Home > NRC Library > ADAMS Public Documents
FOIA/PA-2001-0256 - Resp 7 - Partial.
Accession Number: ML013610265
Date Released: Thursday, December 13, 2001
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML020020207 - FOIA/PA-2001-0256 - Resp 7 - Partial. (13 page(s), 12/5/2001)
- ML013510020 - Handwritten Telecon Summary re IP-2. (2 page(s), 4/3/1997)
- ML013510023 - E-mail from C. Beardslee, NRR, to S. Coffin, NRR, Re: Indian Point 2 SG Inspection Plan-Forwarded Item 2. (1 page(s), 4/7/1997)
- ML013510026 - 05/27/2001 Telephone call summary with licensee re ongoing steam generator tube inspection. (2 page(s), 5/27/1997)
- ML013510031 - E-mail from W. Shack, Argonne National Laboratory (ANL), to J. Muscara, RES, S. Coffin, NRR, Re: Indian Point 2 w/Attached 03/27/2000 Memo from S. Akhtiari, ANL, to J. Muscara, RES. (10 page(s), 6/22/2000)
- ML013510036 - Note to Editors: Announcement of NRC Issuance of Special Inspections Preliminary Findings with notes. (1 page(s), 12/23/1997)
- ML013510038 - Indian Point 2 - Steam Generator Special Inspection - communication Plan Questions & Answers. (11 page(s), 12/5/2001)
- ML013510045 - Communications Summary for Final Significance Determination & Notice of Violation (NRC Inspection Report 05000247/2000-006). (21 page(s), 12/5/2001)
- ML013510052 - Summary of Findings, Indian Point 2 Nuclear Power Plant, NRC Inspection Report 05000247/2000-007. (2 page(s), 12/5/2001)
- ML013510058 - Draft Memo from S. Long, NRR, to R. Barrett, NRR, Re: Risk Assessment for Condition of Indian Point Unit 2 Steam Generator Tubes During Operational Cycle 14. (7 page(s), 12/5/2001)
- ML013510061 - Untitled paragraph concerning risk at IP2 if 3 x delta-P criterion met. Contains hand-written notes by S. Long, NRR. (1 page(s), 12/5/2001)
- ML013510063 - Another version of S. Long, NRR, PR paragraph.wpd file containing handwritten marginal comments by S. Long, NRR. (1 page(s), 12/5/2001)
- ML013510077 - Hard copy of file named "IP2 anonymous question 4.wpd file containing handwritten marginal comments by S. Long, NRR." (2 page(s), 12/5/2001)
- ML013510081 - Handwritten notes: Op Center Event Chronology for SFTF event at IP2 (S. Long, NRR). (3 page(s), 12/5/2001)
- ML013510082 - Handwritten notes: POD (S. Long, NRR). (1 page(s), 12/5/2001)
- ML013510085 - Table 3.4-5 (cont), Listing of Core Damage Sequences that Contribute to Containment Failure Plant Damage States w/marginal notes (S. Long, NRR). (1 page(s), 12/5/2001)
- ML013510086 - Handwritten notes: IP2 Telcon w/Licensee (pre pub mtg) (S. Long, NRR). (1 page(s), 2/29/2000)
- ML013510090 - Fax from S. Long, NRR, to P. Ellison, INEEL, transmitting copy of UCS et al petition with S. Long's handwritten comments. (6 page(s), 3/17/2000)
- ML013510092 - S. Long, NRR, computer file named "Petition Item 2 issue.wpd." (1 page(s), 3/17/2000)
- ML013510095 - Draft typed notes "The following is a list of information EMCB expects to receive from licensee supplementing information..." (3 page(s), 3/22/2000)
- ML013510096 - Draft typed notes "The following is a list of information EMCB expects to receive from licensee in order to support development of final paper subsequent to IP2 steam generator tube failure." (2 page(s), 3/22/2000)
- ML013510098 - Westinghouse Presentation to Con Edison on the Status of Steam Generator Conditioning Monitoring and Operational Assessment of the Indian Point Unit 2 Steam Generator. (3 page(s), 4/14/2000)
- ML013510140 - Handwritten Notes : Telecon with IP2 (S. Long, NRR). (5 page(s), 4/19/2000)
- ML013510108 - E-mail from E. Sullivan, NRR, to E. Murphy, NRR, Re: Root Cause Evaluation. (1 page(s), 4/19/2000)
- ML013510110 - S. Long, NRR, Computer file named "Risk Ass Insert.Wpd". (1 page(s), 4/25/2000)
- ML013510112 - Draft Segments of Various Sections of RAI. (3 page(s), 4/27/2000)
- ML013510114 - Handwritten Notes: IP2 Conf Call. (1 page(s), 4/27/2000)
- ML013510316 - Profiles of Tube r34c51 of Steam Generator 22. (6 page(s), 5/16/2000)
- ML013510118 - S. Long, NRR, Computer File Named "Risk Para on 3dp". (1 page(s), 7/19/2000)
- ML013510146 - S. Long, NRR, Computer file named "Risk Para on 3dp". (1 page(s), 7/20/2000)
- ML013510319 - S. Long, NRR, Computer file Named "SDP Risk Assessment" Memo from R. Barrett, NRR, to a Blough, RI. (8 page(s), 8/1/2000)
- ML013510152 - S. Long, NRR, Computer File Named "Commun Plan QZ.wpd" What is the Difference between the NRC's Risk Assessment and the One Produced by the Con Ed?. (1 page(s), 8/24/2000)
- ML013510329 - S. Long, NRR, Computer File Named "Slides for CA Brief.wpd". (5 page(s), 8/24/2000)
- ML013510333 - E-mail from E. Adensam, NRR to A. Madison, E. Murphy, J. Strosnider, J. Zwolinski, NRR, Subject "Support at IP2 Regulatory Conference". (1 page(s), 9/27/2000)
- ML013510339 - E-mail from J. Parry, Con Ed, to J. Trapp, RI, RE: SGTF Calculation w/Attached File "IP2 SGTL Post RC Risk Assessment.wpd". (4 page(s), 10/2/2000)
- ML013510366 - Draft Notes: "The Licensee's Risk Assessment Consists of two Components." (1 page(s), 10/20/2000)
- ML013510371 - S. Long, NRR Computer File Named "Final Risk Assessment.wpd" Labeled "Draft 10/23/00 3:00 pm, Significance Determination Risk Assessment for Indian Point...Review of Licenses Response to Initial Significance Determination and Final Analysis. (9 page(s), 10/23/2000)
- ML013510377 - Draft Significance Determination Risk Assessment for Indian Point Unit 2, Steam Generator Inspection Findings - Review of Licenses Response to Initial Significance Determination and Final Analysis", Includes Hand-Written Marginal Notes by S. Long, NRR. (10 page(s), 10/24/2000)
- ML013550429 - S. Long, NRR Computer File Named "Final Risk Assessment rev.1.wpd" Labeled "Draft 10/29/00 1:00 pm, Significance Determination Risk Assesssment for Indian Point Unit 2 Steam Generator Inspection Findings. (11 page(s), 10/29/2000)
- ML013550430 - S. Long, NRR Computer File Named "Diaz brf sld.wpd" Sequences of Interest for Risk Assessments w/Degraded Steam Generator Tubes. (1 page(s), 11/16/2000)
- ML013550431 - S. Long, NRR, Computer file Named "PR Paragraph.wpd". (2 page(s), 11/16/2000)
- ML013550432 - E-mail S. Long, NRR to B. Hollan, RI, Subject "IP2 Event CCDPs Con Ed". (1 page(s), 12/18/2000)
- ML013550433 - E-mail S. Long, NRR, to B. Holian, RI, Subject "Re: Con Ed Appeal Date". (1 page(s), 12/18/2000)
- ML013550435 - E-mail S. Long, NRR, to B. Holian, RI, Subject "IP2 Event CCDPs Combined". (1 page(s), 12/21/2000)
- ML013550437 - E-mail from S. Long, NRR to R Barrett, NRR, Fwd: IP2 Event CCDPs Combined. (1 page(s), 12/21/2000)
- ML013550439 - E-mail S. Long, NRR, to P. O'Rielly and S. Weerakkody, RES, Subject "Combination of IP2 LOSP and SGTR Events". (2 page(s), 1/2/2001)
- ML013550441 - E-mail S. Long NRR to B. Holian RI Subject "IP2 Appeal Deadline?". (1 page(s), 1/3/2001)
- ML013550444 - S. Long, NRR, Computer File Named "SDP Glitches". (1 page(s), 1/10/2001)
- ML013550449 - Ltr Con Ed to NRC, Re: Reply to a Notice of Violation-NRC Inspection Report 05000247/2000-00 w/S. Long, NRR Marginal Notes. (34 page(s), 1/19/2001)
- ML013550454 - S. Long NRR Computer Filed Named "mc0609 final.wpd" Containing Document Titled "NRC Inspection Manual Chapter 0609 Significance Determination Process" Provided by NRR/DIPM/IIPB. (9 page(s), 1/23/2001)
- ML013550458 - S. Long, NRR, Computer File Named "0609 A Final.wpd" Containing a Document Titled "Appendix A Significance Determination of Reactor Inspection Findings for At-Power Situations". (37 page(s), 1/23/2001)
- ML013550458 - S. Long, NRR, Computer File Named "0609 A Final.wpd" Containing a Document Titled "Appendix A Significance Determination of Reactor Inspection Findings for At-Power Situations". (37 page(s), 1/23/2001)
- ML013550461 - Email Regarding Draft of Answer to IP2 Anonymous Qs. (3 page(s), 1/23/2001)
- ML013550461 - Email Regarding Draft of Answer to IP2 Anonymous Qs. (3 page(s), 1/23/2001)
- ML013550465 - Indian Point 2 Response to Violation 50-247/2000-10, Con Ed Letter, Appendix B. (3 page(s), 1/29/2001)
- ML013550465 - Indian Point 2 Response to Violation 50-247/2000-10, Con Ed Letter, Appendix B. (3 page(s), 1/29/2001)
- ML013550466 - E-mail T. Frye, NRR, to S. Long, NRR, re: IP2 Question 4, with Attachment "Anonymous Q Answer.wpd". (3 page(s), 2/2/2001)
- ML013550466 - E-mail T. Frye, NRR, to S. Long, NRR, re: IP2 Question 4, with Attachment "Anonymous Q Answer.wpd". (3 page(s), 2/2/2001)
- ML013550468 - E-mail S. Long, NRR, to T. Frye, NRR, Re: "IP2 Question 4" with Attachment "Anonymous Q Answer.wpd". (4 page(s), 2/6/2001)
- ML013550468 - E-mail S. Long, NRR, to T. Frye, NRR, Re: "IP2 Question 4" with Attachment "Anonymous Q Answer.wpd". (4 page(s), 2/6/2001)
- ML013550481 - E-mail S. Long, NRR, to P. Milano and T. Frye, NRR, Re: "IP2 Question 4" and "Anonymous Q Answer.wpd". (5 page(s), 2/7/2001)
- ML013550481 - E-mail S. Long, NRR, to P. Milano and T. Frye, NRR, Re: "IP2 Question 4" and "Anonymous Q Answer.wpd". (5 page(s), 2/7/2001)
- ML013550483 - E-mail T Frye, NRR, to D. Coe, P. Koltay and S. Long, NRR, Re: SDP and IP2. (1 page(s), 2/9/2001)
- ML013550483 - E-mail T Frye, NRR, to D. Coe, P. Koltay and S. Long, NRR, Re: SDP and IP2. (1 page(s), 2/9/2001)
- ML013550488 - E-mail S. Long, NRR, to D. Coe, NRR, Re: "SDP and IP2". (3 page(s), 2/13/2001)
- ML013550494 - E-mail T. Frye, NRR, to S. Long, NRR, re: Revised Writtenup to Q4 for IP2, with Attached Wordperfect file Named "IP2 Anonymous Question 4-Rev 1.wpd". (3 page(s), 2/13/2001)
- ML013550497 - S. Long, NRR, Computer File Named "Combined Failure Cutsets Example.wpd". (1 page(s), 2/13/2001)
- ML013550501 - E-mail P. Mialno, NRR, to S. Long NRR, Re: IP2 Questions. (1 page(s), 2/15/2001)
- ML013550503 - E-mail T. Frye, NRR, to P. Milano, NRR, Re: IP2 Question 4. (3 page(s), 2/15/2001)
- ML013550506 - E-mail P. Milano, NRR, to T. Frye, NRR, Re: IP2 Question 4. (1 page(s), 2/15/2001)
- ML013550512 - E-mail S. Long, NRR, to T. Frye, NRR, Re: Revised WrittenUp Q 4 for IP2. (1 page(s), 2/28/2001)
- ML013550519 - E-mail T. Frye, NRR, to D. Coe and S. Long, NRR, Re: Revised Writteup to Question 4 for IP2. (1 page(s), 3/1/2001)
- ML013550521 - E-mail from S Long, NRR to S Weerakkody, RES, subject "Re: Write-Up." (1 page(s), 3/5/2001)
- ML013550525 - E-mail from S Long, NRR to P Milano, NRR regarding answer to anonymous question #1 with attached WordPerfect file named "Answer to Anonymous Question # 1." (3 page(s), 3/5/2001)
- ML013550528 - E-mail from D Coe, NRR to G Parry, P Koltay, P Wilson, S Long and T Frye, NRR regarding how to handle SDP for concurrent reactor safety inspection findings. (1 page(s), 3/7/2001)
- ML013550529 - E-mail from S Long, NRR to P Wilson, NRR regarding ASP analysis of IP2 SGTF event. (1 page(s), 3/26/2001)
- ML013550530 - E-mail from S Long, NRR to P Milano, NRR regarding Help on Question 1. (1 page(s), 3/27/2001)
- ML013550532 - E-mail from S Long, NRR to P Milano, NRR regarding Clarified Q1 paragraph. (2 page(s), 3/28/2001)
- ML013550534 - Anonymous Q Answer rev 1.wpd. (2 page(s), 3/28/2001)
- ML013550538 - E-mail from S Long, NRR to P Milano, NRR, regarding Latest try at Q1. (2 page(s), 3/29/2001)
- ML013550540 - S Long, NRR, computer file named, "Q1 temp Dean rev. wpd." (1 page(s), 4/12/2001)
- ML013550552 - E-mail from P Milano, NRR to S Long, NRR, regarding Answers to Q's. (10 page(s), 4/12/2001)
- ML013550555 - E-mail from P Milano, NRR to D Coe, M Johnson, S Long, NRR regarding IP2- Questions from staff. (1 page(s), 6/19/2001)
- ML013600100 - E-mail from S Long, NRR to M Johnson, NRR regarding 4th try at Q1 Response. (2 page(s), 6/20/2001)
- ML013600105 - E-mail from M Johnson, NRR to C Richard, NRR regarding Fwd: 4th try at Q1 Response. (2 page(s), 6/25/2001)
- ML013600109 - E-mail from S Long, NRR to M Johnson, R Correia, NRR, regarding Fwd: 4th ty at Q1 Response. (2 page(s), 6/25/2001)
- ML013600140 - Indian Point Unit 2 steam generator history. (2 page(s), 12/5/2001)
- ML013600144 - Memo from EJ Sullivan,NRR to SS Bajwa, NRR regarding Request for Additional Information regarding Indian Point Nuclear Station 2 Steam Generator Inspection Interval. (3 page(s), 4/19/1999)
- ML013600162 - Memo from SJ Collins to A Thadani regarding Request for Independent Reviews of 05/26/99, Safety Evaluation re Steam Generator Tube Inspection Intervval and 02/13/95, Safety Evaluation regarding F* Repair Criteria for Indian Point Station Unit 2. (66 page(s), 2/28/2000)
- ML013600168 - Questions and Answers related to issuance of Indian Point 2 Steam Generator Tube Failure Lessons-Learned Report. (10 page(s), 12/5/2001)
- ML013600175 - TS-TRM (tech reqmt manual) under II. (2 page(s), 12/5/2001)
- ML013600183 - Indian Point 2 Steam Generator Tube Failure Lessons-Learned Task Group Report References chart. (12 page(s), 12/5/2001)
- ML013600187 - Draft-Attachment 71111.08, Inservice Inspection Activities. (8 page(s), 12/5/2001)
- ML013600214 - Analysis of Procedure 71111.08, Inservice Inspections. (6 page(s), 12/5/2001)
- ML013600221 - Guidance to Inspectors on Overseen Facilities with Known Steam Generator Tube Leakage. (10 page(s), 12/5/2001)
- ML013600225 - Steam Generator Issues Under the ROP. (1 page(s), 12/5/2001)
- ML013600229 - Indian Point 2 Steam Generator Rupture. (5 page(s), 12/5/2001)
- ML013600231 - Meeting Agenda for Steam Generator Performance Indicator (PI) (1 page(s), 12/5/2001)
- ML013600274 - Treatment of Steam Generator Issues in the ROP Chart. (1 page(s), 12/5/2001)
- ML013600369 - Action Items and Relevant References. (6 page(s), 12/5/2001)
- ML013600372 - Flowchart: Steam Generator Tube Integrity Oversight Process. (1 page(s), 12/5/2001)
- ML013600373 - Memo from JR Strosnider to BA Boger regarding Proposed Steam Generator Tube Integrity Performance Indicator (5 page(s), 2/14/2000)
- ML013600375 - Memo from SJ Collins to FJ Miraglia regarding Lessons-Learned Evaluation from Indian Point Station Unit 2 Failure Event. (3 page(s), 3/20/2000)
- ML013600381 - Memo from SJ Collins to WD Travers, regarding Indian Point Unit 2 Steam Generator Tube Failure Lessons-Learned Task Group and Charter. (6 page(s), 5/24/2000)
- ML013600384 - Draft list of tasks for Task Group, Item 5. (2 page(s), 6/12/2000)
- ML013600388 - Indian Point 2 Steam Generator Tube Failure Lessons-Learned Task Group, Task Group Notes - Discussion with J Muscara, RES on 6/20/2000. (2 page(s), 6/20/2000)
- ML013600442 - IP2 Lessons-Learned Task Group notes - Discussions with T Collins and R Barrett, NRR. (1 page(s), 6/26/2000)
- ML013600448 - Indian Point 2 Steam Generator Tube Failure Lessons-Learned Task Group, Task Group Notes - Discussion with A Keim, NRR on 06/27/01. (3 page(s), 6/27/2000)
- ML013600451 - Indian Point 2 Steam Generator Tube Failure Lessons-Learned Task Group, Task Group Notes - Discussion with J Harold on 06/29/00. (2 page(s), 6/29/2000)
- ML013600455 - Indian Point 2 Steam Generator Tube Failure Lessons-Learned Task Group, Task Group Notes - Discussion with E Murphy on 06/29/00. (5 page(s), 6/29/2000)
- ML013600459 - E-mail from R Ennis, NRR to IP2 Lessons-Learned Task Group regarding discussions with Andrea, Emmett and Jeff. (1 page(s), 6/30/2000)
- ML013600462 - Indian Point 2 Steam Generator Tube Failure Lessons-Learned Task Group,Task Group Notes - Discussion with J Strosnider on 07/05/00. (5 page(s), 7/5/2000)
- ML013600465 - Indian Point 2 Steam Generator Tube Failure Lessons-Learned Task Group,Task Group Notes - Discussion with J Zwolinski on 07/05/01. (2 page(s), 7/5/2000)
- ML013600467 - E-mail from R Ennis, NRR to IP2 Lessons-Learned Task Group regarding discussions with Emmett and Jeff. (11 page(s), 7/6/2000)
- ML013600480 - Slides: IP 2 Steam Generator Tube Failure Lessons Learned Task Force, Approach and Outputs. (8 page(s), 7/13/2000)
- ML013600484 - Indian Point 2 Steam Generator Tube Failure Lessons-Learned Task Group,Task Group Notes - Discussion with B Weisman on 07/17/00. (2 page(s), 7/17/2000)
- ML013600486 - Indian Point 2 Steam Generator Tube Failure Lessons-Learned Task Group, Task Group Notes - Discussion with J Flack and J Ridgely, RES on 07/19/01. (1 page(s), 7/19/2000)
- ML013600496 - IP2 Lessons-Learned Task Group 07/18/00 - Discussion with S Coffin. (4 page(s), 7/19/2000)
- ML013600497 - IP2 Lessons-Learned Task Group 07/19/00, Discussion with G Holahan. (2 page(s), 7/19/2000)
- ML013600499 - Task Group Notes - Discussion with members of Region I Office - 07/20/00. (5 page(s), 7/20/2000)
- ML013600503 - July 20 and 31, 2000 Visit to Region I - Areas and Interviews. (2 page(s), 7/20/2000)
- ML013600506 - Lessons Learned for Utilities and NDE Inspectors. (6 page(s), 12/5/2001)
- ML013600509 - E-mail from M Banerjee, NRR to P Milano, NRR regarding IP2 Requests for Exemption/Extension on SG Since 1995. (1 page(s), 7/21/2000)
- ML013600512 - Task Group Notes - Discusssion with I Barnes on 07/31/00. (2 page(s), 7/31/2000)
- ML013600525 - Task Group Notes - Discussion with members of the Region I Office - 08/01/00. (5 page(s), 8/1/2000)
- ML013600536 - Task Group Notes - Discussion with A Thadan, RES, on 08/02/00. (1 page(s), 8/2/2000)
- ML013600539 - Task Group Notes - Discussion with M Mayfield, RES on 08/09/00 (2 page(s), 8/9/2000)
- ML013600577 - Task Group Notes - Discussion with B Dean on 08/10/00. (2 page(s), 8/10/2001)
- ML013600578 - Task Group Notes - Discussion with R Perch on 08/11/00. (1 page(s), 8/11/2001)
- ML013520013 - Draft 1 of Indian Point 2 Steam Generator Tube Failure Lessons-Learned Report. (100 page(s), 8/17/2000)
- ML013600581 - E-mail from R Ennis, NRR to IP2 Lessons-Learned Task Group regarding Revised TAsk Group Notes. (9 page(s), 8/21/2000)
- ML013600582 - Task Group Notes - Discussion with Con Ed and Westinghouse. (7 page(s), 8/29/2000)
- ML013520019 - Draft 2, Indian Point 2 Steam Generator Tube Failure Lessons-Learned Report. (118 page(s), 9/8/2000)
- ML013600583 - E-mail from S Malur, NRR to W Dean, NRR regarding SG Insnpection Conference Call. (1 page(s), 9/13/2001)
- ML013520021 - Draft 3 of Lessons-Learned Report (TAC MA9163). (133 page(s), 9/22/2000)
- ML013540026 - Draft 4 of Lessons-Learned Report (TAC No. MA9163). (139 page(s), 9/29/2000)
- ML013540068 - Draft 5 of Lessons-Learned Report (TAC No. MA9163). (151 page(s), 10/3/2000)
- ML013600585 - Comments on the IP-2 Lessons Learned Report. (5 page(s), 10/10/2000)
- ML013600576 - Draft 6 of Lessons-Learned Report (TAC No. MA9163). (155 page(s), 10/17/2000)
- ML013610475 - Briefing for NRR Office Director - Indian Point Unit 2 Steam Generator Tube Failure Lessons Learned Task Group. (21 page(s), 10/18/2000)
- ML013610482 - IP-2 SG Tube Failure Lessons Learned Report, 8.2 NRC Oversight Process Inspection Program. (10 page(s), 10/23/2000)
- ML013610493 - 10/26/00 Staff Meeting Summary RE: Revisions to Baseline & Supplementary Procedures for ISI. (1 page(s), 10/26/2000)
- ML013610502 - Slides: Steam Generator Issues (DE). (6 page(s), 11/13/2000)
- ML013610508 - E-mail from J. Strosnider, NRR, to D. Coe, F. Reinhart, F. Gillespie, NRR, Re: Fwd: Draft-IP2 Finding and NOV. (1 page(s), 11/15/2000)
- ML013610518 - Steam Generator Action Plan - Briefing for Commissioners w/attached Task Group Evaluation of OIG Report Findings. (22 page(s), 12/6/2000)
- ML013610522 - Indian Point 2 Event Communication Planning - Briefing for Commissioners Diaz & McGaffigan, December 6-7, 2000. (6 page(s), 12/7/2000)
- ML013610533 - Slides: Steam Generator Tube Integrity-Presentation to Commissioners. (50 page(s), 12/7/2000)
- ML013610538 - Steam Generator Action Plan Status. (7 page(s), 12/8/2000)
- ML013610543 - Draft Meeting Agenda for Steam Generator (SG) Performance Indicator (PI). (3 page(s), 1/9/2001)
- ML013610552 - E-mail J. Strosnider, NRR, to B. Bateman, C. Khan, NRR, Re: 1/17 Draft SG PI Meeting Agenda. (2 page(s), 1/10/2001)
- ML013610554 - E-mail C. Khan, NRR, to D. Hickman, D. Coe , E. Sullivan, NRR, Re: SG Action Plan Items. (1 page(s), 1/16/2001)
- ML013610562 - Slide: Steam Generator (SG) Inspections-DRS/DPR Counterparts Meeting. (7 page(s), 1/16/2001)
- ML013610565 - Meeting Agenda for Steam Generator (SG) Performance Indicator (PI). (2 page(s), 1/23/2001)
- ML013610569 - Slides: Steam Generator Action Plan Resource Estimates for NRR for FY 2001- Briefing for NRR Leadership Team. (6 page(s), 2/13/2001)
- ML013610588 - E-mail W. Dean, NRR, to S. Malur, NRR, Re: ET Briefing -SG Action Plan Status. (2 page(s), 2/16/2001)
- ML013610600 - Draft Discussion Points for Chairman Pre-Brief for IP2 Site Visit w/backgroung Info. (20 page(s), 3/7/2001)
- ML013610617 - Slides: Steam Generator Action Plan - Briefing for the Office of the Inspector General. (10 page(s), 4/4/2001)
- ML013610305 - Memo From J. Strosinder, NRR, to B. Sheron, W. Borchardt, NRR, Re: Steam Generator Action Plan Item 1.11A. (4 page(s), 4/30/2001)
- ML013610307 - Memo From M. Johnson & R. Barrett, NRR, to B. Sheron, NRR, Re: Response to Questions Regarding August 1999 & February 2000 Events, Indian Point, Unit 2 (TAC MB0193). (12 page(s), 10/12/2001)
- ML013610315 - Questions and answers related to issuance of the staff review of OIG Report on the NRC's response to the steam generator tube failure at Indian Point 2 and related issues. (20 page(s), 1/11/2001)
- ML013610319 - Rebuttal to Item Number 1, Review of Tube R2 C67 from 1997 data and the effect of noise. (3 page(s), 7/28/2000)
- ML013610321 - Rebuttal to OIG Report - Emmett L. Murphy, EMCB, NRR. (5 page(s), 12/2/2001)
- ML013610331 - Charts: POD vs Burst Effective Crack Area Study. (10 page(s), 7/12/2000)
- ML013610344 - Table: Westinghouse Depth Profiles vs Dodd's Profiles. (1 page(s), 12/5/2001)
- ML013610349 - Profile of Indian- Point Cracks Based on 1997 Mid-Range Data. (6 page(s), 12/5/2001)
- ML013610355 - Phase settings between 1997 and 2000. (4 page(s), 12/5/2001)
- ML013610464 - Comparison of Tube Scans Before and After Pressure Testing. (3 page(s), 9/4/2000)
- ML013610442 - Settings for the Tube Calibration. (8 page(s), 9/6/2000)
- ML013610469 - Tube R2C69, SG24, High Frequency Probe. (4 page(s), 9/7/2000)
- ML013610476 - E-mail From C. Dodd, NRC Consultant, to E Murphy, S Coffin, NRR, RE: IP5 Report. (10 page(s), 4/20/2000)
- ML013610487 - Charts: Voltage/Max Depth (Crack Depth vs Voltage Study). (8 page(s), 6/28/2000)
- ML013610555 - E-mail From E. Sullivan, NRR, to E Murphy, NRR, Re: Summary from last week-Draft (Inspection Report input from May 24 & 25, 2000 at Waltz Mill.) (2 page(s), 6/1/2000)
- ML013610563 - E-mail Re: Effect of Copper Plating. (5 page(s), 3/18/2000)
- ML013610566 - E-mail From C. Dodd, NRC Consultant, to L. Dudes, RI, Re: Old IP Reports. (7 page(s), 5/1/2000)
- ML013610583 - Scans on Calibration Standards (from C. Dodd, NRC Consultant). (4 page(s), 5/1/2000)
- ML013610586 - Signal to Noise Measurements Made in the Sludge Pile Region (from C. Dodd, NRC Consultant). (2 page(s), 5/9/2000)
- ML013610589 - The Judas Tube Program (from C. Dodd, NRC Consultant). (2 page(s), 5/19/2000)
- ML013610598 - E-mail C. Dodd, NRC Consultant, to S. Coffin, NRR, Re: U-Bend Tubes with Cracks. (9 page(s), 6/1/2000)
- ML013610602 - Review of Plus-Point with Ceramic Wear-Face (from C. Dodd, NRC Consultant). (3 page(s), 6/13/2000)
- ML013610608 - List of the defective tubes U-bend and when they were detected (from C. Dodd, NRC Consultant). (1 page(s), 7/7/2000)
- ML013610611 - E-mail C. Dodd, NRC Consultant, to E. Murphy, NRR, Re: Indian Point Crack Growth. (13 page(s), 7/10/2000)
- ML013610620 - Growth Studies for Indian Point 2 Steam Generator U-bend Defects. (9 page(s), 7/10/2000)
- ML013610670 - Effect of Wall Thinning on Defect Depth Measurement (from C. Dodd, NRC Consultant), (2 page(s), 7/13/2000)
- ML013610671 - Probe and Noise Considerations for Indian Point 2. (2 page(s), 7/17/2001)
- ML013610673 - E-mail C. Dodd, NRC Consultant, to E. Murphy, NRR, Re: Profile of Tube 2-67. (9 page(s), 8/1/2000)
- ML013610674 - PWSCC in U-Bends at Indian Point (from C. Dodd, NRC Consultant). (4 page(s), 8/3/2000)
- ML013610676 - Review of Indian Point (from C. Dodd, NRC Consultant). (6 page(s), 8/10/2000)
- ML013610677 - OD Notches Measured With the Midrange and High-Frequency Probes. (4 page(s), 8/24/2000)
- ML013610679 - E-mail C. Dodd, NRC Consultant, to ANEFF, Prodigy, Re: Tubes with Long Indications. (7 page(s), 4/1/2000)
- ML013610681 - Note B. Sheron, NRR, to S. Collins, NRR, Re: Indian Point 2 Restart Review Status. (2 page(s), 12/5/2001)
- ML013610683 - 10CFR 2.206 Process Outline - Petition Indian Point 2 Restart. (3 page(s), 12/5/2001)
- ML013610685 - Indian Point 2 - 10CFR2.206 Decision Bases. (1 page(s), 12/5/2001)
- ML013610686 - Conditions that must be satisfied to operate steam generators. (8 page(s), 12/5/2001)
- ML013610687 - Indian Point 2 Restart - Sequence of NRC Activities. (2 page(s), 12/5/2001)
- ML013610689 - Slides: Public Meeting with ConEd: NRC Concerns Relating to Steam Generators at Indian Point Unit 2, E, Murphy. (9 page(s), 7/21/1999)
- ML013610690 - Note M. Gamberoni, NRR, to Executive Team, Indian Point 2 Technical Specification and Restart Approval. (1 page(s), 4/13/2000)
- ML013610691 - E-mail J. Strosnider, NRR, to D. Stellfox, Voluntary Industry Initiatives/Indian Point 2. (1 page(s), 5/18/2000)
- ML013620173 - Slides: Indian Point Unit 2 - NRC Public Meeting, June 19, 2000.. (19 page(s), 6/19/2000)
- ML013620179 - Charts: Voltage/Burst Pressure Study. (7 page(s), 6/28/2000)
- ML013620180 - Slides: Issues- Draft SE. (6 page(s), 7/26/2000)
- ML013620194 - Slides: Safety Evaluation Process. (1 page(s), 8/22/2000)
- ML013620201 - Draft Safety Evaluation (August 21, 2000), Version 5, Restart of IP2 Following Steam Generator Tube Failure. (65 page(s), 9/7/2000)
- ML013620206 - Draft Safety Evaluation (August 21, 2000), Version 6, Restart of IP2 Following Steam Generator Tube Failure. (43 page(s), 9/8/2000)
- ML013620210 - Slides: Regulatory Guide Supporting SG Rule. (19 page(s), 12/5/2001)
- ML013620220 - Slides: NRC Staff Perspective on NEI 97-06, NRC/NEI Technical Issues Meeting. (28 page(s), 10/7/1998)
- ML013620226 - Inspection Interval Issue. (2 page(s), 5/8/2001)
- ML013620236 - E-mail E, Murphy, NRR, to JHR, Nuclear Energy Institute, Re: Draft Condition Monitoring/Operational Assessment. (11 page(s), 5/18/2001)
- ML013620115 - Slides: NEI 97-06 Implementation Workshop: "Issues/NRC Review Status re NEI Steam Generator Generic Change Package", E. Murphy. (14 page(s), 6/6/2001)
- ML013620117 - Revise Structural Performance Criteria in TRM, NEI 97-06, and DG-1074. (1 page(s), 12/5/2001)
- ML013620121 - Slides: CRGR Briefing: NEI 97-06, Steam Generator Program Guidelines. (9 page(s), 7/21/1998)
- ML013620125 - Slides: NRC/NEI Technical Issues Meeting: NRC Staff Perspective on NEI 97-06. (28 page(s), 10/7/1998)
- ML013620140 - E-mail J Strosnider, NRR, to E. Sullivan, E. Murphy, NRC, Re: NEI Responses to our Comments on 97-06. (4 page(s), 1/7/1999)
- ML013620141 - NRC/NEI/Industry Technical Meeting, Regulatory Framework Pertaining to SG Tube Integrity, Discussion of Technical Issues. (8 page(s), 2/10/1999)
- ML013620144 - Slides: NRC/NEI Technical Issues Meeting: "Structural Performance Criteria. (6 page(s), 5/6/1999)
- ML013620149 - Slides: ET Brief Status of NEI 97-06 Implementation. (5 page(s), 7/7/1999)
- ML013620150 - E-mail T. Tjader, NRR, to B. Bateman, E. Sullivan, E. Murphy, NRR, Re: Accident Leakage Reviewer's Note. (1 page(s), 7/19/1999)
- ML013620155 - E- mail S. Long, to B. Bateman, E. Sullivan, E Murphy, NRR, Re: Accident Leakage Reviewer Note. (1 page(s), 7/19/1999)
- ML013620176 - E-mail K. Thomas to B. Bateman, E. Sullivan, E. Murphy, NRR, Re: Latest from NEI on S/G TS/TRM. (1 page(s), 7/29/1999)
- ML013620203 - Talking Points for 8/5/99 Conference Call. (1 page(s), 8/5/1999)
- ML013620207 - Structural Performance Criteria Issue. (5 page(s), 8/5/1999)