United States Nuclear Regulatory Commission - Protecting People and the Environment

Materials and Plant Protection (Division 5): Regulatory Guides 5.61 – 5.81

This page lists the number, title, publication date, and revisions for each regulatory guide in Division 5, "Materials and Plant Protection," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Division 5.

See NRC Regulatory Guides for more general information.

Reviewed (last column on table) means that the NRC has reviewed these guides and has determined that they are acceptable for continued use. The NRC encourages suggestions from stakeholders regarding any Regulatory Guide or development of new guides at any time. Suggestions received in this manner will be reviewed upon receipt, but will be fully evaluated during the next periodic review of the affect guides. Currently, Regulatory Guides are reviewed on a 5 year basis. In certain cases, a Regulatory Guide will be looked at before the 5 year period has passed.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Guide
Number
Title Rev. Publish
Date
Reviewed
5.61 Intent and Scope of the Physical Protection Upgrade Rule Requirements for Fixed Sites -- 06/1980 09/2011
5.62 Reporting of Safeguards Events 1 11/1987 05/2012
-- 02/1981  
5.63 Physical Protection for Transient Shipments -- 07/1982 09/2011
5.64 (Not issued) -- --  
5.65 Vital Area Access Controls, Protection of Physical Security Equipment, and Key and Lock Controls -- 09/1986 06/2010
5.66 Access Authorization Program for Nuclear Power Plants 2 10/2011  
1
OUO-SRI
04/2009  
5.67 Material Control and Accounting for Uranium Enrichment Facilities Authorized To Produce Special Nuclear Material of Low Strategic Significance
(Withdrawn -- See 77 FR 60482, 10/3/2012)
W 10/2012  
-- 12/1993  
5.68 Protection Against Malevolent Use of Vehicles at Nuclear Power Plants -- 08/1994  
5.69 Guidance for the Application of Radiological Sabotage Design-Basis Threat in the Design, Development and Implementation of a Physical Security Program that Meets 10 CFR 73.55 Requirements” (SGI) -- 09/2007 03/2014
5.70 (Not Publically Available) -- 09/2007 03/2014
5.71 Cyber Security Programs for Nuclear Facilities -- 01/2010  
5.73 Fatigue Management for Nuclear Power Plant Personnel -- 03/2009  
5.74 Managing the Safety/Security Interface -- 06/2009  
5.75 Training and Qualification of Security Personnel at Nuclear Power Reactor Facilities -- 07/2009  
5.76 Physical Protection Programs at Nuclear Power Reactors (SGI) -- 07/2009  
5.77 Insider Mitigation Program (OUO-SRI) -- 03/2009  
5.78 Physical Protection of Mixed Oxide Fuels in Nuclear Power Plants (SGI)   07/2010  
5.79 Protection of Safeguard Information -- 04/2011  
5.80 Pressure-Sensitive And Tamper-Indicating Device Seals For Material Control And Accounting Of Special Nuclear Material -- 12/2010  
5.81 Target Set Identification and Development for Nuclear Power Reactors (OUO-SRI) -- 11/2010  

To top of page

Page Last Reviewed/Updated Friday, April 04, 2014