Home > NRC Library > ADAMS Public Documents
Seabrook - Rev. 12 to Updated Final Safety Analysis Report, Revision 9 to Appendix R, "Fire Protection Safe Shutdown Capability," Revision 10 to Appendix A, "Evaluation & Comparison to BTP APCSB 9.5-1," & Revision 112 to Technical Requirements Manual.
Accession Number: ML091280201
Date Released: Tuesday, April 26, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML091280241 - Seabrook - Rev. 12 to Updated Final Safety Analysis Report, Revision 9 to Appendix R, "Fire Protection Safe Shutdown Capability," Revision 10 to Appendix A, "Evaluation & Comparison to BTP APCSB 9.5-1," & Revision 112 to Technical Requirements Manual. (26 page(s), 11/3/2008)
- ML091330435 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Introduction through Chapter 1, Introduction and General Description of Plant. (295 page(s), 11/3/2008)
- ML091330419 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 2, Figures 2.3-1 through 2.3-11. (12 page(s), 11/3/2008)
- ML091330428 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2A, Onsite Meteorological Data Summaries, November 1971-March 1973. (101 page(s), 11/3/2008)
- ML091330429 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2B, Onsite Meteorological Data Summaries, April 1979-March 1980. (31 page(s), 11/3/2008)
- ML091330430 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2C, Geologic Investigations of the Scotland Road Fault (Clinton - Newbury Fault), Newbury, Massachusetts, and Portsmouth Fault Investigations. (135 page(s), 11/3/2008)
- ML091330431 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area. (116 page(s), 11/3/2008)
- ML091330432 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2E, Historical Earthquakes in the Site Vicinity. (135 page(s), 11/3/2008)
- ML091330405 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2F, Geotechnical Report - Reactor Borings, July 1974. (82 page(s), 11/3/2008)
- ML091330406 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2G, Static Dynamic Rock Properties. (102 page(s), 11/3/2008)
- ML091330407 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2J, Sample Descriptions for Borings Made in November-December 1972. (66 page(s), 11/3/2008)
- ML091330408 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 2L, Geologic Investigation of Soils and the Bedrock Surface at Unit 2 Containment Site. (238 page(s), 11/3/2008)
- ML091330411 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 3, Design of Structures, Components, Equipment and Systems. (743 page(s), 11/3/2008)
- ML091330433 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 3, Design of Structures, Components, Equipment and Systems, Figures. (157 page(s), 11/3/2008)
- ML091330448 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 3A, Pipe Break Analysis Summary through Figure 3.F-3. (67 page(s), 11/3/2008)
- ML091330450 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 3G, Containment Liner Anchor Load Tests and 3H. (59 page(s), 11/3/2008)
- ML091330453 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Appendix 3I, Report on Analysis of High Energy Line Breaks Outside Containment. (77 page(s), 11/3/2008)
- ML091330478 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 4, Reactor. (243 page(s), 11/3/2008)
- ML091330476 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 5, Reactor Coolant System and Connected Systems. (221 page(s), 11/3/2008)
- ML091330461 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 6, Engineered Safety Features. (555 page(s), 11/3/2008)
- ML091330462 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 7, Instrumentation and Controls. (326 page(s), 11/3/2008)
- ML091330438 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 9, Auxiliary Systems. (694 page(s), 11/3/2008)
- ML091330439 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 10, Steam and Power Conversion System. (147 page(s), 11/3/2008)
- ML091330440 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 11, Radioactive Waste Management. (195 page(s), 11/3/2008)
- ML091330441 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 12, Radiation Protection. (210 page(s), 11/3/2008)
- ML091330443 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 13, Conduct of Operations. (44 page(s), 11/3/2008)
- ML091330444 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 14, Initial Test Program. (154 page(s), 11/3/2008)
- ML091330445 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 15, Accident Analyses. (593 page(s), 11/3/2008)
- ML091330456 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance. (71 page(s), 11/3/2008)
- ML091330518 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 5, Drawings. (15 page(s), 11/3/2008)
- ML091330483 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 7, Drawings. (18 page(s), 11/3/2008)
- ML091330490 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 9, Drawings, Part 2 of 4. (39 page(s), 11/3/2008)
- ML091330491 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 9, Drawings, Part 3 of 4. (42 page(s), 11/3/2008)
- ML091330493 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 9, Drawings, Part 4 of 4. (20 page(s), 11/3/2008)
- ML091330494 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 10, Drawings. (44 page(s), 11/3/2008)
- ML091330495 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 11, Drawings. (23 page(s), 11/3/2008)
- ML091330542 - Seabrook - Fire Protection of Safe Shutdown Capability (10CFR50, Appendix R, Revision 9. (639 page(s), 11/3/2008)
- ML091330544 - Seabrook - Technical Requirements, Revision 112. (208 page(s), 11/3/2008)
- ML16117A552 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 3, Drawings, Part 1 of 3 - Redacted. (12 page(s), 11/3/2008)
- ML16117A554 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 3, Drawings, Part 3 of 3 - Redacted. (13 page(s), 11/3/2008)
- ML16117A559 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 3, Drawings, Part 2 of 3 - Redacted. (11 page(s), 11/3/2008)
- ML16195A375 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 2, Site Characteristics - Redacted. (614 page(s), 11/3/2008)
- ML16195A382 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 2, Site Characteristics, Figures 2.1-1 through Figure 2.1-32 - Redacted. (33 page(s), 11/3/2008)
- ML16195A388 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 2, Figures 2.-4-1 through 2.4-32 - Redacted. (33 page(s), 11/3/2008)
- ML16195A399 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 2, Figures 2.5-1 through 2.5-49, Sheet 2 of 2 - Redacted. (50 page(s), 11/3/2008)
- ML16195A404 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 2, Figures 2.-5-50, Sheet 1 of 2 through 2.5-71 - Redacted. (23 page(s), 11/3/2008)
- ML16195A426 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 8, Electric Power - Redacted. (267 page(s), 11/3/2008)
- ML16195A431 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 8, Drawings, Part 1 of 3 - Redacted. (22 page(s), 11/3/2008)
- ML16195A433 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 8, Drawings, Part 3 of 3 - Redacted. (20 page(s), 11/3/2008)
- ML16195A439 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 9, Drawings, Part 1 of 4 - Redacted. (35 page(s), 11/3/2008)
- ML16195A452 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 12, Drawings - Redacted. (21 page(s), 11/3/2008)
- ML16195A454 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 1, Drawings, Part 1 of 6 - Redacted. (10 page(s), 11/3/2008)
- ML16195A467 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 6, Drawings - Redacted. (14 page(s), 11/3/2008)
- ML16195A469 - Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 8, Drawings, Part 2 of 3 - Redacted. (23 page(s), 11/3/2008)
- ML16195A472 - Seabrook Station - Evaluation and Comparison to BTP APCSB 9.5-1, Appendix A Revision 10 - Redacted. (579 page(s), 11/3/2008)