmental Report Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
4 Technical Specifications Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
5 Emergency Plan (excludes sensitive State and Local Emergency Plans) Rev. 8
Rev. 7
Rev. 5
Rev. 3
Rev. 2
Rev. 1
Rev. 0
6 Limited Work Authorization (LWA) Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 2
Rev. 0
7 Departures and Exemption Requests Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
8 Safeguards/Security Plans [This Part contains safeguards information which is withheld from public availability]  
9 [This Part contains other information which is withheld from public availability]  
10 License Conditions and Inspection, Tests, Analyses and Acceptance Criteria (ITAAC) Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
11 COLA Enclosure 1 (Quality Assurance Program Plan and Geotechnical Data) Rev. 8
Rev. 7
Rev. 6
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

* A "roadmap" providing a discussion of the Revision 8 changes to the application was provided in a Florida Power and Light Company letter dated September 16, 2016.

To top of page

Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 06/30/09 - A
Acceptance Review
Acceptance Review Start
06/30/09 - A
Docketing Decision Letter Issued/Acceptance Review Complete
09/04/09 - A
Review Schedule Established/Schedule Letter Issued to Applicant
10/27/15 - A
Safety Review
Phase A - Requests for Additional Information (RAIs) and Supplemental RAIs
06/16/15 - A
Phase B - Advance Final safety evaluation report (SER) without Open Items
07/14/16 - A
Phase C - ACRS Review of Advance Final SER
08/19/16 - A
Phase D - Final SER
11/10/16 - A
Environmental Review
Phase 1 - Environmental impact statement (EIS) scoping summary report issued
12/10 - A
Phase 2 - Draft EIS issued to EPA
02/27/15 - A
Phase 3 - Final EIS issued to EPA
10/28/16 - A
Supplement to Final EIS issued
12/02/16 - A
Hearing
ASLB holds evidentiary hearing
05/02 - 03/17 - A
Commission holds mandatory hearing
12/12/17 - A
License
Commission decision on issuance of COL application
04/05/18 - A

To top of page

Safety Evaluations

This section lists the Safety Evaluations that the NRC has issued in connection with its review of the COL application that FPL submitted for Turkey Point, Units 6 & 7.

To top of page

Environmental Impact Statement

This section lists the Environmental Impact Statement that the NRC has issued in review of the COL application that FPL submitted for Turkey Point, Units 6 & 7.

To top of page

Topical Reports

The NRC has issued no Topical Reports in connection with its review of the COL application that FPL submitted for Turkey Point, Units 6 & 7.

To top of page

Combined Licenses (COLs)

This section provides the COLs that the NRC issued on April 12, 2018, in connection with its review of the COL application for Turkey Point, Units 6 and 7.

To top of page

Summary Record of Decision

This section provides the Summary Record of Decision that the NRC issued in connection with its review of the COL application for Turkey Point, Units 6 and 7.

To top of page

To top of page

Contacts

Contacts for the Turkey Point COL Application
Safety Project Manager Billy Gleaves
Environmental Project Manager Alicia Williamson
Contact a Public Affairs Officer

To top of page