- ML102600016 - FOIA/PA-2010-0334 - Salem Unit 1 degraded buried piping in the auxiliary feedwater system during refueling outage, Spring 2010, all records. (2 page(s), 9/16/2010)
- ML102871184 - FOIA/PA-2010-0334 - Resp 1 - Partial. (3 page(s), 10/5/2010)
- ML101540242 - Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application for Buried Piping Inspection Program (TAC Nos. ME1834 and ME1836). (4 page(s), 8/6/2010)
- ML102560064 - Salem, Unit 1 and 2, Response to NRC Request for Additional Information, dated August 6, 2010 Related to the Buried Piping Inspection Program Associated with License Renewal Application. (24 page(s), 9/7/2010)
- ML101100101 - Task Interface Agreement - Evaluation of Application of Technical Specification Surveillance Requirement 3.0.3, "Surveillance Requirement Applicability," at Clinton Power Station (TIA 2010-001). (6 page(s), 4/19/2010)
- ML080300554 - Task Interface Agreement (TIA) - Request for Evaluation of Intended Application of Technical Specification (TS) Limiting Condition for Operation (LCO) 3.0.5 for Surveillance Testing of Reactor Protection System (RPS) Channels at Arkansas Nuclear One. (9 page(s), 1/30/2008)
- ML102871196 - Email from Ed Miller, NRR to Rick Ennis, NRR and Carleen Sanders, NRR on Summary of AFW Piping Call. (2 page(s), 4/16/2010)
- ML102871197 - Email from James Medoff, NRR to David Pelton, NRR and William Holston, NRR FW: OpE Item on Salem 1 AFW Buried Piping. (3 page(s), 4/19/2010)
- ML102871198 - Email from Robert Hardies, NRR to David Alley, NRR RE: Salem AFW Summary. (4 page(s), 5/6/2010)
- ML102871199 - Email from Prakash Patnaik, NRR to Rick Ennis, NRR on Salem Unit 2 AFW Buried Piping Pressure Test. (2 page(s), 5/7/2010)
- ML102980553 - FOIA/PA-2010-0334 - Resp 2 - Partial. (11 page(s), 10/8/2010)
- ML102950548 - LER 00-002-00 for Palisades Regarding Non-Conformance with Technical Specification Requirements for Auxiliary Feedwater Pump P-88. (3 page(s), 3/23/2000)
- ML102950572 - Task Interface Agreement - Evaluation of Application of Technical Specification 4.0.3, "Surveillance Requirement Applicability," at Pilgrim. (5 page(s), 1/23/2009)
- ML102950576 - Task Interface Agreement Evaluation of Application of Technical Specification 4.0.3, "Surveillance Requirement Applicability," at Pilgrim. (5 page(s), 1/23/2009)
- ML102950581 - BNE Presentation, "Buried Pipe Program" by Jim Melchionna. (18 page(s), 10/21/2009)
- ML102950586 - NRC Presentation, "Buried Piping" by Bob Hardies. (14 page(s), 2/24/2010)
- ML102950587 - Email from OHara, Timothy to Conte, Richard, "FW: Salem U1 Inspection Plan." (3 page(s), 3/12/2010)
- ML102950589 - Drawing, "Projection Elevation Unit 1 Aux Feed Buried Pipe." (1 page(s), 4/4/2010)
- ML102950591 - Email from Lew, David to Burritt, Arthur, et al, "FW: Quick notes on the Salem 1 AFW piping situation reported by Michael Modes." (1 page(s), 4/6/2010)
- ML102950594 - Photographs of Excavation. (9 page(s), 4/7/2010)
- ML102950596 - Email from Modes, Michael to OHara, Timothy, et al, "RE: Update On Salem AFW Condition." (1 page(s), 4/7/2010)
- ML102950599 - Email from Burritt, Arthur to Lew, David, "RE: Quick notes on the Salem 1AFW piping situation reported by Michael Modes." (1 page(s), 4/7/2010)
- ML102950600 - Email from Modes, Michael to OHara, Timothy, et al, "RE: Update On Salem AFW Condition (Buried Piping)." (4 page(s), 4/8/2010)
- ML102950603 - Email from OHara, Timothy to Ennis, Rick, "FW: Update On Salem AFW Condition." (1 page(s), 4/8/2010)
- ML102950605 - Email from OHara, Timothy to Ennis, Rick, "FW: Update On Salem AFW Condition." (3 page(s), 4/8/2010)
- ML102950607 - Email from Roberts, Darrell to Casto, Chuck, "Salem Unit 1 AFW Buried Pipe Degradation." (1 page(s), 4/8/2010)
- ML102950610 - Email from Modes, Michael to OHara, Timothy, et al, "RE: Salem U1 AFW Photos - 4/7/10." (1 page(s), 4/8/2010)
- ML102950613 - Email from Burritt, Arthur to Lew, David; Clifford, James, "RE: Salem U1 AFW Photos - 4/7/10." (1 page(s), 4/8/2010)
- ML102950615 - Email from Burritt, Arthur to Cline, Leonard, "Salem AFW Issue." (1 page(s), 4/8/2010)
- ML102950617 - Email from OHara, Timothy to Modes, Michael, et al, "Salem, Unit 1 AFW Photos - 4/7/10." (9 page(s), 4/8/2010)
- ML102950618 - Email from OHara, Timothy to Modes, Michael; Conte, Richard, "FW: AFW Piping Update." (2 page(s), 4/9/2010)
- ML102950619 - Email from Cline, Leonard to Trocine, Leigh, "Salem AFW Buring Piping Configuration and Elevation." (3 page(s), 4/13/2010)
- ML102950620 - Email from OHara, Timothy to Modes, Michael; Conte, Richard, "RE: AFW Piping Update." (3 page(s), 4/10/2010)
- ML102950621 - Email from Thorp, John to King, Mark, "FW: Update On Salem AFW Condition (Buried Piping)." (4 page(s), 4/10/2010)
- ML102950623 - Email from OHara, Timothy to Kaufman, Paul, "FW: Questions on AFW Piping Repair." (2 page(s), 4/10/2010)
- ML102980208 - Email from OHara, Timothy to Kaufman, Paul, "FW: Salem U1 AFW Photos - 4/7/10." (9 page(s), 4/10/2010)
- ML102980222 - Email from Balian, Harry to Schroeder, Daniel, et al, "Buried AFW Pipe Schedule." (1 page(s), 4/11/2010)
- ML102980230 - Email from OHara, Timothy to Conte, Richard, et al, "AF Issues At Salem 1 & 2." (1 page(s), 4/11/2010)
- ML102980232 - Email from Ennis, Rick to Pelton, David, et al, "RE: Update On Salem AFW Condition (Buried Piping)." (5 page(s), 4/11/2010)
- ML102980234 - Email from OHara, Timothy to Berrick, Howard, et al, "Additional Questions on AFW Piping." (2 page(s), 4/12/2010)
- ML102980239 - Email from Burritt, Arthur to Balian, Harry, et al, "Branch 3 Status 4/12/10." (1 page(s), 4/12/2010)
- ML102980240 - Email from OHara, Timothy to Conte, Richard, et al, "FW: Salem, Unit 1 AFW piping update & ISI Update." (1 page(s), 4/13/2010)
- ML102980247 - Email from Burritt, Arthur to Cline, Leonard, "RE: Branch 3 Status - 4/13/10." (1 page(s), 4/13/2010)
- ML102980251 - Email from Burritt, Arthur to Cline, Leonard, "RE: Branch 3 Status - 4/12/10." (1 page(s), 4/13/2010)
- ML102980256 - Email from Trocine, Leigh to Cline, Leonard, et al, "Thanks -- "RE: Salem AFW Buried Piping Configuration and Elevation." (4 page(s), 4/13/2010)
- ML102980284 - Email from Conte, Richard to Cline, Leonard, et al, " RE: Branch 3 Status - 4/13/10." (1 page(s), 4/13/2010)
- ML102980287 - Email from Cline, Leonard to Lew, David, et al, "Salem Unit 1 AFW Piping Update." (1 page(s), 4/13/2010)
- ML102980288 - Email from OHara, Timothy to Conte, Richard, et al, "FW: Salem, Unit 1, AFW Piping Update & ISI Update." (5 page(s), 4/13/2010)
- ML102980291 - Email from OHara, Timothy to Conte, Richard; Kaufman, Paul, "FW: Draft Problem Summary on SL 1 AFW." (6 page(s), 4/14/2010)
- ML102980294 - Email from Conte, Richard to OHara, Timothy, et al, "Draft Problem Summary on SL 1 AFW." (6 page(s), 4/14/2010)
- ML102980296 - Email from OHara, Timothy to Cline, Leonard, "RE: Update - Salem - AFW Buried Piping Issues" (2 page(s), 4/15/2010)
- ML102980299 - Email from Schroeder, Daniel to Conte, Richard, et al, "RE: Draft Problem Summary on SL 1 AFW." (6 page(s), 4/15/2010)
- ML102980303 - Email from OHara, Timothy to Cline, Leonard, et al, "RE: Update - Salem - AFW Buried Piping Issues." (2 page(s), 4/15/2010)
- ML102980308 - Email from Schroeder, Daniel to Conte, Richard, et al, "RE: Draft Problem Summary on SL 1 AFW." (6 page(s), 4/15/2010)
- ML102980312 - Email from Cline, Leonard to Lew, David, et al, "Salem Unit 1 AFW Piping Update." (1 page(s), 4/15/2010)
- ML102980314 - Email from Burritt, Arthur to Balian, Harry, "RE: Branch 3 Status - 4/12/10." (1 page(s), 4/16/2010)
- ML102980319 - Email from Schroeder, Daniel to Burritt, Arthur, et al, "AFW Design Pressure Tech Eval Review." (1 page(s), 4/17/2010)
- ML102980321 - Email from OHara, Timothy to Conte, Richard, et al, "Salem Unit 2 AFW." (5 page(s), 4/18/2010)
- ML102980324 - Email from Conte, Richard to OHara, Timothy, et al, "RE: Response to: FW: Some Thoughts on Salem 1 Before I Forget." (3 page(s), 4/18/2010)
- ML102980328 - Email from Silk, David to Schroeder, Daniel, "Salem Ul AFW." (1 page(s), 4/19/2010)
- ML102980330 - Email from Burritt, Arthur to Neely, Christine, "FW: Commissioner Ostendorff's Agenda." (2 page(s), 4/19/2010)
- ML102980334 - Handwritten Notes of Richard Conte. (2 page(s), 4/19/2010)
- ML102980353 - Email from OHara, Timothy to Schoppy, Joseph, "RE: Salem Unit 2 AFW - Memory Test From 1994!" (2 page(s), 4/21/2010)
- ML102980367 - Email from OHara, Timothy to Patel, Amar, "FW: Salem Unit 2 AFW - Memory Test From 1994!" (2 page(s), 4/21/2010)
- ML102980370 - Graphs of Salem - Unit 2 FFDP Exam. (4 page(s), 4/21/2010)
- ML102980373 - Email from Conte, Richard to OHara, Timothy, et al, "RE: Salem Unit 2 AFW - Memory Test From 1994!" (2 page(s), 4/21/2010)
- ML102980375 - Email from Roberts, Darrell to White, John, et al, "FW: Salem 2 LCO and Update on Salem 1 Degraded AFW Buried Piping." (2 page(s), 4/21/2010)
- ML102980259 - Email from Burritt, Arthur to Wilson, Peter, et al, No Subject. (1 page(s), 4/21/2010)
- ML102980260 - Email from Burritt, Arthur to Wilson, Peter, et al, No Subject. (1 page(s), 4/21/2010)
- ML102980261 - Notification 000020459689, Submitted by Edley Giles. (2 page(s), 4/21/2010)
- ML102980262 - Email from Clifford, James to Lew, David, "RE: Notes from Fricker Call." (1 page(s), 4/21/2010)
- ML102980263 - Email from OHara, Timothy to Gray, Harold; Conte, Richard, "FW: Risk Assessment of Missed Surveillance -Salem AFW Discharge Line Underground Piping." (4 page(s), 4/22/2010)
- ML102980264 - Email from OHara, Timothy to Gray, Harold, et al, "Unit 2 - Work Scope - 4/22/10." (1 page(s), 4/22/2010)
- ML102980265 - Email from OHara, Timothy to Sanders, Carleen, "FW: Scan from Salem/Hope Creek HP5035." (1 page(s), 4/22/2010)
- ML102980266 - Email from Schroeder, Daniel to Burritt, Arthur, et al, "RE: AFW ASME Test for Salem Unit 2." (1 page(s), 4/22/2010)
- ML102980267 - Email from Burritt, Arthur to Schmidt, Wayne, et al, "FW: Risk Assessment of Missed Surveillance -Salem AFW Discharge Line Underground Piping." (1 page(s), 4/22/2010)
- ML102980268 - Email from Burritt, Arthur to Balian, Harry, et al, "FW: Salem 2 LCO." (1 page(s), 4/22/2010)
- ML102980269 - Email from Burritt, Arthur to Gray, Harold; Conte, Richard, "FW: Risk Assessment of Missed Surveillance -Salem AFW Discharge Line Underground Piping." (1 page(s), 4/22/2010)
- ML102980270 - Email from Burritt, Arthur to Lew, David, et al, "RE: AFW ASME Test for Salem Unit 2." (2 page(s), 4/22/2010)
- ML102980271 - Email from Cline, Leonard to Lew, David, et al, "Salem AFW status." (2 page(s), 4/22/2010)
- ML102980376 - Email from Lew, David to Burritt, Arthur; Clifford, James, "FW: AFW ASME Test for Salem Unit 2". (2 page(s), 4/22/2010)
- ML102980377 - Email from O'Hara, Timothy to Gray, Harold, et al, "Unit 2 - Work Scope - 4/22/10." (1 page(s), 4/22/2010)
- ML102980378 - Email from Conte, Richard to Schmidt, Wayne, et al, "FW: Risk Assessment of Missed Surveillance -Salem AFW Discharge Line Underground Piping." (1 page(s), 4/22/2010)
- ML102980379 - Email from Conte, Richard to Burritt, Arthur, et al, " RE: Salem 2 LCO." (2 page(s), 4/22/2010)
- ML102980380 - Email from Burritt, Arthur to Clifford, James, et al, "RE: AFW ASME Test for Salem Unit 2." (2 page(s), 4/22/2010)
- ML102980381 - Email from Burritt, Arthur to Balian, Harry, et al, "FW: Salem 2 LCO." (1 page(s), 4/22/2010)
- ML102980382 - Email from Burritt, Arthur to Lew, David, et al, "RE: AFW ASME Test for Salem Unit 2." (2 page(s), 4/22/2010)
- ML102980383 - Email from Lew, David to Burritt, Arthur; Clifford, James, "FW: AFW ASME Test for Salem Unit 2." (2 page(s), 4/22/2010)
- ML102980384 - Email from Lew, David to Collins, Sam, et al, " Update: Salem 1 AFW Finite Element Analyses." (1 page(s), 4/22/2010)
- ML102980385 - Email from Cline, Leonard to Hansell, Samuel, et al, "Salem Unit 1 AFW." (6 page(s), 4/22/2010)
- ML102980456 - Email from Turilin, Andrey to Burritt, Arthur, et al, "Risk Assessment of Missed Surveillance - Auxiliary Feedwater Discharge Line Underground Piping." (4 page(s), 4/22/2010)
- ML102980457 - Email from Balian, Harry to Burritt, Arthur, et al, "FW: 1 R20 Message Outage Duration Extended." (2 page(s), 4/22/2010)
- ML102980458 - Email from O'Hara, Timothy to Berrick, Howard, et al, "Question on Unit 1 Past operability FEA." (1 page(s), 4/23/2010)
- ML102980459 - Email from OHara, Timothy to Conte, Richard, "FW: Scan from Salem/Hope Creek HP5035." (1 page(s), 4/22/2010)
- ML102980460 - Email from OHara, Timothy to Tsao, John, et al, "RE: Scan from Salem/Hope Creek HP5035." (2 page(s), 4/23/2010)
- ML102980461 - Email from Roberts, Darrell to Conte, Richard, et al, "RE: Buried Piping - Proposed NRC Action." (5 page(s), 4/23/2010)
- ML102980462 - Revision 3 - 4/29/10 of Summary of Telecon Internal to NRC Staff 4/28/10. (13 page(s), 4/29/2010)
- ML102980463 - Email from Conte, Richard to Burritt, Arthur, et al, "RE: Salem AFW Priorities/Next Steps." (2 page(s), 4/23/2010)
- ML102980464 - Email from OHara, Timothy to Burritt, Arthur, et al, "RE: Salem AFW Priorities/Next Steps." (1 page(s), 4/23/2010)
- ML102980465 - RM Documentation No. SA-SURV-2010-001, Rev. 1, "Risk Assessment of Missed Surveillance - Auxiliary Feedwater Discharge Line Underground Piping Pressure Testing." (4 page(s), 4/23/2010)
- ML102980522 - Email from Burritt, Arthur to Balian, Harry, et al, "Branch 3 Status - 4/23/10." (1 page(s), 4/23/2010)
- ML102980523 - Email from Roberts, Darrell to Lew, David, "RE: Biweekly Director's Counterpart Call (Including Actions for BCs)." (2 page(s), 4/23/2010)
- ML102980524 - Email from OHara, Timothy to Berrick, Howard, et al, "Question on Unit 1 Past Operability FEA." (13 page(s), 4/23/2010)
- ML102980525 - Email from Schroeder, Daniel to Conte, Richard; OHara, Timothy, "FW: afw piping risk." (5 page(s), 4/26/2010)
- ML102980526 - Revision 3 - 4/29/10 of Summary of Telecon Internal to NRC Staff 4/28/10 with Handwritten Notes. (16 page(s), 4/29/2010)
- ML102980527 - Email from Cline, Leonard to Burritt, Arthur; Schroeder, Daniel, "FYI: Salem AFW." (1 page(s), 4/26/2010)
- ML102980528 - Email from OHara, Timothy to Conte, Richard, "FW: Comments on Salem Unit #2 (DRAFT) Operability Determination - 10-005." (1 page(s), 4/26/2010)
- ML102980529 - Email from OHara, Timothy to Conte, Richard, "FW: Scan from Salem/Hope Creek HP5035." (3 page(s), 4/27/2010)
- ML102980530 - Email from OHara, Timothy to Conte, Richard, et al, "Salem Unit 1 Notification 20459689." (3 page(s), 4/27/2010)
- ML102980531 - Summary of Telecon Internal to NRC Staff 4/28/10. (6 page(s), 4/28/2010)
- ML102980644 - Ennis Summary of April 28, 2010. (2 page(s), 4/28/2010)
- ML102980645 - Email from Manoly, Kamai to Tsao, John, Summary of 4/27/10 Internal NRC Call on Salem Unit 2 AFW Piping. (9 page(s), 4/28/2010)
- ML102980646 - Email from Burritt, Arthur to Schroeder, Daniel, "RE: Underground Unit 1 AFW Piping." (1 page(s), 4/27/2010)
- ML102980647 - Email from Burritt, Arthur to Ennis, Rick, "Accepted: Salem Unit 2 AFW Piping." (1 page(s), 4/27/2010)
- ML102980648 - Email from Schroeder, Daniel to Burritt, Arthur, et al, "Call with PSEG Engineering at 9 AM." (1 page(s), 4/27/2010)
- ML102980649 - Email from Burritt, Arthur to Schroeder, Daniel, "RE: Underground Unit 1 AFW Piping." (1 page(s), 4/27/2010)
- ML102980650 - Email from OHara, Timothy to Modes, Michael, et al, "Comments on 70108698 0110 Unit 1 AFW Past Operability Evaluation - Engineering." (1 page(s), 4/27/2010)
- ML102980651 - Email from OHara, Timothy to Berrick, Howard; Schroeder, Daniel, "Documents Requested." (1 page(s), 4/27/2010)
- ML102980652 - Email from Burritt, Arthur to Clifford, James, "RE: Salem AFW Piping Testing." (2 page(s), 4/28/2010)
- ML102980653 - Email OHara, Timothy to Tsao, John, "FW: Comments on 70108698 0110 Unit 1 AFW Past Operability Evaluation - Engineering." (2 page(s), 4/28/2010)
- ML102990170 - Email from Gray, Harold to Conte, Richard, et al, "Salem AFW Questions - Conf Call 4/28/10 PM." (1 page(s), 4/28/2010)
- ML102990173 - Email from Lew, David to Conte, Richard, et al, "RE: Summary of 4/27/10 Internal NRC Call on Salem Unit 2 AFW Piping." (2 page(s), 4/28/2010)
- ML102990175 - Email from OHara, Timothy to Modes, Michael; Gray, Harold, "FW: Summary of 4/27/10 Internal NRC Call on Salem Unit 2 AFW Piping." (2 page(s), 4/28/2010)
- ML102990177 - Email from Raymond, William to Ennis, Rick, et al, "RE: Summary of 4/27/10 Internal NRC Call on Salem Unit 2 AFW Piping." (3 page(s), 4/28/2010)
- ML102990179 - Email from Bowman, Eric to Ennis, Rick, et al, "RE: Summary of 4/27/10 Internal NRC Call on Salem Unit 2 AFW Piping." (4 page(s), 4/28/2010)
- ML102990190 - Email from Bowman, Eric to Ennis, Rick, "RE: Summary of 4/27/10 Internal NRC Call on Salem Unit 2 AFW Piping." (6 page(s), 4/28/2010)
- ML102990206 - Email from Manoly, Kamal to Tsao, John, et al, "RE: Summary of 4/27/10 Internal NRC Call on Salem Unit 2 AFW Piping." (4 page(s), 4/28/2010)
- ML102990207 - Email from Bowman, Eric to Ennis, Rick, et al, "RE: Summary of 4/27/10 Internal NRC Call on Salem Unit 2 AFW Piping." (5 page(s), 4/28/2010)
- ML102990208 - Email from Roberts, Darrell to Modes, Michael, et al, "RE: Salem AFW Piping." (1 page(s), 4/28/2010)
- ML102990209 - Email from Gray, Harold to Conte, Richard, et al, "Salem AFW Questions - Conf Call 4/28/10 PM." (3 page(s), 4/28/2010)
- ML102980519 - Email from OHara, Timothy to Modes, Michael, "RE: Tech Spec Surveillance Applicability." (1 page(s), 4/28/2010)
- ML102980521 - Email from OHara, Timothy to Berrick, Howard; Schroeder, Daniel, "RE: Unit 1 AFW Past Operability, and Unit 2 AFW Extent of Condition." (2 page(s), 4/29/2010)
- ML102980534 - Email from Cline, Leonard to Cahill, Christopher; Burritt, Arthur, "MC 0309 for Salem AFW." (9 page(s), 4/29/2010)
- ML102980589 - Email from Burritt, Arthur to Ennis, Rick, "FW: Salem AFW Questions - Conf Call 4/28/2010 PM." (4 page(s), 4/29/2010)
- ML102980592 - Email from Lew, David to Burritt, Arthur, "Summary of 4/27/10 Internal NRC Call on Salem Unit 2 AFW Piping." (3 page(s), 4/29/2010)
- ML102980595 - Email from Lew, David to OHara, Timothy, et al, "RE: Summary of 4/27/10 Internal NRC Call on Salem Unit 2 AFW Piping." (3 page(s), 4/29/2010)
- ML102980607 - Email from Cline, Leonard to Heater, Keith; Burritt, Arthur, "Salem Unit 1 AFW." (9 page(s), 4/30/2010)
- ML102980611 - Email from Conte, Richard to Burritt, Arthur, et al, "Summary of Call April 28 - Potential PSEG Conf. Call Items." (1 page(s), 1/1/2001)
- ML102980615 - Email from O'Hara, Timothy to Cahill, Christopher, "RE: AFW Missile Barrier." (2 page(s), 4/30/2010)
- ML102980620 - Email from O'Hara, Timothy to Conte, Richard, "RE: AFW Missile Barrier." (2 page(s), 4/30/2010)
- ML102980622 - Email from Cahill, Christopher to Burritt, Arthur; Cline, Leonard, "FW: AFW Missile Barrier." (6 page(s), 4/30/2010)
- ML102980626 - Email from O'Hara, Timothy to Amer, Frank et al, "RE: AFW Missile Barrier." (2 page(s), 4/30/2010)
- ML102980629 - Email from Cahill, Christopher to O'Hara, Timothy, et al, "RE: AFW Missile Barrier." (1 page(s), 4/30/2010)
- ML102980630 - Email from Burritt, Arthur to Lew, David, "RE: Summary of 4/27/10 Internal NRC Call on Salem Unit 2 AFW Piping." (3 page(s), 5/5/2010)
- ML102980632 - Email from Tsao, John to Alley, David, "FW: Summary of 4/27/10 Internal NRC Call on Salem Unit 2 AFW Piping." (3 page(s), 5/3/2010)
- ML102980635 - Email from O'Hara, Timothy to Conte, Richard, "Salem ISI Debrief - 5/5/10." (1 page(s), 5/4/2010)
- ML102980637 - Email from Burritt, Arthur to Clifford, James, "RE: Revised Debrief Notes." (11 page(s), 5/5/2010)
- ML102980640 - Email from Gray, Harold to Conte, Richard, "RE: Revised Debrief Notes." (4 page(s), 5/4/2010)
- ML102980643 - Email from Conte, Richard to O'Hara, Timothy, et al, "RE: Salem Violation Consensus." (3 page(s), 5/7/2010)
- ML102980655 - Email from Modes, Michael to Conte, Richard, et al, "RE: Salem Violation Consensus." (11 page(s), 5/7/2010)
- ML102980338 - Email from Modes, Michael to Ennis, Rick, "RE: Salem Violation Consensus." (5 page(s), 5/7/2010)
- ML102980339 - Email from Schulten, Carl to Ennis, Rick, "RE: Salem Violation Consensus." (4 page(s), 5/7/2010)
- ML102980340 - Email from O'Hara, Timothy to Modes, Michael, et al, "RE: Salem Violation Consensus." (2 page(s), 5/6/2010)
- ML102980341 - Email from Ennis, Rick to Conte, Richard, et al, "RE: Review of PSEG Amd Request - RE: Salem Violation Consensus." (4 page(s), 5/7/2010)
- ML102980342 - Email from Conte, Richard to Ennis, Rick et al, "Review of PSEG Amd Request - RE: Salem Violation Consensus." (3 page(s), 5/7/2010)
- ML102980343 - Email from Conte, Richard to Burritt, Arthur, et al, "Salem Unit 2/1 AFW Pipe Degradation." (5 page(s), 5/7/2010)
- ML102980344 - Email from Modes, Michael to Conte, Richard, "Salem Unit 2/1 AFW Pipe Degradation." (2 page(s), 5/7/2010)
- ML102980345 - Email from DeFrancisco, Anne to Modes, Michael, et al, "RE: Salem Violation Consensus." (4 page(s), 5/7/2010)
- ML102980346 - Email from Conte, Richard to Powell, Gerry, et al, "Not Sure Who is Acting - Need Half Hour with Darrell." (11 page(s), 5/7/2010)
- ML102980347 - Email from Tsao, John to Modes, Michael, et al, "RE: Salem Violation Consensus." (10 page(s), 5/7/2010)
- ML102980348 - Email from O'Hara, Timothy to Tsao, John, "RE: Salem AFW Piping." (1 page(s), 5/10/2010)
- ML102980349 - Email from Ennis, Rick to Schroeder, Daniel, et al, "FW: Salem Unit 2/1 AFW Pipe Degradation." (8 page(s), 5/10/2010)
- ML102980350 - Email from Burritt, Arthur to Conte, Richard, "Accepted: Salem Unit 2 AFW Piping Degradation - Regulatory Issues." (1 page(s), 5/10/2010)
- ML102980351 - Email from O'Hara, Timothy to Berrick, Howard, "Guided Wave Data." (1 page(s), 5/12/2010)
- ML102980352 - Email from O'Hara, Timothy to Manoly, Kamal, "RE: Salem Unit 2/1 AFW Pipe Degradation." (2 page(s), 5/13/2010)
- ML102980354 - Email from O'Hara, Timothy to Burritt, Arthur, et al, "RE: Salem ISI Open Items." (1 page(s), 5/17/2010)
- ML102980355 - Email from O'Hara, Timothy to Conte, Richard, et al, "FW: OP EVAL 10-005 Salem U2 Buried AFW Pipe.doc." (2 page(s), 5/18/2010)
- ML102980356 - Email from O'Hara, Timothy to Conte, Richard, et al, "RE: OP EVAL 10-005 Salem U2 Buried AFW Pipe.doc." (1 page(s), 5/18/2010)
- ML102980357 - Email from Schroeder, Daniel to O'Hara, Timothy; Burritt, Arthur, "FW: OP EVAL 10-005 Salem U2 Buried AFW Pipe.doc." (19 page(s), 5/18/2010)
- ML102980358 - Email from O'Hara, Timothy to Conte, Richard, et al, "FW: OP EVAL 10-005 Salem U2 Buried AFW Pipe.doc. (20 page(s), 5/18/2010)
- ML102980359 - Email from Schroeder, Daniel to O'Hara, Timothy; Burritt, Arthur, "FW: Unit 2 pressure test report. (1 page(s), 5/18/2010)
- ML102980360 - Email from OHara, Timothy to Conte, Richard, et al, "FW: OP EVAL 10-005 Salem U2 Buried AFW Pipe.doc. (20 page(s), 5/18/2010)
- ML102980361 - Email from Burritt, Arthur to Conte, Richard, "FW: OP EVAL 10-005 Salem U2 Buried AFW Pipe.doc". (2 page(s), 5/18/2010)
- ML102980362 - Email from OHara, Timothy to Tsao, John, et al, "Discuss Salem and IWA-4160".Email from O'Hara, Timothy to Tsao, John, et al, "Discuss Salem and IWA-4160". (3 page(s), 5/24/2010)
- ML102980363 - Email from Berrick, Howard to OHara, Timothy, "RE: Requests & Question. (1 page(s), 5/24/2010)
- ML102980364 - Email from Burritt, Howard to Brown, Michael, "Morning call issues affecting Branch 3. (5 page(s), 4/27/2010)
- ML102980386 - Email from O'Hara, Timothy to Tsao, John, "RE: Follow Up on Salem Question From the Materials Call. (4 page(s), 5/25/2010)
- ML102980387 - Email from Roberts, Darrell to Gray, Harold, et al, "RE: Salem Drop-in Meeting - return Messages. (1 page(s), 5/26/2010)
- ML102980388 - Email from O'Hara, Timothy to Gray, Harold, "RE: Salem Drop-in Meeting - return Messages". (2 page(s), 5/26/2010)
- ML102980389 - Email from O'Hara, Timothy to Wertz, Trent, et al, "Notes For Jack Grobe's Region 2 Presentation". (2 page(s), 6/11/2010)
- ML102980390 - Email from O'Hara, Timothy to Conte, Richard, et al, "Salem Unit 1 Info". (1 page(s), 6/16/2010)
- ML102980392 - Email from O'Hara, Timothy to Powell, Gerry, et al, "RE: Salem ISI Feeder - Attached". (2 page(s), 7/1/2010)
- ML102980393 - Email from O'Hara, Timothy to Conte, Richard, "Explanatory Comments to Salem Licensee Identified NCV". (1 page(s), 7/1/2010)
- ML102980394 - Email from r1scan@nrc.gov to Conte, Richard, "Attached Image". (37 page(s), 7/6/2010)
- ML102980395 - Email from O'Hara, Timothy to Conte, Richard, "RE: Attached Image". (1 page(s), 7/6/2010)
- ML102980396 - Email from O'Hara, Timothy to Conte, Richard, et al, "Revised Salem ISI Feeder. (27 page(s), 7/7/2010)
- ML102980399 - Email from O'Hara, Timothy to Conte, Richard; Miskey, Cheryl, "Revised Salem ISI Feeder. (26 page(s), 7/8/2010)
- ML102980400 - Email from Tsao to O'Hara re: Scan from Salem/Hope Creek HP5035. (3 page(s), 4/23/2010)
- ML102980401 - Memorandum from Timothy O'Hara to Arthur Burritt, "Inservice Inspection activities inspection feeder for Salem Unit 1, Inspection report 05000272/2010003. (25 page(s), 7/15/2010)
- ML102980469 - Email from O'Hara, Timothy to Tsao, John; Lupold, Timothy, "RE: Guided wave inspection and finite element analysis. (1 page(s), 4/14/2010)
- ML102980470 - Memorandum from Timothy O'Hara to Arthur Burritt, "Inservice Inspection activities inspection feeder for Salem Unit 1, Inspection report 05000272/2010003, Revision of July 21, 2010". (29 page(s), 7/22/2010)
- ML102980471 - Email from Burritt, Arthur to Cline, Leonard, "FW: Inspection Schedule Change. (2 page(s), 7/22/2010)
- ML102980472 - Email from Cline, Leonard to OHara, Timothy, et al, "Salem AFW finding.Email from Cline, Leonard to O'Hara, Timothy, et al, "Salem AFW finding. (29 page(s), 7/28/2010)
- ML102980476 - Email from O'Hara, Timothy to Conte, Richard, "Salem Unit 1 Feeder". (1 page(s), 7/28/2010)
- ML102980477 - Letter from Arthur Burritt to Thomas Joyce, "Salem Nuclear Generating Station, Unit Nos. 1 and 2 - NRC Integrated Inspection Report 05000272-10-003 and 05000311-10-003. (77 page(s), 8/10/2010)
- ML102980478 - Email from O'Hara, Timothy to Schroeder, Daniel, et al, "FW: Salem Unit 1 PI&R Status - 9/22/10". (2 page(s), 9/22/2010)
- ML102980479 - Email from Tsao, John to O'Hara, Timothy, "Scan from Salem/Hope Creek HP5035. (5 page(s), 4/22/2010)
- ML102980487 - Teleconference Summary, "Maximum Pressure in Underground Auxiliary Feedwater Piping". (5 page(s), 10/8/2010)
- ML102980489 - Operability Evaluation with Tracked Changes. (18 page(s), 4/22/2010)
- ML102980490 - Draft NRC Information Notice of Leaking Buried Piping Issues. (7 page(s), 10/8/2010)
- ML102980491 - Email from Kaufman, Paul to O'Hara, Timothy, "RE: AF Piping update". (6 page(s), 4/11/2010)
- ML102950421 - FOIA/PA-2010-0334 - Resp 3 - Partial. (11 page(s), 10/19/2010)
- ML102950392 - E-Mail from OHara to Balian, Buried AFW Piping. (2 page(s), 4/7/2010)
- ML102950393 - E-Mail from Roberts to Conte, Update on Salem AFW Condition. (1 page(s), 4/7/2010)
- ML102950394 - Branch 3 Daily Status. (4 page(s), 4/7/2010)
- ML102950395 - E-Mail from Schroeder to Burritt, Salem Outage Issues. (1 page(s), 4/7/2010)
- ML102950412 - E-Mail from Balian to Sheehan, Inspectors in Action. (4 page(s), 4/7/2010)
- ML102950413 - E-Mail from O'Hara to Balian, Buried Pipe Pictures. (1 page(s), 4/7/2010)
- ML102950414 - E-Mail from Balian to Schroeder, Monday Night. (1 page(s), 4/6/2010)
- ML102950415 - E-Mail from OHara to Modes, Wednesday Night. (2 page(s), 4/8/2010)
- ML102950416 - E-Mail from Balian to Schroeder, Thursday Night. (1 page(s), 4/8/2010)
- ML102950417 - E-Mail from Darrell to OHara, Salem AFW Update - Correction (2 pages) Salem AFW Update - Correction. (2 page(s), 4/9/2010)
- ML102950446 - E-Mail from Cline to Lew, Telephone call with Carl Fricker. (1 page(s), 4/9/2010)
- ML102950447 - E-Mail from Burritt to Lew, Salem AFW Update - Correction. (2 page(s), 4/9/2010)
- ML102950448 - E-Mail from OHara to Ennis, Salem AFW Update - Correction. (2 page(s), 4/9/2010)
- ML102950465 - E-Mail from Burritt to Lew, Salem AFW Update - Correction. (2 page(s), 4/9/2010)
- ML102950466 - E-Mail from Conte to OHara, OpE Inputs for Today. (2 page(s), 4/9/2010)
- ML102950467 - Branch 3 Daily Status. (4 page(s), 4/9/2010)
- ML102950476 - E-Mail from Thomas to Rosebrook et al., IOEB Clearinghouse Screening Summary for Friday, April 9, 2010. (5 page(s), 4/9/2010)
- ML102950477 - E-Mail from Haskell to Brown et al., Region 1 Morning Call Notes for Friday, April 9, 2010. (2 page(s), 4/9/2010)
- ML102950478 - E-mail from OHara to Berrick, Questions on AF Piping Repair. (2 page(s), 4/10/2010)
- ML102950493 - E-Mail from OHraa to Conte, IOEB Clearinghouse Screening Summary For Friday, April 9, 2010. (5 page(s), 4/9/2010)
- ML102950494 - E-Mail from Ennis to Pelton, Update on Salem AFW Condition. (5 page(s), 7/11/2010)
- ML102950491 - E-Mail from OHara to Conte, AF Issues at Salem 1 and 2. (1 page(s), 4/11/2010)
- ML102950492 - E-Mail from Balian to OHara, Update on Unit 1 AFW Excavation. (14 page(s), 4/11/2010)
- ML102950498 - E-mail from Brown to Conte, More Buried Pipe Stuff. (38 page(s), 4/12/2010)
- ML102950532 - E-Mail from OHara to Berrick, Additional Questions on AFW Piping. (5 page(s), 4/12/2010)
- ML102950533 - E-Mail from Brown to Conte, Buried Piping Info. (1 page(s), 4/12/2010)
- ML102950534 - E-Mail from Schroeder to Brown, Update - Salem - AFW Buried Piping Issues. (1 page(s), 4/12/2010)
- ML102950535 - E-Mail from Burritt to Brown, Update - Salem - AFW buried Piping Issues. (1 page(s), 4/12/2010)
- ML102950541 - Branch 3 Daily Status. (4 page(s), 4/12/2010)
- ML102950542 - E-Mail from Burritt to Balian, Branch 3 Status - 4/12/10. (5 page(s), 4/12/2010)
- ML102950543 - IOEB Clearinghouse Screening Summary for 4/12/10. (3 page(s), 4/12/2010)
- ML102950584 - E-Mail from Burritt to Conte, SL 1 AFW Conf Call at 200pm. (3 page(s), 4/12/2010)
- ML102950550 - E-Mail from Sabisch to Conte, AFW Buried Piping Issues at Oconee? (3 page(s), 4/13/2010)
- ML102950551 - E-Mail from Holston to Pelton, SL 1 AFW Conf Call 200pm. (6 page(s), 4/12/2010)
- ML102950552 - E-Mail from Burritt to Conte, SL 1 AFW Conf Call at 200pm. (2 page(s), 4/12/2010)
- ML102950559 - E-Mail from OHara to Hardies, SL 1 AFW Conf Call at 200pm. (3 page(s), 4/13/2010)
- ML102950560 - Branch 3 Daily Status. (4 page(s), 4/13/2010)
- ML102950561 - Branch 3 Daily Status. (5 page(s), 4/13/2010)
- ML102950396 - E-Mail from Burritt to Lew, Inspector Visit. (2 page(s), 4/13/2010)
- ML102950397 - E-Mail from Cline to Cline, Branch 3 Status - 4/14/10. (8 page(s), 4/14/2010)
- ML102950398 - Branch 3 Daily Status. (5 page(s), 4/15/2010)
- ML102950399 - E-mail from King to Rosebrook et. al., IOEB Clearinghouse Screening Summary for Thursday, April 15, 2010. (7 page(s), 4/15/2010)
- ML102950400 - E-mail from Brown to Cline, Update - Salem - AFW Buried Piping Issues. (3 page(s), 4/15/2010)
- ML102950401 - E-mail from Kaufman to Conte, Unit 1 Containment Liner Photos. (2 page(s), 4/15/2010)
- ML102950402 - E-mail from O'Hara to Gray, B3 Status 4-16-10. (6 page(s), 4/16/2010)
- ML102950403 - E-mail from Cline to Brown, Update - Salem - AFW Buried Piping Issues. (2 page(s), 4/16/2010)
- ML102950404 - E-Mail from Conte to Ashley, et.al. Degraded AFW Piping - Conference Details. (9 page(s), 4/16/2010)
- ML102950405 - Branch 3 Daily Status. (5 page(s), 4/16/2010)
- ML102950406 - E-Mail from King to Rosebrook et al., IOEB Clearinghouse Screening Summary for Friday, April 16, 2010. (6 page(s), 4/16/2010)
- ML102950450 - E-Mail from O'Hara to Conte, Response to: Some Thoughts on Salem 1 Before I Forget. (3 page(s), 4/17/2010)
- ML102950451 - E-Mail from Conte to Schmidt, Salem AFW. (1 page(s), 4/19/2010)
- ML102950452 - Branch 3 Status. (5 page(s), 4/19/2010)
- ML102950453 - E-Mail from Schroeder to Burritt, ACE Aux MRC Comments Incorporated. (2 page(s), 9/16/2010)
- ML102950454 - E-Mail from King to Rosebrook et al., IOEB Clearinghouse Screening Summary for Monday, April 19, 2010. (5 page(s), 4/19/2010)
- ML102950455 - E-Mail from Bernardo to Burritt, Region 1 OpE Takeaways. (2 page(s), 4/19/2010)
- ML102950456 - E-Mail from Burritt to Bernardo, Region 1 OpE Takeaways. (2 page(s), 4/19/2010)
- ML102950457 - Branch 3 Daily Status. (5 page(s), 4/20/2010)
- ML102950458 - Branch 3 Daily Status. (5 page(s), 4/21/2010)
- ML102950459 - E-Mail from O'Hara to Schoppy, Salem Unit 2 AFW - Memory Test From 1994. (1 page(s), 4/21/2010)
- ML102950562 - E-Mail from Rich to Balian, Salem Issues. (1 page(s), 4/21/2010)
- ML102950563 - Branch 3 Daily Status. (5 page(s), 4/22/2010)
- ML102950564 - E-Mail from O'Hara to Tsao, FEA of Degraded Salem Unit 1 AFW Piping. (1 page(s), 4/23/2010)
- ML102950565 - E-Mail from Balian to Schroeder, AFW Piping. (1 page(s), 4/23/2010)
- ML102950566 - Branch 3 Daily Status. (5 page(s), 4/23/2010)
- ML102950567 - E-Mail from Lew to Roberts, Biweekly Director's Counterpart Call. (2 page(s), 4/23/2010)
- ML102950568 - E-Mail from Burritt to Balian, Branch 3 Status - 4/23/10. (6 page(s), 4/23/2010)
- ML102950569 - E-Mail from Lew to Dentel et al., Midcycle Assessment Guidance. (2 page(s), 4/25/2010)
- ML102950570 - E-Mail from Tsao to O'Hara, Salem buried pipe flaw analysis RAI 4-23-10. (4 page(s), 4/26/2010)
- ML102950571 - E-Mail from Cline to Ennis, Salem Unit 2 Containment Liner Corrosion Discoveryrev2. Doc. (3 page(s), 4/26/2010)
- ML102980104 - E-Mail from Burritt to Balian, et al., B-3 Status 4-26-10. (6 page(s), 4/26/2010)
- ML102980105 - E-Mail from OHara to Ennis et al., Salem Update. (3 page(s), 4/26/2010)
- ML102980106 - E-Mail from Ennis to Conte, et al., Salem Update. (3 page(s), 4/26/2010)
- ML102980107 - E-Mail from King to Rosebrook et al., IOEB Clearinghouse Screening Summary for Monday, April 26, 2010. (5 page(s), 4/26/2010)
- ML102980108 - Branch 3 Daily Status. (5 page(s), 4/26/2010)
- ML102950158 - E-Mail from OHara to Cahill et al., OP Eval 10-005 Salem U2 Buried AFW Pipe. (2 page(s), 4/27/2010)
- ML102950168 - E-Mail from King to Rosebrook et al., IOEB Clearinghouse Screening Summary for Tuesday, April 27, 2010. (9 page(s), 4/27/2010)
- ML102950176 - E-Mail from Ennis to Conte, Salem AFW Piping Testing. (5 page(s), 4/27/2010)
- ML102950182 - Branch 3 Daily Status. (5 page(s), 4/27/2010)
- ML102950184 - E-Mail from OHara to Tsao, Draft OP Eval 10-005 Salem U2 Buried AFW Pipe.E-Mail from O'Hara to Tsao, Draft OP Eval 10-005 Salem U2 Buried AFW Pipe. (4 page(s), 4/23/2010)
- ML102950188 - E-Mail from Roberts to Lew et al., Biweekly Director's Counterpart Call. (2 page(s), 4/23/2010)
- ML102950200 - E-Mail from Schroeder to Burritt, Unit 1 AFW past operability and Unit 2 AFW extent of condition. (6 page(s), 4/28/2010)
- ML102950205 - E-Mail from Gray to Conte, Salem AFW questions - conf call 4/28/10. (3 page(s), 4/28/2010)
- ML102950209 - E-Mail from Conte to Ashley et al., Conference Call to Go Over Statue of Salem Unit 1 and 2 AFW Issues. (3 page(s), 4/28/2010)
- ML102950214 - Branch 3 Daily Status. (5 page(s), 4/28/2010)
- ML102950227 - E-Mail from Burritt to Ennis, Salem Unit 2 Containment Liner Corrosion Discoveryrev2.doc. (3 page(s), 4/28/2010)
- ML102950231 - E-Mail from O'Hara to Berrick, Scanned image from PX082MPO. (1 page(s), 4/29/2010)
- ML102950236 - E-Mail from Burritt to O'Hara et al., Branch 3 Status 4/29/10. (5 page(s), 4/29/2010)
- ML102950239 - Branch 3 Daily Status. (4 page(s), 4/29/2010)
- ML102950261 - E-Mail from Burritt to Cline, Salem Unit 2 Containment Liner Corrosion. (3 page(s), 4/29/2010)
- ML102950264 - Branch 3 Daily Status. (3 page(s), 4/30/2010)
- ML102950267 - E-Mail from OHara to Manoly. (1 page(s), 5/3/2010)
- ML102950268 - E-mail from OHara to Tsao, Salem-PSEG calcs. (2 page(s), 5/4/2010)
- ML102950274 - E-Mail from OHara to Tsao, Salem-PSEG calcs. (2 page(s), 5/4/2010)
- ML102950280 - E-Mail from OHara to Berrick, Scanned image from PX082MPO. (1 page(s), 5/5/2010)
- ML102950285 - E-Mail from Conte to Conte, et al., Conf. Logistics re: Salem Unit 2/1 AFW Pipe Degradation. (10 page(s), 5/10/2010)
- ML102950291 - E-Mail from Burritt to Conte, Conf. Logistics re: Salem Unit 2/1 AFW Pipe Degradation. (2 page(s), 5/10/2010)
- ML102950297 - E-Mail from OHara to Berrick, Guided Wave Data. (1 page(s), 5/12/2010)
- ML102950298 - E-Mail from Berrick to Hara, Response to 16 questions dated 05/12/10. (1 page(s), 5/12/2010)
- ML102980056 - E-Mail from Lew to Clifford et al., GAO entrance on audit of NRC Oversight of Buried Piping. (3 page(s), 5/18/2010)
- ML102980057 - E-Mail from Burritt to Clifford, Conference Details Notification Ltr NRC Buried Pipes. (6 page(s), 5/18/2010)
- ML102980058 - E-Mail from Ennis to Burritt et al., Action Regional RA periodic With the Chairman - Information Request Templates/Matrices. (3 page(s), 5/18/2010)
- ML102980059 - E-Mail from OHara to Berrick, NRC Inspector Questions AFW Buried Pipe. (2 page(s), 5/19/2010)
- ML102980060 - E-Mail from OHara to Berrick, Final Report - Guided Wave Technology. (2 page(s), 5/19/2010)
- ML102980061 - E-Mail from OHara to Berrick, Final Report - Guided Wave Technology. (3 page(s), 5/19/2010)
- ML102980075 - E-Mail from OHara to Conte, et al., NRC Inspector Questions AFW Buried Pipe. (3 page(s), 5/26/2010)
- ML102980076 - E-Mail from OHara to Berrick, Requests & Question. (2 page(s), 5/27/2010)
- ML102980077 - E-Mail from OHara to Schroeder, AFW EQ: ACE? (1 page(s), 6/15/2010)
- ML102980078 - E-Mail from Rao to Turilin, Significant Accomplishments/Challenges for Branch 3. (3 page(s), 6/24/2010)
- ML102980131 - E-Mail from OHara to Conte, ISI Exit Meeting. (1 page(s), 6/25/2010)
- ML102980132 - E-mail from OHara to Bearde, Salem Unit 1 ISI Feeder. (27 page(s), 6/30/2010)
- ML102980133 - E-Mail from Conte to DeFrancisco, ISI Inspection Feeder. (29 page(s), 7/20/2010)
- ML102980134 - E-Mail from Cahill to Conte, Feeder Review. (1 page(s), 7/2/2010)
- ML102980135 - E-Mail from DeFrancisco to Ambrosini, Enforcement for OC Finding. (3 page(s), 7/21/2010)
- ML102980136 - E-Mail from Douglas to Cline, Input Needed for NRR Management Meeting. (4 page(s), 7/22/2010)
- ML102980146 - E-Mail from Burritt to Ennis, Input Needed for NRR Management Meeting. (1 page(s), 7/22/2010)
- ML102980145 - E-Mail from Brown to Conte, Buried Pipe Degradation at Salem. (1 page(s), 9/8/2010)
- ML102980147 - E-mail from Conte to Burritt et al., Salem1. (2 page(s), 9/8/2010)
- ML102980148 - E-Mail from OHara to Brown, Salem 1. (26 page(s), 9/8/2010)
- ML102980156 - E-Mail from Burritt to Schroeder, Board Item re: Buried Pipe Degradation at Salem. (2 page(s), 9/13/2010)
- ML102980157 - E-Mail from Conte to Brown, Board Item re: Buried Pipe Degradation at Salem. (3 page(s), 9/15/2010)
- ML102980158 - E-Mail from Villar to OHara, Final MRC Approved ISI RCE. (1 page(s), 9/15/2010)
- ML102980159 - E-Mail from King, IOEB Clearinghouse Screening Summary for Thursday, September 16, 2010. (3 page(s), 9/16/2010)
- ML102980160 - E-mail from Burritt to Lew, Huge Favor - Talking Point Regarding Salem Buried Pipe Excavations. (17 page(s), 6/11/2010)
- ML102940103 - FOIA/PA-2010-0334 - Resp 4 - Partial. (4 page(s), 10/19/2010)
- ML102150533 - Revision of July 30, 2010 - Inservice Inspection Activities Inspection Feeder for Salem Unit 1, Inspection Report 05000272/2010003. (28 page(s), 8/3/2010)
- ML102940085 - E-Mail from Modes to OHara, Update on Salem AFW Condition. (1 page(s), 4/7/2010)
- ML102940086 - E-Mail from Clifford to Lew, Notes from Fricker call. (4 page(s), 4/21/2010)
- ML102940087 - E-Mail from O'Hara to Tsao, Scan from Salem/Hope Creek HP5035. (1 page(s), 4/22/2010)
- ML102940088 - E-Mail from Modes to O'Hara, Salem Unit 1 AFW Hydro Question. (1 page(s), 4/25/2010)
- ML102940089 - E-Mail from Pelton to Sakai, DLR (Pelton) E-Mail for Inclusion in Salem AFW FOIA 2010-0334. (4 page(s), 9/27/2010)
- ML102940090 - E-Mail from Conte to Alley, Followup Question. (1 page(s), 5/3/2010)
- ML102940091 - E-Mail from Conte to Alley, Salem AFW summary. (2 page(s), 5/6/2010)
- ML102940092 - E-Mail from Schroeder to Ennis, Scan from Salem/Hope Creek HP5035. (4 page(s), 5/10/2010)
- ML102940093 - Memorandum to Burritt from O'Hara, Revision of July 30, 2010 - Inservice Inspection Activities Inspection Feeder for Salem Unit 1, Inspection Report 05000272-10-003. (28 page(s), 8/3/2010)
- ML102940094 - E-Mail from Balian to Burritt, Some AFW Pictures - No Action Required. (8 page(s), 4/12/2010)
- ML102940095 - E-Mail from Sabisch to Conte, AFW Buried Piping Issue at Oconee. (3 page(s), 4/13/2010)
- ML102940096 - E-Mail from Conte to OHara, Need for conference call re: FEA of Degraded Salem Unit 1 FAW Piping. (3 page(s), 4/26/2010)
- ML102940097 - E-Mail from Tsao to OHara, FEA of Degraded Salem Unit 1 AFW Piping. (5 page(s), 4/26/2010)
- ML102940098 - E-Mail from Ennis to Conte, Salem AFW Piping Testing. (10 page(s), 4/27/2010)
- ML102940099 - E-Mail from OHara to Conte, Scan from Salem/Hope Creek HP5035. (5 page(s), 4/30/2010)
- ML102940100 - E-Mail from Tsao to Evans, Salem - status of buried AFW pipe as of 5/4/10. (3 page(s), 5/4/2010)
- ML102940101 - E-Mail from Giles to OHara, Salem ISI Program Dates. (3 page(s), 5/24/2010)
- ML102940102 - E-Mail from Tsao to Manoly, FEA of Degraded Salem Unit 1 AFW Piping. (4 page(s), 4/26/2010)
- ML103000195 - FOIA/PA-2010-0334 - Resp 5 - Partial. (4 page(s), 10/22/2010)
- ML103000197 - Document Drawing 80101381RO H02R1, Salem Auxiliary Feedwater. (2 page(s), 12/8/1971)
- ML103000198 - Document: Salem Unit 2 Detail Test Procedure Approval Record. (7 page(s), 9/5/1978)
- ML103000199 - Document: Calculation Continuation Revision History Sheet. (120 page(s), 12/28/1995)
- ML103000196 - Document Schedule: Subject: Buried AFW Pipe Schedule. (4 page(s), 4/11/2010)
- ML103000200 - Document: NBU Weld Joint Notice #80101382, Salem Unit 1. (21 page(s), 4/20/2010)
- ML103000201 - Document: Ultrasonic Thickness Examination Record, Order #60084266, Procedure #OU-AA-335-004. (2 page(s), 4/20/2010)
- ML103000202 - Salem 1R20 NRC Items of Interest Punchlist. (10 page(s), 5/3/2010)
- ML103000203 - Document: Stress and Support Summary. (13 page(s), 4/22/2010)
- ML103000204 - Document: Design Analysis Minor Revision, Subject: Qualification of Safety-Related Buried Commodities for Tornado Missile and Seismic Evaluation. (8 page(s), 5/24/2010)
- ML103000403 - Document: PSEG Notification 2041785. (2 page(s), 5/5/2010)
- ML103010496 - Document: 1R20 AF Buried Pipe Insp Results, Notification #20457262, Salem 1- Auxiliary Feedwater. (75 page(s), 8/18/2010)
- ML103010497 - Document: Operation Key Info, Buried Pipe Program Inspection Reports for 12 and 14 Aux Feedwater Lines. (11 page(s), 8/18/2010)
- ML103000402 - Document PSEG Notification 20462034 Basis AFW Discharge Line Design Pressure. (8 page(s), 9/21/2010)
- ML103000404 - Document PSEG Notification 20459689 ASME SEC XI Aux Feed Water Pressure Test. (63 page(s), 9/21/2010)
- ML103000405 - Document: Operability Evaluation, OpEval, Rev 0, Salem Unit 2 with Handwritten Notes. (15 page(s), 10/22/2010)
- ML103000406 - Document: SAP685996. (4 page(s), 10/22/2010)
- ML103000407 - Large Bore Pipe Detail Index List PSBP No. 132419, Aux Feedwater. (3 page(s), 10/22/2010)
- ML103000408 - Document: Drawings 80101382R2, Unit Reactor Containment Aux Feedwater Elevation. (2 page(s), 10/22/2010)
- ML103000409 - Document: Label Request Form, Label 12AF155 S1 AIX. (4 page(s), 10/22/2010)
- ML103000337 - Document: Configuration Change #80101381 Rev 1. (24 page(s), 10/22/2010)
- ML103000338 - Document: Salem NRC Punchlist. (3 page(s), 10/22/2010)
- ML103000339 - Document: Operability Evaluation, OpEval, Rev 0 Salem Unit 2. (15 page(s), 10/22/2010)
- ML103000340 - Document: Operability Evaluation, OpEval, Rev 0, Salem Unit 2, Draft. (20 page(s), 10/22/2010)
- ML103000341 - Document: Operability Evaluation, OpEval, Rev 0, Salem Unit 2, with Handwritten Notes. (18 page(s), 10/22/2010)
- ML103000342 - Document: Operability Evaluation, OpEval, Rev 0, Salem Unit 2 with Handwritten Notes. (16 page(s), 10/22/2010)
- ML103000460 - E-Mail from Romero to Adair, Salem Unit 1 Underground Auxiliary Feedwater Piping Preliminary Evaluation Results. (58 page(s), 4/21/2010)
- ML103000443 - E-Mail from Petrowski-to Berrick, S1 Aux. Feed. (2 page(s), 9/22/2010)
- ML103440442 - FOIA/PA-2010-0334 - Resp 6 - Final. (6 page(s), 12/8/2010)
- ML103440447 - Document: Inservice Testing Auxiliary Feedwater Valves Mode 3. S2.OP-ST.AF-0007Q Rev. 20. (13 page(s), 12/23/2009)
- ML103440448 - Document: Salem Unit 1 12/14 AF Piping Reroute, #80101382 Rev 2. (7 page(s), 4/24/2010)
- ML103440449 - Document: Apparent Cause Evaluation Template Document: from Robert Montgomery. (27 page(s), 4/5/2010)
- ML103440450 - Document: Design Analysis Minor Revision #6S0-1 889 Revision 4A, Subject: Design Basis Evaluation of Critical Auxiliary Building Walls W/Drawings. (45 page(s), 4/20/2010)
- ML103440451 - Document: Ansys Input Files and Calculation Package Drafts. (95 page(s), 4/23/2010)
- ML103440443 - Document: Salem ASME Section XI In-Service Inspection ISI Implementation #70109827. (35 page(s), 6/9/2010)
- ML103440444 - Document: Configuration Change #80101382 Rev 2. (41 page(s), 12/8/2010)
- ML103440445 - Document: Auxiliary Feedwater Control Air Buried Piping Degradation, CR # 20458568/70109108 Salem Unit 1 with Markup, Evaluated by Robert Montgomery. (27 page(s), 12/8/2010)
- ML103440446 - Document: Auxiliary Feedwater Control Air Buried Piping Degradation, CR # 20458568/70109108 Salem Unit 1, Evaluated by Robert Montgomery. (27 page(s), 12/8/2010)
- ML103440452 - Document: Salem ASME Section XI In-Service Inspection Implementation #70109827. (35 page(s), 12/8/2010)
- ML103440453 - Email from R Swartzwelder to Masten, Aux Feed Pipe Coating. (9 page(s), 4/10/2010)
- ML103440454 - Email from Kriczky to Spence and Masten, CL Curing Time Prior to Backfilling. (8 page(s), 4/23/2010)
- ML103440455 - Document: Salem NRC Punchlist. (10 page(s), 12/8/2010)