10 CFR Part 21 NOVs

The following table lists, in chronological order, the Quality Assurance (QA) Inspection for New Reactor Licensing reports and Vendor QA Inspection reports with a Part 21 NOV.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/03/23 Thermo Fisher Scientific, Oakwood Village, OH, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, as they pertain to activities conducted at their facility related to the manufacturing of replacement parts and calibration and repair services for NRC’s regulated facilities.
09/07/23 ANSYS, Canonsburg, PA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, as they pertain to activities conducted at their facility related to the design and development of software for NRC’s regulated facilities.
06/09/23 Mistras Services, Trainer, PA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, as they pertain to activities conducted at their facility related to nondestructive examinations of safety-related structures, systems, and components at nuclear power plants.
12/15/21 Engine Systems, Inc. (ESI), Rocky Mount, NC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to ESI’s design, fabrication, corrective actions, commercial grade dedication and qualification of safety related components for NRC’s regulated facilities.
06/05/17

Velan Inc., Montreal, Canada, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs as they pertain to activities conducted at their facility related to the design, fabrication, assembly, and testing of valves and replacement parts for NRC's regulated facilities.

03/30/17

Chicago Bridge & Iron (CB&I), Laurens, SC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, as they pertain to CB&I Laurens' implementation of quality activities associated with the fabrication and testing of safety-related piping for the Westinghouse Electric Company AP1000 reactor design.

12/14/16

AZZ Nuclear | NLI, Fort Worth, TX, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically, as it pertains to AZZ Nuclear/NLI's design, qualification, and commercial-grade-dedication activities related to basic components supplied to U.S. NRC regulated facilities.

01/15/16

Nova, Nuclear Division, Middleburg Heights, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain to safety-related components supplied to nuclear power plants.

08/14/15

Crane Nuclear, Inc., Bolingbrook, IL, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically as they pertain to safety-related components supplied to operating nuclear power plants.

07/16/15

Thermo Fisher Scientific, San Diego, CA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain associated with safety-related components supplied to operating nuclear power plants.

03/23/15

General Cable, Willimantic, CT, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain to activities conducted at your facility related to the design, fabrication, assembly, and testing activities of components for NRC regulated facilities.

12/04/14

Westinghouse Electric Company, Fuel Handling Equipment and Crane Manufacturing (FHE&CM), Shoreview and Hutchinson, MN, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs

04/11/14

United Controls International, Norcross, Georgia, limited scope inspection to assess United Controls International's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as it pertains to the implementation of safety-related activities for U.S. regulated facilities.

03/31/14

Pentair Valves and Controls, Mansfield, MA, follow-up inspection to observe the re-testing of the pressurizer safety valve (PV-62), for the Westinghouse Electric Company (WEC) AP1000 reactor design

10/02/13

Ametek Solidstate Controls, Inc., Columbus, Ohio, limited scope inspection to assess Ametek Solidstate Controls, Inc.'s compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain to activities conducted at their facility related to the design, fabrication, assembly, and testing of components for NRC regulated facilities.

10/02/13

Chicago Bridge & Iron (CB&I) (formerly known as B.F. Shaw), Laurens, South Carolina., limited scope inspection to assess CB&I's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically related to the fabrication of piping for the US AP1000 plants.

07/16/13

Babcock & Wilcox Canada Ltd. (BWC), Cambridge, Ontario Canada, limited scope inspection to assess BWC's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain to the design, fabrication, assembly, and testing activities of the Once Through Replacement Steam Generators for the Davis Besse Nuclear Power Station.

06/24/13

Westinghouse Electric Company (WEC), Ogden, Utah, limited scope inspection to assess WEC's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain to safety-related activities for US regulated facilities.

05/07/13

Meggitt Safety Systems, Simi Valley, CA, limited scope inspection to assess Meggitt's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically as they pertain to the design, procurement, manufacture, and test of a sample of Class 1E cables and post-accident hydrogen and oxygen containment atmosphere monitoring systems.

04/22/13

Dresser Masoneilan facility in Avon, Massachusetts, limited scope inspection to assess Dresser Masoneilan's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically related to quality assurance activities associated with the design, fabrication, assembly, and testing of safety-related valves and valve parts for U.S. nuclear power plants.

03/19/13

Cives Steel Company (Cives), Southern Division facility, Thomasville, GA, limited scope inspection to assess Cives' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically associated with the fabrication of concrete embedments for AP1000 reactor plants at Vogtle Electric Generating Plant, Units 3 and 4, and Virgil C. Summer Nuclear Station, Units 2 and 3.

11/02/12

Enertech, Utah State University, Brea, CA, routine limited-scope inspection to assess Enertech's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs.

10/25/12

Flowserve Corporation, Limitorque Valve Actuator Manufacturing facility in Lynchburg, VA, routine limited-scope inspection to assess Flowserve Corporation's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs.

07/27/12

National Technical Systems (NTS) facility in Acton, MA, limited-scope routine inspection to assess NTS's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically associated with the seismic qualification testing of the tension bolt and position switch of the AP1000 design squib valves.

05/10/12

Clark Dynamics, LLC facility (hereafter referred to as Clark), Jefferson Hills, PA, technically-focused, limited scope inspection of Clark's quality assurance (QA) program and 10 CFR Part 21 program, specifically associated with the vibrational aging and seismic qualification of worm gear actuators and electrical penetrations associated with inspections, tests, analyses, and acceptance criteria (ITAAC) 2.2.01.05.ii, 2.2.02.05a.ii, 2.2.05.05a.ii, 2.3.02.05.ii, 2.3.07.05.ii, and 2.7.01.05.ii from Revision 19 of the Westinghouse AP1000 pressurized-water reactor certified design.

03/28/12

Rosemount Nuclear Instruments, Inc. (RNII), Chanhassen, MN, inspection of selected portions of RNII's quality assurance (QA) program and 10 CFR Part 21 program, specifically associated with RNII's implementation of quality activities associated with the design, procurement, manufacture, and testing of pressure transmitters with an emphasis on the 1154H and 3051N pressure transmitter product lines.

11/03/11

Obayashi Corporation, Tokyo, Japan, inspection of selected portions of Obayashi Corporation's quality assurance (QA) program and 10 CFR Part 21 program

10/28/11

Flowserve Pump Division (Flowserve) facility, Vernon, CA, inspection of selected portions of Flowserve's quality assurance (QA) program and 10 CFR Part 21 program

09/13/11

Emerson Process Management, Fisher Controls International LLC (Fisher Controls), Marshalltown, IA, inspection of selected portions of Fisher Control's quality assurance (QA) program and 10 CFR Part 21 program

09/01/11

Mitsubishi Heavy Industries, LTD., US-APWR Design Certification Application - Inspection of the implementation of the quality assurance processes and procedures for testing activities performed in support of the US-APWR DC application in accordance with the requirements of Appendix B to 10 CFR Part 50 and 10 CFR Part 21 at the Takasago Research and Development Center in Takasago, Japan.

07/20/11

CS Innovations, INC, (CSI), Scottsdale, AZ, inspection of selected portions of CSI's quality assurance (QA) program and 10 CFR Part 21 program

04/22/11

Flowserve Limitorque, Lynchburg, VA, inspection of selected portions of Flowserve Limitorque's quality assurance (QA) program and 10 CFR Part 21 program

04/04/11

Florida Power and Light Company (FPL), Turkey Point Units 6 and 7 Combined License Application (COLA) - Inspection of the implementation of the quality assurance program to support the Turkey Point Units 6 an 7 COL application in accordance with the requirements of Appendix B to 10 CFR Part 50 and 10 CFR Part 21 at the FPL facilities in Juno Beach, FL.

03/16/11

Duke Energy Carolinas (Duke), LLC, William States Lee III Nuclear Station (Lee) Units 1 and 2 Combined License Application (COLA) – Inspection of the implementation of the quality assurance program to support the Lee COL application in accordance with the requirements of Appendix B to 10 CFR Part 50 and 10 CFR Part 21 at the Duke facilities in Charlotte, NC.

10/14/10

Black and Veatch, Overland Park, KS, inspection of selected portions of B&V's quality assurance (QA) program and 10 CFR Part 21 program

10/06/10

Tyco Electronics, Fairview, NC, inspection of selected portions of Tyco's quality assurance (QA) program and 10 CFR Part 21 program

08/30/10

Bechtel Power Corporation, Frederick, MD, inspection of selected portions of Bechtel's quality assurance (QA) program and 10 CFR Part 21 program

07/16/10

Westinghouse Electric Company - Purdue University in West Lafayette, IN - Inspection of the WEC oversight and dedication of the testing conducted at Purdue University related to the design on the AP1000 shield building in accordance with the requirements of 10 CFR Part 21 and Appendix B to 10 CFR Part 50.

07/15/10

Sandvik Materials Technology, Sandviken, Sweden, inspection of selected portions of SMT's quality assurance (QA) program and 10 CFR Part 21 program

07/08/10

International Quality Consultants, Inc., Butler, PA, inspection of selected portions of IQC's quality assurance (QA) program and 10 CFR Part 21 program

05/03/10

Sulzer Pumps (US) Inc., Chattanooga, TN, inspection of selected portions of Sulzer's quality assurance (QA) program and 10 CFR Part 21 program

04/22/10

Shaw Nuclear Services, Charlotte, NC, inspection of selected portions of Shaw's quality assurance (QA) program and 10 CFR Part 21 program

02/22/10

DuBose National Energy Services, Inc., Clinton, NC, inspection of Dubose's 10 CFR Part 21 program

12/04/09

Curtiss Wright Flow Control Company, Electro-Mechanical Division (Curtiss Wright-EMD), Cheswick, PA, inspection of selected portions of Curtiss Wright-EMD's quality assurance (QA) program and 10 CFR Part 21 program

10/29/09

C & D Technologies, Inc., Blue Bell, PA, inspection of selected portions of C & D's quality assurance (QA) program and 10 CFR Part 21 program

09/24/09

Prime Technology LLC, North Branford, CT, inspection of selected portions of Prime Technology's quality assurance (QA) program and 10 CFR Part 21 program

08/28/09

Creusot Forge, Le Creusot, France, inspection of selected portions of Creusot Forge's quality assurance (QA) program, and 10 CFR Part 21 program

08/24/09

Japan Steel Works (JSW), LTD, Muroran, Japan, inspection of selected portions of JSW's quality assurance (QA) program, and 10 CFR Part 21 program

08/18/09

Flowserve, Flow Control Division, Raleigh, NC, inspection of selected portions of Flowserve's quality assurance (QA) program, and 10 CFR Part 21 program

07/08/09

Steam Generating Team (SGT), LLC, Charlotte, NC, inspection of selected portions of SGT's quality assurance (QA) program, and 10 CFR Part 21 program

05/27/09

Conval, Inc., Somers, CT, follow-up inspection of selected portions of Conval's quality assurance (QA) program, and 10 CFR Part 21 program

04/27/09

Dresser Industries Incorporated, Alexandria, LA, inspection of selected portions of Dresser's quality assurance (QA) program, and 10 CFR Part 21 program

03/31/09

CoreStar International Corporation, Irwin, PA, inspection of selected portions of CoreStar's quality assurance (QA) program, and 10 CFR Part 21 program

03/25/09

General Electric Hitachi ESBWR Design Certification Application - Inspection of the implementation of the quality assurance and Part 21 programs governing the application for the ESBWR Design Certification the GE Hitachi facility in Wilmington, NC.

03/13/09

GE Hitachi (GEH) Nuclear Energy, Wilmington, NC, inspection of selected portions of GEH's quality assurance (QA) program, and 10 CFR Part 21 program

12/17/08

Weir Valves & Controls (WVC) USA, Incorporated, Ipswich, MA, inspection of selected portions of WVC's quality assurance (QA) program, and 10 CFR Part 21 program

11/18/08

Energy Steel & Supply Company (ESSC), Lapeer, MI, inspection of selected portions of ESSC's quality assurance (QA) program, and 10 CFR Part 21 program

10/15/08

Babcock and Wilcox (B&W) Nuclear Operations Group Mount Vernon Facility, Mount Vernon, IN, inspection of selected portions of B&W's quality assurance (QA) program, and 10 CFR Part 21 program

10/09/08

Fairbanks Morse Engine, Beloit, WI, inspection of selected portions of Fairbanks Morse's quality assurance (QA) program, and 10 CFR Part 21 program

07/18/08

Doosan Heavy Industries, Changwon, Korea, inspection of selected portions of Doosan's quality assurance (QA) program, and 10 CFR Part 21 program

  • Vendor Response Letters 1 | 2
  • NRC Closeout Letters 1 | 2
07/11/08

Invensys Process Systems (IPS), Irvine, CA, inspection of selected portions of IPS's quality assurance (QA) program, and 10 CFR Part 21 program

06/02/08

PCI Energy Services, LLC, Lake Bluff, IL, inspection of selected portions of PCI's quality assurance (QA) program, and 10 CFR Part 21 program

05/27/08

Namco Controls, Inc., Lancaster, SC, inspection of selected portions of Namco's quality assurance (QA) program, and 10 CFR Part 21 program

05/08/08

Tioga Pipe Supply Company, Inc., Philadelphia, PA, inspection of selected portions of Tioga's quality assurance (QA) program, and 10 CFR Part 21 program

05/07/08

Areva NP GmbH, Erlangen, Germany, inspection of selected portions of Areva NP GmbH's quality assurance (QA) program, and 10 CFR Part 21 program

05/02/08

RTP Corporation, Pompano Beach, FL, inspection of RTP's 10 CFR Part 21 program

03/19/08

Bellefonte Combined License Application - Inspection of the implementation of the quality assurance program governing the simulated open channel hydraulics model at the TVA facility in Chattanooga, TN.

  • Applicant Responses 1 | 2
12/18/07

Flowserve, Pump Division, Vernon, CA, inspection of Flowserve's 10 CFR Part 21 program

12/18/07

Velan Inc., Montreal, Canada, inspection of selected portions of Velan's quality assurance (QA) program, and 10 CFR Part 21 program

10/16/07

Conval Inc., Somers, CT, inspection of selected portions of Conval's quality assurance (QA) program, and 10 CFR Part 21 program

10/09/07

Babcock & Wilcox Canada, Cambridge Ontario, Canada, inspection of selected portions of Babcock & Wilcox Canada's quality assurance (QA) program, and 10 CFR Part 21 program

01/09/07

Engine Systems, Inc. (ESI), Rocky Mount, NC, inspection of selected portions of ESI's quality assurance (QA) program, and 10 CFR Part 21 program.

10/05/06

PRIME Measurement Products, City of Industry, CA, inspection of selected portions of PRIME's quality assurance (QA) program, and 10 CFR Part 21 program

05/25/06

Crane Nuclear, Incorporated, Kennesaw, GA, inspection of selected portions of Crane Nuclear's quality assurance (QA) program, and Crane Nuclear's 10 CFR Part 21 program.

06/02/05

AREVA Framatome ANP, Incorporated, Electrical Products Group (ELP), Cranberry Township, PA, ELP quality assurance and commercial grade dedication inspection