Home
>
Nuclear Reactors
>
New Reactors
>
Oversight
>
Quality Assurance
>
10 CFR 50 Appendix B Notices of Nonconformance (NON) and Violation (NOV) and 10 CFR Part 21 NOVs
> Part 21 NOV
10 CFR Part 21 NOVs
The following table lists, in chronological order, the Quality Assurance (QA) Inspection for New Reactor Licensing reports and Vendor QA Inspection reports with a Part 21 NOV.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Title |
|---|---|
| 04/22/13 | Dresser Masoneilan facility in Avon, Massachusetts, limited scope inspection to assess Dresser Masoneilan's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically related to quality assurance activities associated with the design, fabrication, assembly, and testing of safety-related valves and valve parts for U.S. nuclear power plants. |
| 03/19/13 | Cives Steel Company (Cives), Southern Division facility, Thomasville, GA, limited scope inspection to assess Cives' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically associated with the fabrication of concrete embedments for AP1000 reactor plants at Vogtle Electric Generating Plant, Units 3 and 4, and Virgil C. Summer Nuclear Station, Units 2 and 3. |
| 11/02/12 | Enertech, Utah State University, Brea, CA, routine limited-scope inspection to assess Enertech's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs. |
| 10/25/12 | Flowserve Corporation, Limitorque Valve Actuator Manufacturing facility in Lynchburg, VA, routine limited-scope inspection to assess Flowserve Corporation's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs. |
| 07/27/12 | National Technical Systems (NTS) facility in Acton, MA, limited-scope routine inspection to assess NTS's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically associated with the seismic qualification testing of the tension bolt and position switch of the AP1000 design squib valves. |
| 05/10/12 | Clark Dynamics, LLC facility (hereafter referred to as Clark), Jefferson Hills, PA, technically-focused, limited scope inspection of Clark's quality assurance (QA) program and 10 CFR Part 21 program, specifically associated with the vibrational aging and seismic qualification of worm gear actuators and electrical penetrations associated with inspections, tests, analyses, and acceptance criteria (ITAAC) 2.2.01.05.ii, 2.2.02.05a.ii, 2.2.05.05a.ii, 2.3.02.05.ii, 2.3.07.05.ii, and 2.7.01.05.ii from Revision 19 of the Westinghouse AP1000 pressurized-water reactor certified design. |
| 03/28/12 | Rosemount Nuclear Instruments, Inc. (RNII), Chanhassen, MN, inspection of selected portions of RNII's quality assurance (QA) program and 10 CFR Part 21 program, specifically associated with RNII's implementation of quality activities associated with the design, procurement, manufacture, and testing of pressure transmitters with an emphasis on the 1154H and 3051N pressure transmitter product lines. |
| 11/03/11 | Obayashi Corporation, Tokyo, Japan, inspection of selected portions of Obayashi Corporation's quality assurance (QA) program and 10 CFR Part 21 program |
| 10/28/11 | Flowserve Pump Division (Flowserve) facility, Vernon, CA, inspection of selected portions of Flowserve's quality assurance (QA) program and 10 CFR Part 21 program |
| 09/13/11 | Emerson Process Management, Fisher Controls International LLC (Fisher Controls), Marshalltown, IA, inspection of selected portions of Fisher Control's quality assurance (QA) program and 10 CFR Part 21 program |
| 09/01/11 | Mitsubishi Heavy Industries, LTD., US-APWR Design Certification Application - Inspection of the implementation of the quality assurance processes and procedures for testing activities performed in support of the US-APWR DC application in accordance with the requirements of Appendix B to 10 CFR Part 50 and 10 CFR Part 21 at the Takasago Research and Development Center in Takasago, Japan. |
| 07/20/11 | CS Innovations, INC, (CSI), Scottsdale, AZ, inspection of selected portions of CSI's quality assurance (QA) program and 10 CFR Part 21 program |
| 04/22/11 | Flowserve Limitorque, Lynchburg, VA, inspection of selected portions of Flowserve Limitorque's quality assurance (QA) program and 10 CFR Part 21 program |
| 04/04/11 | Florida Power and Light Company (FPL), Turkey Point Units 6 and 7 Combined License Application (COLA) - Inspection of the implementation of the quality assurance program to support the Turkey Point Units 6 an 7 COL application in accordance with the requirements of Appendix B to 10 CFR Part 50 and 10 CFR Part 21 at the FPL facilities in Juno Beach, FL. |
| 03/16/11 | Duke Energy Carolinas (Duke), LLC, William States Lee III Nuclear Station (Lee) Units 1 and 2 Combined License Application (COLA) – Inspection of the implementation of the quality assurance program to support the Lee COL application in accordance with the requirements of Appendix B to 10 CFR Part 50 and 10 CFR Part 21 at the Duke facilities in Charlotte, NC. |
| 10/14/10 | Black and Veatch, Overland Park, KS, inspection of selected portions of B&V's quality assurance (QA) program and 10 CFR Part 21 program |
| 10/06/10 |
Tyco Electronics, Fairview, NC, inspection of selected portions of Tyco's quality assurance (QA) program and 10 CFR Part 21 program
|
| 08/30/10 | Bechtel Power Corporation, Frederick, MD, inspection of selected portions of Bechtel's quality assurance (QA) program and 10 CFR Part 21 program |
| 07/16/10 | Westinghouse Electric Company - Purdue University in West Lafayette, IN - Inspection of the WEC oversight and dedication of the testing conducted at Purdue University related to the design on the AP1000 shield building in accordance with the requirements of 10 CFR Part 21 and Appendix B to 10 CFR Part 50. |
| 07/15/10 | Sandvik Materials Technology, Sandviken, Sweden, inspection of selected portions of SMT's quality assurance (QA) program and 10 CFR Part 21 program |
| 07/08/10 | International Quality Consultants, Inc., Butler, PA, inspection of selected portions of IQC's quality assurance (QA) program and 10 CFR Part 21 program |
| 05/03/10 |
Sulzer Pumps (US) Inc., Chattanooga, TN, inspection of selected portions of Sulzer's quality assurance (QA) program and 10 CFR Part 21 program
|
| 04/22/10 |
Shaw Nuclear Services, Charlotte, NC, inspection of selected portions of Shaw's quality assurance (QA) program and 10 CFR Part 21 program
|
| 02/22/10 | DuBose National Energy Services, Inc., Clinton, NC, inspection of Dubose's 10 CFR Part 21 program |
| 12/04/09 | Curtiss Wright Flow Control Company, Electro-Mechanical Division (Curtiss Wright-EMD), Cheswick, PA, inspection of selected portions of Curtiss Wright-EMD's quality assurance (QA) program and 10 CFR Part 21 program |
| 10/29/09 | C & D Technologies, Inc., Blue Bell, PA, inspection of selected portions of C & D's quality assurance (QA) program and 10 CFR Part 21 program |
| 09/24/09 |
Prime Technology LLC, North Branford, CT, inspection of selected portions of Prime Technology's quality assurance (QA) program and 10 CFR Part 21 program
|
| 08/28/09 | Creusot Forge, Le Creusot, France, inspection of selected portions of Creusot Forge's quality assurance (QA) program, and 10 CFR Part 21 program |
| 08/24/09 |
Japan Steel Works (JSW), LTD, Muroran, Japan, inspection of selected portions of JSW's quality assurance (QA) program, and 10 CFR Part 21 program
|
| 08/18/09 |
Flowserve, Flow Control Division, Raleigh, NC, inspection of selected portions of Flowserve's quality assurance (QA) program, and 10 CFR Part 21 program
|
| 07/08/09 | Steam Generating Team (SGT), LLC, Charlotte, NC, inspection of selected portions of SGT's quality assurance (QA) program, and 10 CFR Part 21 program |
| 05/27/09 |
Conval, Inc., Somers, CT, follow-up inspection of selected portions of Conval's quality assurance (QA) program, and 10 CFR Part 21 program
|
| 04/27/09 |
Dresser Industries Incorporated, Alexandria, LA, inspection of selected portions of Dresser's quality assurance (QA) program, and 10 CFR Part 21 program
|
| 03/31/09 |
CoreStar International Corporation, Irwin, PA, inspection of selected portions of CoreStar's quality assurance (QA) program, and 10 CFR Part 21 program
|
| 03/25/09 |
General Electric Hitachi ESBWR Design Certification Application - Inspection of the implementation of the quality assurance and Part 21 programs governing the application for the ESBWR Design Certification the GE Hitachi facility in Wilmington, NC.
|
| 03/13/09 |
GE Hitachi (GEH) Nuclear Energy, Wilmington, NC, inspection of selected portions of GEH's quality assurance (QA) program, and 10 CFR Part 21 program
|
| 12/17/08 | Weir Valves & Controls (WVC) USA, Incorporated, Ipswich, MA, inspection of selected portions of WVC's quality assurance (QA) program, and 10 CFR Part 21 program |
| 11/18/08 | Energy Steel & Supply Company (ESSC), Lapeer, MI, inspection of selected portions of ESSC's quality assurance (QA) program, and 10 CFR Part 21 program |
| 10/15/08 |
Babcock and Wilcox (B&W) Nuclear Operations Group Mount Vernon Facility, Mount Vernon, IN, inspection of selected portions of B&W's quality assurance (QA) program, and 10 CFR Part 21 program
|
| 10/09/08 |
Fairbanks Morse Engine, Beloit, WI, inspection of selected portions of Fairbanks Morse's quality assurance (QA) program, and 10 CFR Part 21 program
|
| 07/18/08 | Doosan Heavy Industries, Changwon, Korea, inspection of selected portions of Doosan's quality assurance (QA) program, and 10 CFR Part 21 program |
| 07/11/08 | Invensys Process Systems (IPS), Irvine, CA, inspection of selected portions of IPS's quality assurance (QA) program, and 10 CFR Part 21 program |
| 06/02/08 | PCI Energy Services, LLC, Lake Bluff, IL, inspection of selected portions of PCI's quality assurance (QA) program, and 10 CFR Part 21 program |
| 05/27/08 |
Namco Controls, Inc., Lancaster, SC, inspection of selected portions of Namco's quality assurance (QA) program, and 10 CFR Part 21 program
|
| 05/08/08 |
Tioga Pipe Supply Company, Inc., Philadelphia, PA, inspection of selected portions of Tioga's quality assurance (QA) program, and 10 CFR Part 21 program
|
| 05/07/08 | Areva NP GmbH, Erlangen, Germany, inspection of selected portions of Areva NP GmbH's quality assurance (QA) program, and 10 CFR Part 21 program |
| 05/02/08 |
RTP Corporation, Pompano Beach, FL, inspection of RTP's 10 CFR Part 21 program
|
| 03/19/08 | Bellefonte Combined License Application - Inspection of the implementation of the quality assurance program governing the simulated open channel hydraulics model at the TVA facility in Chattanooga, TN. |
| 12/18/07 | Flowserve, Pump Division, Vernon, CA, inspection of Flowserve's 10 CFR Part 21 program |
| 12/18/07 | Velan Inc., Montreal, Canada, inspection of selected portions of Velan's quality assurance (QA) program, and 10 CFR Part 21 program |
| 10/16/07 | Conval Inc., Somers, CT, inspection of selected portions of Conval's quality assurance (QA) program, and 10 CFR Part 21 program |
| 10/09/07 | Babcock & Wilcox Canada, Cambridge Ontario, Canada, inspection of selected portions of Babcock & Wilcox Canada's quality assurance (QA) program, and 10 CFR Part 21 program |
| 01/09/07 |
Engine Systems, Inc. (ESI), Rocky Mount, NC, inspection of selected portions of ESI's quality assurance (QA) program, and 10 CFR Part 21 program.
|
| 10/05/06 | PRIME Measurement Products, City of Industry, CA, inspection of selected portions of PRIME's quality assurance (QA) program, and 10 CFR Part 21 program |
| 05/25/06 | Crane Nuclear, Incorporated, Kennesaw, GA, inspection of selected portions of Crane Nuclear's quality assurance (QA) program, and Crane Nuclear’s 10 CFR Part 21 program. |
| 06/02/05 | AREVA Framatome ANP, Incorporated, Electrical Products Group (ELP), Cranberry Township, PA, ELP quality assurance and commercial grade dedication inspection |
Page Last Reviewed/Updated Monday, May 06, 2013

