Home > NRC Library > ADAMS Public Documents
FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report)
Accession Number: ML13357A396
Date Released: Monday, January 6, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13357A332 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Master Table of Contents (24 page(s), 12/16/2013)
- ML13357A333 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 1 - Introduction and General Description of the Plant (131 page(s), 12/16/2013)
- ML13357A334 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.0 - Site Characteristics (14 page(s), 12/16/2013)
- ML13357A336 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.1 - Geography and Demography (47 page(s), 12/16/2013)
- ML13357A337 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.2 - Nearby Industrial, Transportation, and Military Facilities (79 page(s), 12/16/2013)
- ML13357A338 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.3 - Meteorology (194 page(s), 12/16/2013)
- ML13357A339 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.1 - Hydrologic Description (52 page(s), 12/16/2013)
- ML13357A340 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.2 - Floods (48 page(s), 12/16/2013)
- ML13357A341 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.3 - Probable Maximum Flood on Streams and Rivers (4 page(s), 12/16/2013)
- ML13357A342 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.4 - Potential Dam Failures (3 page(s), 12/16/2013)
- ML13357A343 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.5 - Probable Maximum Surge and Seiche Flooding (35 page(s), 12/16/2013)
- ML13357A344 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.6 - Probable Maximum Tsunami Hazards (219 page(s), 12/16/2013)
- ML13357A345 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.7 - Ice Effects (11 page(s), 12/16/2013)
- ML13357A346 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.8 - Cooling Water Canals and Reservoirs (5 page(s), 12/16/2013)
- ML13357A347 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.9 - Channel Diversions (8 page(s), 12/16/2013)
- ML13357A348 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.10 - Flooding Protection Requirements (3 page(s), 12/16/2013)
- ML13357A349 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.11 - Low Water Considerations (11 page(s), 12/16/2013)
- ML13357A351 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater (107 page(s), 12/16/2013)
- ML13357A352 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater - Appendix 2AA - Transducer Data (23 page(s), 12/16/2013)
- ML13357A353 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater - Appendix 2BB - Aquifer Pumping Test Results (104 page(s), 12/16/2013)
- ML13357A354 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater - Appendix 2CC - Groundwater Model Development and Analysis (144 page(s), 12/16/2013)
- ML13357A355 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater - Figures 201-225 (30 page(s), 12/16/2013)
- ML13357A356 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater - Figures 226-247 (35 page(s), 12/16/2013)
- ML13357A357 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater - Figures 248-253 (12 page(s), 12/16/2013)
- ML13357A359 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.13 - Accidental Releases of Radioactive Liquid Effluents in Ground and Surface Waters (56 page(s), 12/16/2013)
- ML13357A360 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.14 - Technical Specification and Emergency Operation Requirements (2 page(s), 12/16/2013)
- ML13357A361 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.15 - Combined License Information (3 page(s), 12/16/2013)
- ML13357A362 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.0 - Geology, Seismology, and Geotechnical Engineering (12 page(s), 12/16/2013)
- ML13357A363 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information (393 page(s), 12/16/2013)
- ML13357A364 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information - Figures 201-228 (31 page(s), 12/16/2013)
- ML13357A365 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information - Figures 229-252 (24 page(s), 12/16/2013)
- ML13357A366 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information - Figures 253-278 (30 page(s), 12/16/2013)
- ML13357A367 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information - Figures 279-303 (25 page(s), 12/16/2013)
- ML13357A369 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information - Figures 304-322 (21 page(s), 12/16/2013)
- ML13357A370 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information - Figures 323-389 (79 page(s), 12/16/2013)
- ML13357A371 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.2 - Vibratory Ground Motion (318 page(s), 12/16/2013)
- ML13357A372 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.3 - Surface Faulting (25 page(s), 12/16/2013)
- ML13357A373 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.4 - Stability of Subsurface Materials and Foundations (158 page(s), 12/16/2013)
- ML13357A375 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.5 - Stability of Slopes (6 page(s), 12/16/2013)
- ML13357A376 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.6 - Combined License Information (4 page(s), 12/16/2013)
- ML13357A378 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Appendix 2.5AA - Potential for Carbonate Dissolution and Karst Development (53 page(s), 12/16/2013)
- ML13357A379 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 3 - Design of Structures, Components, Equipment and Systems (286 page(s), 12/16/2013)
- ML13357A380 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 4 - Reactor (7 page(s), 12/16/2013)
- ML13357A381 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 5 - Reactor Coolant System and Connected Systems (21 page(s), 12/16/2013)
- ML13357A382 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 6 - Engineered Safety Features (26 page(s), 12/16/2013)
- ML13357A383 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 7 - Instrumentation and Controls (11 page(s), 12/16/2013)
- ML13357A384 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 8 - Electric Power (27 page(s), 12/16/2013)
- ML13357A385 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 9 - Auxiliary Systems (77 page(s), 12/16/2013)
- ML13357A386 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 10 - Steam and Power Conversion (27 page(s), 12/16/2013)
- ML13357A387 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 11 - Radioactive Waste Management (35 page(s), 12/16/2013)
- ML13357A388 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 12 - Radiation Protection (25 page(s), 12/16/2013)
- ML13357A389 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 13 - Conduct of Operations (74 page(s), 12/16/2013)
- ML13357A390 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 14 - Initial Test Program (45 page(s), 12/16/2013)
- ML13357A391 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 15 - Accident Analyses (13 page(s), 12/16/2013)
- ML13357A392 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 16 - Technical Specifications (4 page(s), 12/16/2013)
- ML13357A393 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 17 - Quality Assurance (10 page(s), 12/16/2013)
- ML13357A394 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 18 - Human Factors Engineering (18 page(s), 12/16/2013)
- ML13357A395 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 19 - Probabilistic Risk Assessment (86 page(s), 12/16/2013)