Public Meetings for 2001

This page lists, in chronological order, the notices, slides and summaries documenting the public meetings held concerning RPV Upper Head Issues for 2001. To learn about future meetings, see our public meeting schedule page.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
12/12/2001

Meeting with Rochester Gas & Electric to discuss technical evaluation regarding potential circumferential cracking of the reactor vessel head penetration nozzles.

11/28/2001

Meeting with Davis Besse Nuclear Power Station to discuss NRC Bulletin 2001-01 inspection schedule.

11/20/2001

Meeting with Indiana Michigan Power Company to discuss D. C. Cook Power Station response to NRC Bulletin 2001-01.

11/15/2001

Teleconference with Davis Besse Nuclear Power Station to discuss NRC Bulletin 2001-01 response.

11/14/2001

Meeting with Davis Besse Nuclear Power Station to discuss NRC Bulletin 2001-01 response.

11/13/2001

Meeting with Rochester Gas & Electric to discuss status of RG&E technical evaluation regarding circumferential cracking of the reactor vessel head penetration nozzles.

11/09/2001

Teleconference with Davis Besse Nuclear Power Station to discuss NRC Bulletin 2001-01 response.

11/08/2001

Meeting with NEI, MRP and Pressurized Water Reactor Licensees to discuss Alloy 600 Control Rod Drive Mechanism Nozzle Cracking

11/08/2001

Meeting with Davis Besse Nuclear Power Station to discuss NRC Bulletin 2001-01 response.

10/24/2001

Meeting with Carolina Power & Light Electric Company regarding Robinson's response to the NRC Bulletin 2001-01

10/22/2001

Conference call with Palo Verde Nuclear Power Station to discuss implementation of NRC Bulletin 2001-01

10/12/2001

Conference call with Surry Power Station Units 1 and 2, and North Anna Power Station Units 1 and 2 over response to NRC Bulletin 2001-01

10/11/2001

Conference call with Donald C. Cook Nuclear Plant Units 1 and 2 over response to NRC Bulletin 2001-01

10/11/2001

Conference call with St. Lucie Plant Units 1 and 2 over response to NRC Bulletin 2001-01

10/05/2001

Conference call with Millstone Nuclear Power Station Unit 2 over response to NRC Bulletin 2001-01

10/05/2001

Conference call with R. E. Ginna Nuclear Power Plant over response to NRC Bulletin 2001-01

09/21/2001

Conference call with Virginia Electric and Power Company to discuss implementation of NRC Bulletin 2001-01 at North Anna Power Station Unit 1

09/07/2001

Meeting with Duke Energy Corporation to discuss the Oconee Nuclear Station response to Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles.

08/15/2001

Meeting with the Nuclear Energy Institute and Operating Pressurized Water Reactor Licensee's

07/11/2001

Meeting with the Advisory Committee on Reactor safeguards regarding circumferential cracking of reactor vessel head penetration nozzles.

07/10/2001

Meeting with the Advisory Committee on Reactor Safeguards, Materials & Metallurgy and Plant Operations Subcommittees regarding circumferential cracking of reactor vessel head penetration nozzles.

07/03/2001

Meeting with the Nuclear Energy Institute and the EPRI Material Reliability Program regarding MRP-44 Part 2 Report, CRDM nozzle cracking

06/07/2001

Meeting with the Nuclear Energy Institute and the EPRI Material Reliability Program regarding MRP-44 Part 2 Report, CRDM nozzle cracking.

04/12/2001

Meeting with the Nuclear Energy Institute and the EPRI Material Reliability Program regarding CRDM nozzle cracking

(To top of page)