Safety Evaluations with Open Items for Comanche Peak Nuclear Power Plant, Units 3 and 4 Application

The following table provides access to Safety Evaluations with Open Items that the NRC has issued in connection with its review of the COL application that Luminant submitted for Comanche Peak Nuclear Power Plant, Units 3 & 4.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
1 Introduction and General Description of Plant TBD
2 Sections 2.0 through 2.3 03/29/13
3 Design of Structures, Components, Equipment, and Systems TBD
4 Reactor 10/17/12
5 Reactor Coolant Connecting Systems 04/28/11
6 Engineered Safety Features 08/02/13
7 Instrumentation and Controls Systems 03/26/13
8 Electric Power 07/05/11
9 Auxiliary Systems 08/02/13
10 Steam and Power Conversion Systems 07/21/11
11 Radioactive Waste Management 09/20/11
12 Radiation Protection 09/28/11
13 Conduct of Operations 12/06/11
14 Initial Test Program TBD
15 Accident and Analysis 06/25/12
16 Technical Specifications 02/14/13
17 Quality Assurance 01/04/13
18 Human Factors Engineering TBD
19 Probabilistic Risk Assessment and Severe Accident Evaluation 02/06/13