United States Nuclear Regulatory Commission - Protecting People and the Environment

Materials and Plant Protection (Division 5): Regulatory Guides 5.61 – 5.81

This page lists the number, title, publication date, and revisions for each regulatory guide in Division 5, "Materials and Plant Protection," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Division 5.

See NRC Regulatory Guides for more general information.

Reviewed dates (the last column in the table) are when the staff completed a periodic review of the associated guide. Regulatory Guides are reviewed about every 5 years, although in some cases a guide will reviewed before the normal 5 year period. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.

The NRC encourages suggestions from stakeholders regarding any Regulatory Guide or development of new guides at any time. Suggestions received in this manner will be reviewed upon receipt, but will typically be fully evaluated during the next periodic review of the affect guides.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Guide
Number
Title Rev. Publish
Date
Reviewed
5.61 Intent and Scope of the Physical Protection Upgrade Rule Requirements for Fixed Sites -- 06/1980 09/2011
5.62 Reporting of Safeguards Events 1 11/1987 05/2012
-- 02/1981  
5.63 Physical Protection for Transient Shipments -- 07/1982 09/2011
5.64 (Not issued) -- --  
5.65 Vital Area Access Controls, Protection of Physical Security Equipment, and Key and Lock Controls -- 09/1986 06/2010
5.66 Access Authorization Program for Nuclear Power Plants 2 10/2011  
1
OUO-SRI
04/2009
OUO-SRI
 
5.67 Material Control and Accounting for Uranium Enrichment Facilities Authorized To Produce Special Nuclear Material of Low Strategic Significance
(Withdrawn -- See 77 FR 60482, 10/3/2012)
W 10/2012  
-- 12/1993  
5.68 Protection Against Malevolent Use of Vehicles at Nuclear Power Plants -- 08/1994 06/2013
5.69 Guidance for the Application of Radiological Sabotage Design-Basis Threat in the Design, Development and Implementation of a Physical Security Program that Meets 10 CFR 73.55 Requirements” (SGI) -- 09/2007
SGI
05/2014
SGI
5.70 Guidance for the Application of the Theft and Diversion Design-Basis Treat in the Design Development, and Implementation of a Physical Security Program that Meets CFR 73.45 and 73.46 (SGI) -- 09/2007
SGI
05/2014
SGI
5.71 Cyber Security Programs for Nuclear Facilities -- 01/2010  
5.73 Fatigue Management for Nuclear Power Plant Personnel -- 03/2009  
5.74 Managing the Safety/Security Interface -- 06/2009 06/2014
5.75 Training and Qualification of Security Personnel at Nuclear Power Reactor Facilities -- 07/2009  
5.76 Physical Protection Programs at Nuclear Power Reactors (SGI) -- 07/2009
SGI
09/2014
SGI
5.77 Insider Mitigation Program (OUO-SRI) -- 03/2009
OUO-SRI
 
5.78 Physical Protection of Mixed Oxide Fuels in Nuclear Power Plants (SGI)   07/2010
SGI
 
5.79 Protection of Safeguards Information -- 04/2011  
5.80 Pressure-Sensitive And Tamper-Indicating Device Seals For Material Control And Accounting Of Special Nuclear Material -- 12/2010  
5.81 Target Set Identification and Development for Nuclear Power Reactors (OUO-SRI) -- 11/2010
OUO-SRI
 

To top of page

Page Last Reviewed/Updated Friday, November 07, 2014