Chapter Description Date
1 Introduction and General Description of Plant TBD
2 Site Characteristics TBD
3 Design of Structures, Components, Equipment, and Systems TBD
4 Reactor TBD
5 Reactor Coolant Connecting Systems TBD
6 Engineered Safety Features TBD
7 Instrumentation and Controls Systems TBD
8 Electric Power TBD
9 Auxiliary Systems TBD
10 Steam and Power Conversion Systems TBD
11 Radioactive Waste Management TBD
12 Radiation Protection TBD
13 Conduct of Operations TBD
Conduct of Operations - 13.7 Fitness for Duty 10/01/13
14 Initial Test Program TBD
15 Accident and Analysis TBD
16 Technical Specifications TBD
17 Quality Assurance TBD
18 Human Factors Engineering TBD