Home > NRC Library > ADAMS Public Documents
Web package for FOIA/PA-2008-0046
Accession Number: ML082900222
Date Released: Wednesday, October 22, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML073190589 - FOIA/PA-2008-0046 - Crossflow Ultrasonic Flow Meter (UFM), all documents re: meeting between NC & Westinghouse and/or ABB Combustion Engineering Nuclear Power Inc.; all documents concerning any version of Crossflow from 1-1-99 to present (3 page(s), 11/15/2007)
- ML080390543 - FOIA/PA-2008-0046 - Resp 1 - Partial. (10 page(s), 1/10/2008)
- ML003721347 - SUBMITTAL OF CROSSFLOW TOPICAL REPORT "-A" APPROVED VERSION (6 page(s), 6/2/2000)
- ML003721447 - SUBMITTAL OF CROSSFLOW TOPICAL REPORT "-A" APPROVED VERSION {ENCLOSURE CONTAINS PROPRIETARY INFORMATION} (6 page(s), 6/2/2000)
- ML020230131 - Description of CrossflowXT Ultrasonic Flow Measurement System (Enclosure 1-P Contains Westinghouse Proprietary Class 2 Material). (11 page(s), 1/18/2002)
- ML032170565 - Extension of Crossflow Signal Conditional Unit Re-Calibration Period. (9 page(s), 7/31/2003)
- ML032720938 - Westinghouse - Affidavit & Non-Proprietary Meeting Slides - Crossflow root cause meeting September 26, 2003 (TAC No. MB1365). (44 page(s), 9/15/2003)
- ML032521438 - Westinghouse - Technical Bulletin TB-03-6 , Crossflow Ultrasonic Flow Measurement System SIgnal Issues, dtd 09/05/2003. (4 page(s), 9/5/2003)
- ML033421289 - Westinghouse - NSAL 03-12 - 12/05/03 Crossflow Ultrasonic Measurement System. (7 page(s), 12/5/2003)
- ML040350592 - CROSSFLOW Ultrasonic Flow Measurement System, X-Beam Modification (Proprietary/Non-Proprietary). (9 page(s), 2/2/2004)
- ML041840089 - Westinghouse Review of Information Contained in NRC Letter and Attachment Regarding the Westinghouse/AMAG CROSSFLOW Ultrasonic Flow Meter (Proprietary Final Report). (1 page(s), 6/29/2004)
- ML041840090 - Westinghouse Review of Information Contained in NRC Letter and Attachment Regarding the Westinghouse/AMAG CROSSFLOW Ultrasonic Flow Meter (Proprietary Final Report) - Attachment 1. (1 page(s), 6/29/2004)
- ML043000155 - Westinghouse Owners Group - Comparison of CROSSFLOW and ASME Flow Section Feedwater Flow Measurement at Kewaunee Nuclear Power Plant. (8 page(s), 10/20/2004)
- ML043520132 - Westinghouse Owners Group - Assurance that CROSSFLOW Technology, Installation, and Operation Maintain Design and Licensing Basis (Proprietary.) (27 page(s), 12/10/2004)
- ML052070341 - Westinghouse Owners Group - Cover Letter and Affidavit - Information Copy of CROSSFLOW Ultrasonic Flow Meter User Guidelines - WCAP-16437-P (TAC No. MC1913). (10 page(s), 7/19/2005)
- ML052560455 - Westinghouse - NON-Proprietary Meeting Slides 9/12/05, CROSSFLOW (TAC No. MC1913) (34 page(s), 9/12/2005)
- ML061010244 - LTR-NRC-06-13 NP-Attachment "CROSSFLOW Ultrasonic Flow Measurement System - NRC Status Meeting," March 29, 2006, Rockville, MD. (54 page(s), 3/29/2006)
- ML061510102 - Presentation Materials Used at April 28, 2006 CROSSFLOW Meeting. (7 page(s), 5/24/2006)
- ML061570128 - "Projected Content for CROSSFLOW Topical Report Revision" (Proprietary/Non-proprietary). (7 page(s), 5/30/2006)
- ML061570129 - CENPD-397-P-A, Rev. 1, Project Content for Crossflow Topical Report Revision. (11 page(s), 5/31/2006)
- ML061570162 - LTR-PS-06-24 NP-Attachment Statistical Comparison of CROSSFLOW Test Data to Other High Precision Flow Instrumentation. (22 page(s), 5/31/2006)
- ML061570145 - LTR-NRC-06-35 NP-Attachment, "CROSSFLOW Ultrasonic Flow Measurement System Standard and Non-Standard Installations." (7 page(s), 5/31/2006)
- ML061570114 - IR 03012795-06-001, on 05/23/26, Intermet-Archer Creek Foundry, Lynchburg, VA, Form 591M Part 1. (1 page(s), 5/23/2006)
- ML061570161 - Statistical Comparison of CROSSFLOW Test Data to Other High Precision Flow Instrumentation (Proprietary/Non-proprietary). (7 page(s), 6/1/2006)
- ML061570168 - Transmittal of Applied Research Laboratory/Pennsylvania State University Investigations Concerning the CROSSFLOW Technology (Proprietary). (7 page(s), 6/1/2006)
- ML061580091 - Transmittal of Response to NRC Draft Status Report on CROSSFLOW Ultrasonic Flowmeter (Proprietary). (7 page(s), 6/2/2006)
- ML040350598 - WCAP-16163-NP, Revision 0, "Improved Flow Measurement Accuracy Using Crossflow Ultrasonic Flow Measurement Technology." (20 page(s), 1/31/2004)
- ML071280797 - Discussion of the CROSSFLOW Ultrasonic Flow Measurement System Topical Report Safety Evaluation. (25 page(s), 5/1/2007)
- ML071280804 - CROSSFLOW Utility Users' Perspective on NRC Review. (3 page(s), 5/1/2007)
- ML071580119 - Proposed Alternate Approach to Complete Suspension of CROSSFLOW Topical Report Approval. (9 page(s), 6/4/2007)
- ML071770313 - Y20070139 - Proposed Alternate Approach to Complete Suspension of Crossflow Topical Report Approval. (11 page(s), 6/4/2007)
- ML080250137 - Flow Error Calculation Explanation. (1 page(s), 1/10/2008)
- ML080250151 - Byron Unit 1, Graphs. (3 page(s), 1/10/2008)
- ML080250161 - An AMAG Analogy - Attachment 1. (5 page(s), 1/10/2008)
- ML080250168 - AMAG Time Line. (1 page(s), 1/10/2008)
- ML080250179 - Perform Disposition Review of RIS 2007-24. (8 page(s), 1/10/2008)
- ML080250184 - AMAG Loop Corrosion Factor vs. date for Byron Unit 2. (1 page(s), 1/10/2008)
- ML080250190 - AMAG Corrosion Factor for Reactor Coolant loop vs. Date for Byron Unit 1. (1 page(s), 1/10/2008)
- ML080250196 - AMAG Feedwater Measurement Primer. (11 page(s), 1/10/2008)
- ML080250209 - Apparent Cause Evaluation Quality Checklist. (1 page(s), 1/10/2008)
- ML080250444 - RIS 2007-24 AMAG/Crossflow Issue. (16 page(s), 1/10/2008)
- ML080250452 - Licensee Analysis Report. (36 page(s), 1/10/2008)
- ML080250465 - 10 CFR 50.59 Safety Evaluation Form Tracking No. 6G-00-0079 Rev. 1 for Byron Units 1 & 2. (27 page(s), 12/27/1999)
- ML080250471 - 10 CFR 50.59 Safety Evaluation Form Tracking No. 6G-00-0079 for Byron Units 1 & 2. (23 page(s), 12/27/1999)
- ML080250475 - AR 00659060, "Trending on Unit 1 FW Flow Ratio." (5 page(s), 8/9/2007)
- ML080250480 - Byron, Units 1 and 2 - Startup Report for Mid-Cycle Power Uprate. (19 page(s), 8/8/2001)
- ML080250484 - AR 00091771, "Unexplained Differences Between Byron & Braidwood." (49 page(s), 1/22/2002)
- ML080250485 - AR 00091771 "Unexplained Differences Between Byron & Braidwood." (4 page(s), 1/22/2002)
- ML080250488 - Apparent Cause Evaluation Content. (2 page(s), 9/13/2002)
- ML080250489 - E-mail From P. Rebstock to M. Chawla Re: ByronTP: Bases for Concern Regarding Byron Thermal Power Operating Point. (4 page(s), 1/8/2003)
- ML080280114 - Letter from J. Zwolinski to J. Skolds dated 1/22/03, Re: Licensed Thermal Power - Byron Station, Unit 1. (4 page(s), 1/22/2003)
- ML080280123 - Byron, Thermal Power Measurement. (7 page(s), 1/24/2003)
- ML080280154 - Byron Station, Unit 1, Licensed Thermal Power Limit Verification. (18 page(s), 2/5/2003)
- ML080280164 - 01/24/2003 Summary of Meeting with Exelon Generation Company, LLC., Byron Station, Unit 1 to Discuss the License Power Limit. (4 page(s), 2/26/2003)
- ML080280172 - Agenda for Steve Reynold's Visit to Byron. (2 page(s), 3/10/2003)
- ML080280174 - Licensed Thermal Power, Byron Station, Unit 1 - Request for Additional Information. (5 page(s), 7/8/2003)
- ML080280176 - Byron, Unit 1, Licensed Thermal Power Limit Verification. (3 page(s), 8/11/2003)
- ML080280180 - Timeline on Byron Thermal Power Issue from P. Lougheed (RIII) to A. Stone (RIII), et al. (1 page(s), 8/20/2003)
- ML080280186 - Byron, Unit 1, Power/AMAG Issue Update from P. Snyder (NRR) to A. Stone (RIII), et al. (1 page(s), 8/27/2003)
- ML080280190 - U1 Overpower? from P. Snyder (RIII) to A. Stone (RIII). (1 page(s), 8/28/2003)
- ML080280317 - Re: U1, Overpower? from A. Stone (RIII) to Branch Inspectors (RIII). (1 page(s), 8/28/2003)
- ML080280328 - Event Number: 40117. (1 page(s), 8/29/2003)
- ML080280333 - Bwd AMAG-addtl Info from N. Shah (RIII) to A. Stone (RIII), et al. (1 page(s), 9/2/2003)
- ML080280336 - Email from P. Snyder (RIII) to N. Shah (RIII), Subject: Re: Bwd AMAG-addtl Info. (1 page(s), 9/2/2003)
- ML080280341 - Byron Overpower?/Westinghouse Letter NSAL 03-6 from P. Snyder (NRR) to A. Stone (RIII), et al. (1 page(s), 9/3/2003)
- ML080280349 - TB-03-00, CROSSFLOW Ultrasonic Flow Measurement System Signal Issues from charles.m.molnar@us.westinghouse.com to bjb@dnrc.qov, et al, No Attachment. (1 page(s), 9/5/2003)
- ML080280356 - CROSSFLOW Ultrasonic Flow Measurement System Signal Issues. (4 page(s), 9/5/2003)
- ML080280367 - 09/18/2003 Notice of Public Meeting With Exelon Generation Co., LLC., to Discuss Concerning Byron, Units 1 Thermal Power Issue. (6 page(s), 9/9/2003)
- ML080280377 - FWD: OR Events Prebriefing/Briefing - September 16 & 17, 2003 from A. Stone (RIII) to Branch Inspectors (RIII). (1 page(s), 9/11/2003)
- ML080280400 - Byron Station Thermal Power Measurement. (30 page(s), 9/18/2003)
- ML080390544 - Braidwood/Byron AMAG Investigation of Organizational Effectiveness and Decision Making. (35 page(s), 9/22/2003)
- ML080280598 - FYI: New Westinghouse NSAL from Nirodh Shah (RIII) to R. Skokowski (RIII), P. Snyder (NRR). (1 page(s), 10/16/2003)
- ML080280580 - Assignment Report 00173510 CAPR to Revise Procedure and Initiate New Procedure. (2 page(s), 10/17/2003)
- ML080280585 - Public Meeting to Discuss Operation Above the Licensed Thermal Power Limits at the Byron Station. (6 page(s), 10/20/2003)
- ML080280591 - Re: Information you Requested During Friday's Visit from A. Stone (RIII) to R. Skokowski (RIII), et al. (1 page(s), 10/28/2003)
- ML080280594 - Byron Public Meeting Notice. (6 page(s), 11/18/2003)
- ML080280603 - NRC Question, Regarding AMAG Common Header Installation. (2 page(s), 12/12/2003)
- ML080280606 - CR 19852 - AMAG-Westinghouse Letter CAE-03-107 Not Accurate. (3 page(s), 12/23/2003)
- ML080280611 - Email from A. Stone (RIII) to S. Ray (RIII) Subject: Re: AMAG Status at Braidwood. (1 page(s), 12/29/2003)
- ML080280613 - Email from A. Stone (RIII) to Peter Snyder; R. Skokowski (RIII), Subject: Followup from Visit. (1 page(s), 1/14/2004)
- ML080290157 - Email from Ann Marie Stone (RIII) to Richard Skokowski (RIII) Subject: Re: Follow Up from Visit. (1 page(s), 1/14/2004)
- ML080290164 - Email from G. Dick (NRR) to R. Skokowski (RIII) Fwd: Conference Call with IEMA re: AMAG Issues at Byron and Braidwood. (1 page(s), 1/28/2004)
- ML080290239 - AR 00678322: NRC Suspends Topical Report for Use of CROSSFLOW (AMAG). (2 page(s), 10/1/2007)
- ML080290187 - 50.59 on Sodium Tracer Test E-mail From S. Ray (RIII) to R. Skokowski (RIII), et al. (1 page(s), 1/30/2004)
- ML080290202 - Byron Bulletin: Feedwater Tracer Test Planned with Safety as Top Priority. (2 page(s), 2/4/2004)
- ML080290206 - AR 00200745 - Feedwater Flow Tracer Test Preliminary Results. (6 page(s), 2/10/2004)
- ML080290218 - AMAG at Braidwood from S. Ray (RIII) to Skokowski, R. (RIII), et al. (1 page(s), 2/10/2004)
- ML080290222 - Re: AMAG at Braidwood from A. Stone (RIII) to G. Dick (NRR), et al (1 page(s), 2/10/2004)
- ML080290229 - AMAG at Braidwood from P. Snyder to S. Ray. (1 page(s), 2/10/2004)
- ML080290231 - Westinghouse Technical Bulletin: Information Regarding Recent CROSSFLOW Ultrasonic Flow Measurement System Performance Observations, TB-04-4. (5 page(s), 2/12/2004)
- ML080290369 - Actions from Initial Byron Tracer Test Results. (2 page(s), 2/17/2004)
- ML080290372 - Re: Review of Exelon's Implementation of the AMAG UFMs from G. Dick. (2 page(s), 2/23/2004)
- ML080290375 - Latest on AMAG at Braidwood. (1 page(s), 2/24/2004)
- ML080290381 - Re: Latest at AMAG at Braidwood from A. Stone (RIII) to C. Pederson. (1 page(s), 2/24/2004)
- ML080290388 - Unit 2 FW Flow Indication as a Result of 1996 AMAG Cal Test. (3 page(s), 2/24/2004)
- ML080290393 - Synopsis of PORC Review of FW Tracer Test Results. (1 page(s), 2/26/2004)
- ML080290408 - Supplemental One to Licensee Event Report (LER) 454-2003-003-00, "Licensed Maximum Power Level Exceeded Due to Inaccuracies in Feedwater Ultrasonic Flow Measurements Caused by Signal Noise Contamination". (5 page(s), 3/31/2004)
- ML080290415 - Letter from Chris Crane, Exelon Chief Nuclear Officer to Exelon Employees, dated 4/8/04, "INPO Classifies Overpower Condition as Significant,". (1 page(s), 4/8/2004)
- ML080290422 - Y020040131 - Westinghouse Conclusions Regarding Recent Crossflow Ultrasonic Flow Measurement System Performance Events. (4 page(s), 6/18/2004)
- ML080290426 - FYI: Palo Verde's UFM Problem. (2 page(s), 7/15/2004)
- ML080290611 - Fwd: FYI: Palo Verde's UFM Problem from G. Dick (NRR) to P. Snyder (NSIR). (1 page(s), 7/16/2004)
- ML080290617 - UFM Saga Continues... From P. Snyder to G. Dick (NRR), et al. (1 page(s), 7/16/2004)
- ML080290621 - Email from S. Shields (NRR) to OPEX Daily Report - Braidwood, et al, Subject: DIER - Daily Industry Event Report for Monday, July 19, 2004. (1 page(s), 7/16/2004)
- ML080290627 - Closeout of TIA on Byron 1 Overpower from George Dick (NRR) to Rich Skokowski (RIII). (1 page(s), 11/24/2004)
- ML080390545 - Closure Memo for Byron Overpower Issue. (2 page(s), 12/23/2004)
- ML080290655 - Email from D. Passehl (RIII) to R. Skokowski (RIII); Subject: 01 Report 3-2003-034 Byron (Unsubstantiated). (1 page(s), 1/11/2005)
- ML080290662 - Re: Do you have any violations drafted on the AMAG issue at Byron? from: A. Stone (Rill) to D. Passehl (Rill). (1 page(s), 2/28/2005)
- ML080290666 - Fwd: Re: Do You have Any Violations Drafted on the AMAG Issue at Byron? from D. Passehl to R. Skokowski. (1 page(s), 3/1/2005)
- ML080290669 - Email from Dave Passehl (RIll) to Thomas Tongue (RIIl); Subject: Tom, please check the allegation files on the AMAG issue for draft NCV writeups. (1 page(s), 3/7/2005)
- ML080290674 - EA-ELEC08-001, Rev. 12, "Uncertainty Calculation for Secondary Calorimetric Heat Balance." (23 page(s), 4/12/2005)
- ML080300231 - Re: AMAG from Nirodh Shah (RIll) to Richard Skokowski (RIll). (1 page(s), 4/27/2005)
- ML080300239 - Application for Withholding Proprietary Information from Public Disclosure, Supporting Material for NRC Meeting Regarding Crossflow Ultrasonic Flow Measurement System Status. (6 page(s), 8/18/2005)
- ML080300249 - CA023795 GAP Analysis Needed for AMAG CROSSFLOW User Guidelines. (10 page(s), 5/18/2006)
- ML080300254 - CA023796 GAP Analysis Needed for AMAG CROSSFLOW User Guidelines. (4 page(s), 5/18/2006)
- ML080300260 - Caldon Experience in Nuclear Feedwater Flow Measurement. (23 page(s), 8/30/2006)
- ML080300263 - CA027407 Due to AMAG Accuracy Concerns, Reactor Power Should be Limited to 99.7%. (2 page(s), 10/18/2006)
- ML080300268 - Email from N. Shah (RIll) to D. Kimble, et al (RIII), Subject: Jim C. is interested in LaSalle flowrate and Bwd/By AMAG background info with attachment (Attachment has excerpts from multiple documents). (10 page(s), 2/1/2007)
- ML080300283 - CAP048767 "Feedwater correction factor not able to be updated." (2 page(s), 4/2/2007)
- ML080300293 - CAP048900 "Feedwater correction factor cannot be put into service." (1 page(s), 4/7/2007)
- ML080300298 - CAP050122 - P-1 check at 75% power exceeded mismatch limits in 2 of the 5 calculations. (89 page(s), 6/1/2007)
- ML080300395 - AR 676460, "Caldon/FW Ratio Reaches 0.999," (4 page(s), 9/27/2007)
- ML080300402 - NRC Regulatory Issue Summary 2007-24, "NRC Staff Position on Use of the Westinghouse Crossflow Ultrasonic Flow Meter for Power Uprate or Power Recovery." (5 page(s), 2/27/2007)
- ML080300409 - Email from Caldwell to Anne Boland et al Re: Fwd: Press Release - NRC Publishes Regulatory Issue Summary on Feedwater Flow Meter Issues. (4 page(s), 9/27/2007)
- ML080280309 - FOIA/PA-2008-0046 - Resp 4 - Partial. (2 page(s), 1/23/2008)
- ML080280315 - Section 5 - A Description of the Crossflow System to Support 1.4% Power Uprate at San Onofre Nuclear Generating Station (SONGS). (32 page(s), 1/23/2008)
- ML080280318 - Section 6 - Installation and Initial Operating Experience with the Crossflow Ultrasonic Flow and Temperature at SONGS, Units 2 & 3. (42 page(s), 1/23/2008)
- ML080280323 - Theory and Application of a Non-Invasive Ultrasonic Cross-Correlation Flowmeter. (4 page(s), 2/2/2000)
- ML080280326 - In-service Performance of Ultrasonic Flowmeters - Application and Validation of CFD Modeling Methods. (43 page(s), 10/31/2002)
- ML080280331 - Flow Measurement Guidance Note No. 34, "The Effect of Upstream Bends on Transit-Time Ultrasonic Flowmeter." (4 page(s), 2/28/2003)
- ML080280339 - Technical Report, "CFD Modeling of Fluid and Heat Flow in Byron Common Header." (20 page(s), 3/31/2004)
- ML080280344 - Estimation of the Flow Profile Correction Factor of a Transit-Time Ultrasonic Flow Meter for the Feedwater Flow Measurement in a Nuclear Power Plant. (5 page(s), 6/30/2005)
- ML080280353 - E-mail P. Rebstock to I. Ahmed re: CrossFlow UFM: Draft Safety Evaluation Withdrawing Acceptance. (2 page(s), 9/28/2006)
- ML080280358 - E-mail P. Rebstock to W. Lyon re: CrossFlow UFM: Draft Safety Evaluation Withdrawing Acceptance. (2 page(s), 10/2/2006)
- ML080280368 - E-mail P. Rebstock to S. Arndt re: Flowmeter. (2 page(s), 10/3/2007)
- ML080280376 - E-mail P. Rebstock to I. Ahmed re: CrossFlow UFM: Draft Safety Evaluation Withdrawing Acceptance. (3 page(s), 10/5/2006)
- ML080280380 - E-mail P. Rebstock to W. Lyon re: CrossFlow UFM: PJR comments on 2006 Oct 12, Draft SE and Additional Thoughts. (4 page(s), 10/16/2006)
- ML080280384 - E-mail P. Rebstock to H. Nieh re: CrossFlow UFM: PJR comment on 2006 Oct 12, Draft SE, and Additional Thoughts. (4 page(s), 2/12/2007)
- ML081550675 - FOIA/PA-2008-0046 - Resp 5 - Partial. (2 page(s), 6/2/2008)
- ML061510110 - Presentation Materials Used at April 28, 2006 Crossflow Meeting. (106 page(s), 4/28/2006)
- ML081630413 - FOIA/PA-2008-0046 - Resp 7 - Partial. (3 page(s), 5/21/2008)
- ML081630410 - AMAG Root Cause Final Rev. 1. (270 page(s), 9/19/2003)
- ML081630411 - AMAG Root Cause Final. (106 page(s), 9/19/2003)
- ML081630412 - AMAG Root Cause Final. (88 page(s), 9/26/2003)
- ML081410854 - FOIA/PA-2008-0046 - Resp 9 - Partial. (2 page(s), 5/16/2008)
- ML003677941 - CENPD-397-P, REV. 01 SUPPLEMENTAL INFORMATION TRANSMITTAL (ENCLOSURE 1-P CONTAINS PROPRIETARY INFORMATION) (12 page(s), 1/25/2000)
- ML061570144 - CROSSFLOW Ultrasonic Flow Measurement System Standard and Non-Standard Installations (Proprietary/Non-proprietary). (7 page(s), 5/31/2006)
- ML081570053 - FOIA/PA-2008-0046 - Resp 10 - Partial. (4 page(s), 5/30/2008)
- ML081570039 - Letter from I. Rickard, ABB to Document Control Desk on Response to verbal request for additional information regarding NRC review of CENPD-397, Rev 1. (8 page(s), 3/8/2000)
- ML081570040 - Letter to T. Quay, NRR, to J. Gresham, Westinghouse, "Response to Request for Additional Information Request the Crossflow Ultrasonic Flow Measurement System." (14 page(s), 1/16/2004)
- ML081570041 - Warren Lyon - Active Work Assignments - FY 2007. (5 page(s), 9/27/2007)
- ML081570042 - Warren Lyon Active work Assignments - FY 2008. (1 page(s), 12/20/2007)
- ML081570043 - Letter from J. Gresham, WEC to Document Control Desk on Projected Content for Crossflow Topical Report Revision. (4 page(s), 5/30/2006)
- ML081570044 - Letter from J. Gresham, WEC to Document Control Desk on Applied Research Lab/Pennsylvania State University Investigations concerning the Crossflow Technology. (4 page(s), 6/1/2006)
- ML081570045 - Letter from J. Gresham, WEC to Document Control Desk on Transmittal of Response to NRC Draft Status Report on Crossflow Ultrasonic Flowmeter. (4 page(s), 6/2/2006)
- ML081570046 - Email from W. Lyon, NRR to J. Nakoski, NRR and T. Collins, NRR on Reply to Evangelos Email. (2 page(s), 10/4/2006)
- ML081570047 - Email from W. Lyon, NRR to J. Nakoski, NRR and T. Collins, NRR on Nonconcurrence Attached. (16 page(s), 10/30/2006)
- ML081570048 - Email from W. Lyon, NRR to J. Nakoski, NRR and T. Collins, NRR on Rev 2 of Nonconcurrence Memo. (16 page(s), 10/31/2006)
- ML081570049 - Email from W. Lyon, NRR to J. Nakoski, NRR on Crossflow. (15 page(s), 11/1/2006)
- ML081570050 - Email from T. Martin, NRR to T. Collins, NRR and J. Wermiel, NRR on Communication Plan for Westinghouse Crossflow UFM. (2 page(s), 11/6/2006)
- ML081570051 - Email from J. Nakoski, NRR to T. Collins, NRR on Comm Plan for Crossflow. (2 page(s), 11/21/2006)
- ML081570052 - Email from T. Alexion, NRR to T. Collins, NRR on Comm Plan. (2 page(s), 11/27/2006)
- ML081900641 - FOIA/PA-2008-0046 Resp 12 - Partial. (4 page(s), 7/2/2008)
- ML081900614 - Draft Memo on Recommended Action in Response to the NRC Staff Evaluation of Using the Crossflow Ultrasonic Flowmeter to Determine Feedwater Flow Rate and to Achieve Increased Thermal Power. (2 page(s), 7/2/2008)
- ML081910220 - Draft Memo, Modification of Final Version, from Lyons, NRR to Cranston, Wermiel, Ruland, Assessment of the Westinghouse / Advance Measurement and Analysis Group (W/AMAG) Crossflow Ultrasonic Flowmeter. (115 page(s), 7/2/2008)
- ML081900618 - PWR 7: Ultrasonic Flow Meter Assessment. (3 page(s), 5/17/2007)
- ML081900619 - E-mail from W. Lyon, NRR to T. Hipschman, OCM re: RIS 2007-24. (1 page(s), 10/28/2007)
- ML081900620 - Notes on NRC SER on ER-262, Revision 7. (10 page(s), 2/5/2003)
- ML081900621 - E-mail from W. Ruland, NRR to T. Bloomer, OEDO Fwd: FYI - Jaczko Briefing Request. (1 page(s), 10/29/2007)
- ML081900622 - W. Lyons, NRR Notes on 8/30/05 trip to Calvert Cliffs. (2 page(s), 9/13/2005)
- ML081910221 - Evaluation of the Westinghouse Crossflow Ultrasonic Flow Meter. (8 page(s), 12/2/2005)
- ML081900628 - AMAG Questions. (2 page(s), 1/2/2006)
- ML081900629 - Request for Additional Information Crossflow and X-Beam Ultrasonic Flow Measurement Devices Westinghouse/AMAG. (4 page(s), 1/12/2006)
- ML081900630 - E-mail from J. Nakoski, NRR to T. Collins, NRR and W. Lyon, NRR on Revised Withdrawal Memo/Letter of Crossflow Topical Report Approval. (4 page(s), 8/3/2006)
- ML081900633 - E-mail from W. Lyon, NRR to T. Collins, NRR on Here's my First Pass. (3 page(s), 8/3/2006)
- ML081900634 - E-mail from J. Nakoski, NRR to J. Harris, NRR on Memo from T. Martin to H. Nieh re: Crossflow. (4 page(s), 8/4/2006)
- ML081900635 - E-mail from J. Nakoski, NRR to T. Collins, NRR et al. Crossflow Topical Report Withdrawal SE. (2 page(s), 8/24/2006)
- ML081900636 - E-mail from J. Nakoski, NRR to T. Collins, NRR et al. Crossflow SE Comments Incorporated. (2 page(s), 8/29/2006)
- ML081900637 - E-mail from J. Nakoski, NRR to T. Collins, NRR and W. Lyon, NRR on Latest Version of the Crossflow SE. (2 page(s), 9/11/2006)
- ML081900638 - E-mail from J. Nakoski, NRR to A. Howe, NRR and E. Marinos, NRR on Crossflow Topical Report Withdrawal Safety Evaluation and letter to W/AMAG. (4 page(s), 9/21/2006)
- ML081900639 - E-mail from W. Lyon, NRR to J. Nakoski, NRR and T. Collins, NRR on Request from Jerry. (4 page(s), 10/11/2006)
- ML081900640 - E-mail from E. Marinos, NRR to W. Lyon, NRR Fwd: Westinghouse Crossflow Safety Evaluation (My non concurrence) (4 pages) - Exemptions 4 and 5. (4 page(s), 10/19/2006)
- ML081700145 - FOIA/PA-2008-0046 - Resp 14 - Partial. (3 page(s), 6/16/2008)
- ML081700138 - NRC Review of Combustion Engineering CENPD-397-P-A, "Improved Flow Measurement Accuracy Using CrossFlow Measurement Technology" - Draft Safety Evaluation for Withdrawal of Acceptance. (4 page(s), 1/11/2008)
- ML081700139 - Memo from E. Marinos, NRR to S. Dembek, NRR on Review of ABB-CENP Topical Report CENPD-397-P, "Improved Flow Measurement Accuracy Using Crossflow Ultrasonic Flow Measurement Technology." (10 page(s), 3/15/2000)
- ML081700140 - Memo from E. Marinos, NRR to S. Dembek, NRR on Review of ABB-CENP Topical Report CENPD-397-P, "Improved flow Measurement Accuracy Using Crossflow Ultrasonic Flow Measurement Technology." (9 page(s), 3/16/2000)
- ML081700141 - NGG Procedure Approval/History Form. (61 page(s), 4/3/2000)
- ML081700142 - Byron U-1 AMAG Implementation. (24 page(s), 10/26/2000)
- ML081700143 - NRC Review of Combustion Engineering CENPD-397-P-A, "Improved Flow Measurement Accuracy Using CrossFlow Measurement Technology" - Revised Draft Safety Evaluation for Withdrawal of Acceptance and Calculations. (6 page(s), 10/12/2006)
- ML041770229 - Non-Proprietary Version of the Final Report of the Ultrasonic Flow Meter Allegation Task Group Regarding the Westinghouse/AMAG Crossflow Ultrasonic Flow Meter. (43 page(s), 7/1/2004)
- ML082130110 - FOIA/PA-2008-0046 - Resp 17 - Partial. (2 page(s), 7/29/2008)
- ML082130108 - Letter from I. Rickard, ABB to Document Control Desk. Non-Proprietary Response to NRC Request for Additional Information Supporting Topical Report CENPD-397-P Review Activities. (38 page(s), 12/17/1999)
- ML082130109 - Enclosure 3 to WOG-04-622, Non-Proprietary White Paper, Assurance that CROSSFLOW Technology, Installations, and Operations Maintain Design and Licensing Basis. (19 page(s), 12/31/2004)
- ML082170277 - FOIA/PA-2008-0046 - Resp 18 - Partial. (2 page(s), 8/1/2008)
- ML042020159 - 07/01/2004 Summary of Meeting with Westinghouse, Westinghouse Owners Group, AMAG & Caldon Regarding Proposed Generic Correspondence Related to Use of Ultrasonic Flow Meters for Feedwater Flow Measurement. (5 page(s), 7/28/2004)
- ML060870062 - Response to Request for Additional Information Regarding the CROSSFLOW Ultrasonic Flow Measurement System (Proprietary/Non-Proprietary). (14 page(s), 3/24/2006)
- ML082200622 - FOIA/PA-2008-0046 - Resp 19 - Partial. (4 page(s), 8/7/2008)
- ML082210290 - FOIA/PA-2008-0046 - Resp 20 - Partial. (2 page(s), 8/5/2008)
- ML082210283 - Internal Use Only Memo, Subject: Regulatory Issue Summary 2007-24 "NRC Staff Position on Use of the Westinghouse Crossflow Ultrasonic Flow Meter for Power Uprate or Power Recovery." (1 page(s), 8/5/2008)
- ML082210284 - Email from P. Rebstock to M. Chawla (NRR), Subject: Byron TP: Bases for Concern Regarding Byron Thermal Power Operating Point. (3 page(s), 1/8/2003)
- ML082210285 - Memo to C. Pederson (RIII) from E. Hackett (NRR), Subject: Request for Technical Assistance (TIA 2003-002) - Review of Licensee's Response to Concern Regarding Potential for Byron Nuclear Power Station to Exceed its Licensed Thermal Power Limits. (5 page(s), 6/30/2004)
- ML082210286 - Email from M. Phillips to EDO Daily Distribution for RIII Re: EDO Daily Notes for 09-25-07. (5 page(s), 9/24/2007)
- ML082210287 - Email from Steven West to DRS Branch Chiefs Re: FWD: Feedback on Westinghouse Crossflow UFM. (3 page(s), 11/16/2007)
- ML082210288 - Email from Steven West to Dwight Chamberlain et al Re: Feedback on Westinghouse Crossflow UFM. (3 page(s), 11/16/2007)
- ML082210289 - Email from Cynthia Pederson to DRP Bcs. Re: Fwd: Feedback on Westinghouse Crossflow UFM. (3 page(s), 11/19/2007)
- ML082380970 - FOIA/PA-2008-0046 - Resp 21 - Partial. (5 page(s), 8/20/2008)
- ML052350672 - Supporting Material for NRC Meeting Regarding CROSSFLOW Ultrasonic Flow Measurement System Status, CROSSFLOW Status Update September 12, 2005, Non-Proprietary Version. (24 page(s), 8/18/2005)
- ML063450261 - NRC Regulatory Issue Summary 2007-24: NRC Staff Position on Use of the Westinghouse Crossflow Ultrasonic Flow Meter for Power Uprate or Power Recovery. (6 page(s), 9/27/2007)
- ML053610204 - Westinghouse Owners Group, Transmittal of Presentation Material Used at November 17, 2005, CROSSFLOW Task Force Meeting (Proprietary) (Cover letter and Enclosure 2). (9 page(s), 12/21/2005)
- ML082380968 - Briefing, Subject: Byron and Braidwood Recent Potential Over Power Issues. (15 page(s), 11/19/2003)
- ML082380969 - Email from John Thorp to Adam Ziedonis et al Re: IOEB Screening Summary for Tuesday, October 2, 2007. (9 page(s), 10/2/2007)
- ML082470255 - FOIA/PA-2008-0046 - Resp 22 - Final. (6 page(s), 8/29/2008)
- ML053610205 - Enclosure 3 to WOG-05-546 - Presentation Material for November 17, 2005 NRC Meeting Regarding CROSSFLOW Ultrasonic Flow Measurement System. (Non-Proprietary Version). (31 page(s), 11/17/2005)
- ML082470253 - Ltr from Hauser to Printz, Exelon Nuclear Byron and Braidwood Nuclear Stations EXELON Frequency Spectrum Analysis Records. (4 page(s), 12/8/2003)
- ML082470254 - Ltr to Dembek, NRR, from J. Gresham, Westinghouse, "Comments on the Draft Report of the Ultrasonic Flow Meter Task Group." (3 page(s), 3/5/2004)