Home > NRC Library > ADAMS Public Documents
FOIA/PA-2000-0368 - Resp 10 - Partial.
Accession Number: ML011870042
Date Released: Monday, July 2, 2001
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML011860133 - FOIA/PA-2000-0368 - Resp 10 - Partial. (21 page(s), 6/25/2001)
- ML011860143 - Viewgraphs from Technical Working Group Mission Statement. (4 page(s), 6/25/2001)
- ML011860156 - Viewgraphs from Paul M. Blanch, Energy Consultant re: Improving Decommissioning Regulations. (11 page(s), 6/25/2001)
- ML011860171 - Viewgraphs from Lynnette Hendricks, NEI re: Decommissioning What's At Stake? (16 page(s), 6/25/2001)
- ML011860174 - Chart: Site-Specific Analysis Exemptions. (1 page(s), 6/25/2001)
- ML011860175 - Technical Working Group Paper. (2 page(s), 6/25/2001)
- ML011860178 - Technical Staff Working Group Mission Statement. (1 page(s), 6/25/2001)
- ML011860151 - Options for Spent Fuel Pool Heatup Analysis. (2 page(s), 6/25/2001)
- ML011860162 - Public Questions re spent fuel pool. (2 page(s), 6/25/2001)
- ML011860169 - Draft 2.3 Potential for Criticality re Spent Fuel Pool. (3 page(s), 6/25/2001)
- ML011860221 - Notes on Critical Decay Time. (1 page(s), 6/25/2001)
- ML011860226 - Handwritten note: Spool Structural Analysis, PNL, RES, BNL. (1 page(s), 6/25/2001)
- ML011860230 - Handwritten note: Heavy Loads. (1 page(s), 6/25/2001)
- ML011860234 - Viewgraphs on Recommended Crtieria, Approaches, and Methods. (6 page(s), 6/25/2001)
- ML011860243 - Draft Revision 1, Appendix 9, Assessment of Heavy Loads. (13 page(s), 6/25/2001)
- ML011860247 - Input From RES for TWG Report. (1 page(s), 6/25/2001)
- ML011860262 - Letter to Lochbaum expressing appreciation for letter dated 03/15/2000 regarding draft final technical study on spent fuel pool risk at decommissioning nuclear power plants. (1 page(s), 6/25/2001)
- ML011860268 - Draft Appendix 1 Thermal Hydraulics re Spent Fuel. (13 page(s), 6/25/2001)
- ML011860278 - Spent Fuel Pool Boxes, Draft Final Report said (Conclusion are based only on decay of spent fuel). (2 page(s), 6/25/2001)
- ML011860281 - Draft 3.4.1 Seismic Events on Spent Fuel Pools. (3 page(s), 6/25/2001)
- ML011860284 - Draft re insurance in accordance with 10 CFR 140 - Financial Protection Requirements and Indemnity. (2 page(s), 6/25/2001)
- ML011860288 - Draft Insert A, re: Risk Analysis. (2 page(s), 6/25/2001)
- ML011860290 - Draft Executive Summary of spent fuel pool accident risks at decommissioning plants. (3 page(s), 6/25/2001)
- ML011860302 - Draft, Introduction re Spent Fuel Pool. (4 page(s), 6/25/2001)
- ML011860303 - Items from Last Week's Meetings on TWG Report. (2 page(s), 6/25/2001)
- ML011860306 - Agenda -- Discussion on Input Needed for Revised TWR Report. (5 page(s), 6/25/2001)
- ML011860310 - What we know and can say. (2 page(s), 6/25/2001)
- ML011860319 - Staff Responses to an NEI Assertions in a White Paper on Improving Decommissioning Regulations. (4 page(s), 6/25/2001)
- ML011860322 - Handwritten notes. (2 page(s), 6/25/2001)
- ML011860324 - Handwritten notes re condition failure probability given to get annual frequency. (2 page(s), 6/25/2001)
- ML011860332 - Handwritten notes re multi-unit issue only. (1 page(s), 6/25/2001)
- ML011860339 - Response to Commissioners' Technical Assistants Questions. (3 page(s), 6/25/2001)
- ML011860346 - TWG Issue Checklist. (4 page(s), 6/25/2001)
- ML011860352 - Handwritten notes: seismic conservatism. (3 page(s), 6/25/2001)
- ML011860361 - Various types of thermal hydraulic data. (17 page(s), 6/25/2001)
- ML011860187 - Handwritten Notes: Thernmal Hydraulic Data. (11 page(s), 8/31/2000)
- ML011860189 - Orange County Response to Shearon Harris Board. (1 page(s), 6/25/2001)
- ML011860190 - Summary of Issues/Problems for Spent Fuel Decommissioning. (6 page(s), 6/25/2001)
- ML011860192 - U.S. Nuclear Regulatory Commission Information & Analyses, "Assessment of Spent Fuel Cooling." (19 page(s), 9/30/1996)
- ML011860207 - CONF-971162, Dynamic Modeling of Physical Phenomena for Probabilistic Assessment of Spent Fuel Accidents. (17 page(s), 11/21/1997)
- ML011860213 - Comments submitted by NEI on proposed rule, "Financial Protection Requirements for Permanently Shutdown Nuclear Power Reactors." (4 page(s), 1/16/1998)
- ML011860217 - E-mail from D. Barss to D. Jackson, NRR, Re: EP Rule Question-Reply. (1 page(s), 11/5/1998)
- ML011860223 - Memo from D. Matthews to S. Collins, NRR, Re: NRR Staff Response to Backfit Review Panel Findings. (6 page(s), 2/10/1999)
- ML011860188 - E-mail from D. Matthews, NRR, to G. Holahan, NRR, Re: Milestones re Decomm Rules. (2 page(s), 2/26/2001)
- ML011860191 - Outline: Risk & Safety Level at Decommissioned Plants. (9 page(s), 2/28/1999)
- ML011860196 - Outline: Introduction. (3 page(s), 3/5/1999)
- ML011860301 - Viewgraphs: Reactor Decommissioning Program Status. (12 page(s), 3/17/1999)
- ML011860330 - Memo from G. Holahan, NRR, to T. King, RES, Re: Technical Support for Spent Fuel Pool Zirconium Fire Consequence Analysis. (1 page(s), 3/26/1999)
- ML011860336 - Memo from G. Bagchi, NRR, R. Rotham, NRR, to J. Hannon, NRR, Re: Input for Working Group on Decommissioning Rule Making. (10 page(s), 5/11/1999)
- ML011860329 - Attendance List: Decommissioning Public Meeting on April 13, 1999. (4 page(s), 4/13/1999)
- ML011860333 - Viewgraphs: Exploring Risk-Informed Rulemaking for Decommissioning Plants. (13 page(s), 4/13/1999)
- ML011860347 - Viewgraphs: Risk-Informed 10CFR50 for Decommissioning Industry Thoughts on a Risk-Informed Framework. (48 page(s), 4/13/1999)
- ML011870047 - E-mail from D. Lochbaum, Union of Concerned Scientists, to R. Dudley, NRR, Re: Comments on Risk-Informed Decommissioning Regulations. (3 page(s), 4/15/1999)
- ML011870085 - Agenda for Working Group Meeting #4 on 04/29/1999. (4 page(s), 4/29/1999)
- ML011860311 - Attendance List: Decommissioning Meeting on May 5, 1999. (1 page(s), 5/5/1999)
- ML011860349 - Handwritten Notes. (3 page(s), 5/5/1999)
- ML011860354 - Viewgraphs: Decommissioning Regulatory Improvement, Presentation During Meeting with NEI. (4 page(s), 5/5/1999)
- ML011860363 - Agenda: Risk-Informing Decommissioning Rules NRC/NEI/Public Meeting on May 5, 1999. (1 page(s), 5/5/1999)
- ML011860365 - E-mail from S. Richards, NRR, to G. Hubbard, J. Hannon, NRR, Re: Forwarded Information re Earthquakes and EP. (1 page(s), 5/6/1999)
- ML011860367 - E-mail from G. Hubbard, NRR, to G. Kelly, G. Bagchi, J. O'Brien, NRR, Re: Earthquakes and EP. (1 page(s), 5/6/1999)
- ML011860369 - E-mail from P. Blanch, Energy Consultant, to NRC Concerns Re: NRC Letter on Maximum Exposure Criteria for Decommissioned Sites. (10 page(s), 5/20/1999)
- ML011860374 - E-mail from M. Cheok, NRR, to D. Jackson, G. Parry, G. Kelly, NRR, Re: RG 1.174. (1 page(s), 6/2/1999)
- ML011860378 - EDO and DEDO Briefing on the Preliminary Technical Assessment of Spent Fuel Pool Accidents for Decommissioning Plants. (21 page(s), 6/4/1999)
- ML011860386 - Agenda: Risk-Informed Decommissioning June 7, 1999 Public Meeting. (1 page(s), 6/7/1999)
- ML011860389 - Handwritten Notes Re: June 7, 1999 NEI Meeting. (4 page(s), 6/7/1999)
- ML011860394 - Viewgraphs: Stakeholders Meeting on the Preliminary Technical Results of Spent Fuel Pool Accidents for Decommissioned Plants. (20 page(s), 6/7/1999)
- ML011860398 - Viewgraphs: Meeting with Public Stakeholders on the Preliminary Technical Results of Spent Fuel Accidents for Decommissioned Plants. (20 page(s), 6/7/1999)
- ML011870094 - Viewgraphs: Decommissioning Regulatory Improvement. (6 page(s), 6/7/1999)
- ML011870108 - E-mail from R. Shadis, Public, to NRC, Re: NRC_Concerns Public Meeting Notices. (3 page(s), 7/1/1999)
- ML011870291 - TWG Plan - Phase 3 Independent Technical Quality Research Process (ITQR). (1 page(s), 7/12/1999)
- ML011870307 - Public Concerns Raised at the Decommissioning Workshop on July 15-16, 1999. (2 page(s), 7/15/1999)
- ML011870552 - Handwritten Notes Re: New England Citizen's Awareness Network. (17 page(s), 7/15/1999)
- ML011870557 - Viewgraphs: Probabilistic Risk Assessment Input to Decommissioning Requirements, NRC/Industry/Public Workshop, presented by NEI. (46 page(s), 7/15/1999)
- ML011870565 - Viewgraphs: Thermal Hydraulics of Spent Fuel Pool for Decommissioning Plants, presented by Holtec International. (25 page(s), 7/15/1999)
- ML011870566 - Viewgraphs: Workshop on Risk Related to Spent Fuel Pool Accidents at Decommissioning Plants, Credible Sequences for Long-Term Mitigation Events Discussion Session. (14 page(s), 7/15/1999)
- ML011860340 - Agenda: NRC Public Workshop on Risk-Related to Spent Fuel Pool Accidents for Decommissioning Plants. (3 page(s), 7/15/1999)
- ML011860343 - Viewgraphs: Workshop on Risk Related to Spent Fuel Pool Accidents at Decommissioning Plants, Thermal Hydraulic Discussion Session. (16 page(s), 7/16/1999)
- ML011860348 - Viewgraphs: Workshop on Risk Related to Spent Fuel Pool Accidents at Decommissioning Plants, Seismic Discussion Session. (14 page(s), 7/16/1999)
- ML011860356 - Viewgraphs: Workshop on Risk Related to Spent Fuel Accidents at Decommissioning Plants, Heavy Loads Discussion Session. (10 page(s), 7/16/1999)
- ML011860377 - Handwritten Notes: Wrap-up Session. (6 page(s), 7/16/1999)
- ML011860382 - E-mail from V. Ordaz, NRR, to B. Thomas, D. Baxley, D. Wheeler, NRR, Re: Thanks to All. (1 page(s), 7/19/2001)
- ML011860390 - E-mail from R. Dudley, NRR, to B. Thomas, D. Jackson, G. Hubbard, NRR, Re: Discussion with Jim Bell of Com McGaffigan's Office. (1 page(s), 7/30/1999)
- ML011860393 - E-mail from A. Nelson, Nuclear Energy Institute, to D. Jackson, NRR, Re: Crane Status/Loading Summary. (7 page(s), 7/30/1999)
- ML011860414 - E-mail from D. Jackson, NRR, to G. Bagchi, NRR, Re: Decommissioning Technical Working Group Schedule. NEI Seismic Checklist Embedded. (1 page(s), 8/18/1999)
- ML011860417 - E-mail from A. Nelson, Nuclear Energy Institute, to W. Huffman, NRR, Re: Decommissioning Technical Working Group Schedule. (1 page(s), 8/18/1999)
- ML011860433 - E-mail from D. Jackson, NRR, to B. Thomas, C. Poslusny, E. Throm, NRR, Re: Heavy Loads Telecom w/NEI - Decommissioning TWG. (1 page(s), 8/18/1999)
- ML011870087 - Memo from G. Holahan, NRR, to J. Craig, RES, Re: Request for Review of Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants (TAC# MA5099). (2 page(s), 8/18/1999)
- ML011870090 - E-mail from D. Jackson, NRR, to G. Holahan, G. Hubbard, J. Hannon, R. Barrett, NRR, Re: Heavy Loads Feedback to NEI. (2 page(s), 8/23/1999)
- ML011870093 - Handwritten Notes: NEI Phone Call. (2 page(s), 8/23/1999)
- ML011870097 - E-mail from D. Jackson, NRR, to B. Thomas, G. Hubbard, C. Poslusny, C. Boyd, NRR, Re: TWG Phase 3 Schedule Update. (7 page(s), 8/26/1999)
- ML011870335 - Review of NEI Comments Dated August 30, 1999. (1 page(s), 8/30/1999)
- ML011870341 - Memo from J. Zwolinski, G. Holahan, NRR, to B. Sheron, NRR, Re: Summary and Status of Ongoing Staff Efforts to Develop a Risk-Informed Technical Basis for Improving Reactor Decommissioning Regulations. (5 page(s), 9/30/1999)
- ML011870344 - E-mail from D Jackson regarding completeness of TWG effort for decommissioning rulemaking. (2 page(s), 9/7/1999)
- ML011870345 - E-mail regarding Maryland State and Local Evacuation Plans. (2 page(s), 9/7/1999)
- ML011870349 - E-mail from D Jackson regarding observations on NEI report. (4 page(s), 9/15/1999)
- ML011870353 - E-mail from D Jackson regarding HRA. (14 page(s), 9/16/1999)
- ML011870356 - Review of Draft NRC Staff Report: "Draft Technical Study of Spent Fuel Pool Accidents For Decommissioning Plants." (2 page(s), 9/21/1999)
- ML011870360 - Handwritten Notes Re: Seismic Phone Call with NEI. (1 page(s), 9/23/1999)
- ML011870031 - E-mail from G Bagchi regarding Updated TWG Schedule. (2 page(s), 9/29/1999)
- ML011870033 - Comments Concerning Seismic Screening and Seismic Risk of Spent Fuel Pools for Decommissioning Plants by R.P. Kennedy. (15 page(s), 10/30/1999)
- ML011870038 - E-mail providing comments on IRSS Study dated September 30, 1999. (3 page(s), 10/5/1999)
- ML011870040 - Background Information For Advisory Committee on Reactor Safeguards Presentation on Spent Fuel Pool Accident Risk at Decommissioning Plants. (4 page(s), 10/20/1999)
- ML011870043 - E-mail from S Richards regarding TWG Study Issues. (1 page(s), 10/25/1999)
- ML011870053 - Handwritten Notes Re:Release of Volatile Isotopes. (2 page(s), 11/30/1999)
- ML011870055 - E-mail from P Blanch regarding ACRS and Commission presentations. (11 page(s), 11/1/1999)
- ML011870058 - E-mail from S Richards regarding ACRS and Commission presentations. (1 page(s), 11/1/1999)
- ML011870062 - ACRS Briefing on Spent Fuel Pool Accident Risk for Decommissioning Plants. (20 page(s), 11/5/1999)
- ML011870074 - Public Comments/Staff Commitments, November 8, 1999 Commission Meeting. (63 page(s), 11/8/1999)
- ML011870083 - Viewgraphs: Comments and Experience with Reactor Decommissioning by D. Stewart-Smith, Oregon Office of Energy. (4 page(s), 11/8/1999)
- ML011870088 - Viewgraphs: Comments Before a Meeting of the NRC Regarding an Integrated Review of Decommissioning Requirements by R. Shadis, New England Coalition. (14 page(s), 11/8/1999)
- ML011870100 - Viewgraphs: Integrated Approach to Reactor Decommissioning Requirements. (14 page(s), 11/8/1999)
- ML011870104 - Handwritten Notes: Bill Brach comments on casksand scheduling notes. (4 page(s), 11/8/1999)
- ML011870109 - E-mail from D. Jackson to B. Sheron, G. Holahan, J. Wermiel, etc., regarding ACRS letter to Commission on TWG. (1 page(s), 11/8/1999)
- ML011870120 - Summary of Comments Before a Meeting of the NRC by R. Shadis. (3 page(s), 11/9/1999)
- ML011870130 - E-mail from P. Blanch regarding Commission Briefing on Integrated Review of Decommissioning Requirements. (6 page(s), 11/16/1999)
- ML011870135 - E-mail from D. Jackson to G. Kelly and J. Staudenmeier regarding Green Ticket: Staff Response to ACRS Letter. (1 page(s), 11/17/1999)
- ML011870166 - Handwritten Notes regarding November 12 letter w/analysis. (6 page(s), 11/19/1999)
- ML011870186 - NRC/NEI/Stakeholder Meeting on Risk From Spent Fuel Pools at Decommissioning Reactors, November 19, 1999. (6 page(s), 11/19/1999)
- ML011870195 - Handwritten and Typed Notes from Stakeholders Meeting on 11/19/99. (3 page(s), 11/19/1999)
- ML011870240 - Appendix 4, "Structural Integrity of Spent Fuel Pool Structures Subject to Tornados and High Winds." (12 page(s), 11/24/1999)
- ML011870275 - Appendix 5, "Structural Integrity of Spent Fuel Pool Structures Subject to Heavy Loads Drops." (18 page(s), 11/24/1999)
- ML011870288 - Appendix 6, "Structural Integrity of Spent Fuel Pool Structures Subject to Aircraft Crashes." (6 page(s), 11/24/1999)
- ML011870301 - Planned Alternative to High-Expansion Foam Experiment for Potential Zirconium Fires at Decommissioned Plants. (5 page(s), 11/30/1999)
- ML011870306 - Support for Spent Fuel Pool Accident Risk Assessment for Decommissioning Plants. (2 page(s), 12/3/1999)
- ML011870415 - Comments on NRC Draft Screening Criteria for Assessing Potential Seismic Vulnerabilities of Spent Fuel Pools at Decommissioning Plants - December 3, 1999, NRC Memorandum. (10 page(s), 12/13/1999)
- ML011870420 - Revision 1 to "Seismic Screening Criteria for Assessing Potential Fuel Pool Vulnerabilities at Decommissioning Plants," (8 page(s), 12/13/1999)
- ML011870425 - Draft 6, Risk Informed Decision Making. (3 page(s), 12/16/1999)
- ML011870443 - Draft 7.0, Risk Informed Decision Making. (3 page(s), 12/22/1999)
- ML011870460 - Draft Appendix 8, Design Considerations for Independent Spent Fuel Storage Installations. (4 page(s), 2/29/2000)
- ML011870481 - Draft Appendix 9, Potential Fire Protection Methods for Mitigation of a Fire. (8 page(s), 2/29/2000)
- ML011870488 - Draft Appendix 10, Spent Fuel Heatup Time Assuming Adiabatic Conditions. (8 page(s), 2/29/2000)
- ML011870499 - Draft 3.1, Fire Protection Evaluation of the Phenomena of a Zirconium Fire. (3 page(s), 3/20/2001)
- ML011900004 - Draft 5.0, Potential for Criticality. (3 page(s), 12/29/1999)
- ML011900007 - Draft 6.0, Normal Operation Considerations and Programs. (13 page(s), 3/20/2001)
- ML011900011 - E-mail from E. Ford to D. Jackson regarding Bul-94-01 and the MR. (3 page(s), 1/3/2000)
- ML011900014 - E-mail from W. Huffman to G. Hubbard regarding 94-01 Actions. (1 page(s), 1/4/2000)
- ML011900016 - Draft Formatted Version Rev. 5, Appendix 3, Criticality. (15 page(s), 2/29/2000)
- ML011900017 - E-mail from R. Kennedy to S. Pullani regarding Spent Fuel Pool Seismic Risk. (7 page(s), 9/15/2000)
- ML011900030 - E-mail from C. Gratton to G. Kelly regarding Info Request. (1 page(s), 1/25/2000)
- ML011900051 - E-mail from J. Staudenmeier to C. Gratton regarding info request from Gary. (1 page(s), 1/27/2000)
- ML011900056 - Draft Heavy Loads. (2 page(s), 2/29/2000)
- ML011900063 - Draft Appendix 2, Structural Integrity of Pool Structure, Introduction. (16 page(s), 2/29/2000)
- ML011900072 - Draft Section 3.4, Beyond Design Spent Fuel Pool Accident Scenarios. (3 page(s), 2/28/2000)
- ML011900077 - Draft Memorandum regarding Final Technical Study on Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants. (44 page(s), 2/7/2000)
- ML011900083 - Viewgraphs: Commissioner's Technical Assistants Brief on Draft Final Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants. (9 page(s), 2/10/2000)
- ML011900091 - E-Mail from W. Huffman, NRR, to Internet: CISCO, regarding Decommissioning Spent Fuel Pool Risk Study. (1 page(s), 2/17/2000)
- ML011870092 - E-Mail from S. Richards, NRR, to D. Jackson, G. Hubbard, J. Hannon, NRR, regarding Dave Lochbaum Comments on TWG Draft Report. (1 page(s), 3/15/2000)
- ML011870096 - E-Mail from S. Richards, NRR, to D. Jackson, G. Holahan, G. Hubbard, J. Hannon, J. Zwolinski, M. Masnik, Barrett, and R. Dudley, NRR, regarding UCS Comments on Spent Fuel Pool Risk. (7 page(s), 3/16/2000)
- ML011870113 - E-Mail from D. Jackson, NRR, to G. Hubbard, NRR, regarding UCS Comments on Spent Fuel Pool Risk (2 page(s), 3/16/2000)
- ML011870114 - E-mail from G. Kelly, NRR, to G. Hubbard, NRR, regarding UCS Comments on Draf Final Decommissioning Risk Assessment. (1 page(s), 3/22/2000)
- ML011870115 - E-mail from M. Cullingford, NRR, to R. Dudley, NRR, regarding EP Regulatory at Decommissioning NPP's; Exchange of Info?. (1 page(s), 3/22/2000)
- ML011870117 - E-mail from G. Hubbard, NRR, to R. Dudley, and W. Huffman, NRR, regarding: Response to Lochbaum March 15 Letter. (2 page(s), 3/27/2000)
- ML011870119 - E-mail from R. Dudley, NRR, to G. Hubbard, NRR, regarding SV: EP Regulatory Relief at Decommissioning NPP's; Exchange of Info?. (3 page(s), 3/28/2000)
- ML011870123 - Handwritten Notes regarding Instrumentations/Backups/Walkdowns. (2 page(s), 4/5/2000)
- ML011870129 - Viewgraphs: Advisory Committee on Reactor Safeguards Briefing on Draft Final Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants. (17 page(s), 4/5/2000)
- ML011870178 - Viewgraphs: Consequence Evaluation for Spent Fuel Pool Accidents, Presentation to the Advisory Committee on Reactor Safeguards. (5 page(s), 4/5/2000)
- ML011870181 - E-mail from W. Huffman, NRR, to D. Wheeler, G. Hubbard, and G. Kelly, NRR, regarding NRC Request for FEMA Assistance - Spent Fuel Accident Risk. (1 page(s), 4/10/2000)
- ML011870203 - ACRS Concerns as Summarized in a Letter from the ACRS to Chairman Meserve, dated April 13, 2000. (2 page(s), 4/13/2000)
- ML011870204 - E-mail from M. Rubin, NRR, to G. Hubbard, NRR, regarding Draft Recommendations from ACRS. (1 page(s), 4/17/2000)
- ML011870210 - E-mail from J. Hannon, NRR, to G. Hubbard and M. Rubin, NRR,regarding ACRS Letter to the Chairman on TWG Report. (2 page(s), 4/18/2000)
- ML011870215 - E-mail from R. Barrett, NRR, J. Hannon, NRR, regarding Revised ACRS Letter to the Chairman on TWG Report. (2 page(s), 4/18/2000)
- ML011870218 - E-mail from E. Throm, NRR, to G. Hubbard, NRR,regarding SFP Report. (5 page(s), 4/18/2000)
- ML011870222 - E-mail from G. Kelly, NRR, to G. Hubbard and M. Rubin, NRR, regarding My Thoughts on Issues Raised in Orange County Response to Board. (2 page(s), 4/18/2000)
- ML011870321 - E-mail from G. Bagchi, NRR, to G. Hubbard, NRR,regarding P. Atherton Fax. (4 page(s), 4/19/2000)
- ML011870323 - E-mail from M. Cheok, NRR, Re: Draft Final Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants. (1 page(s), 4/19/2000)
- ML011870329 - Typed and Handwritten Notes from Meeting on 04/19/2000 re Response to ACRS Letter. (7 page(s), 4/19/2000)
- ML011870333 - E-mail from T. Eaton, NRR, to D. Jackson, G.Hubbard, NRR, Re: ACRS Concerns on TWG Report. (3 page(s), 4/20/2000)
- ML011870342 - E-mail from G. Kelly, NRR, to G. Hubbard, M. Rubin, NRR, Re: Response to SPSB to Fax by P. J. Atherton on the Draft Final Decommissioning Risk Assessment. (4 page(s), 4/21/2000)
- ML011870347 - E-mail from D. Jackson, NRR, to G. Hubbard, T. Eaton, NRR, Re: Summary of Public Comments Received - Appendix 8. (12 page(s), 4/25/2000)
- ML011870354 - E-mail from R. Dudley, NRR, to D. Meyer, ADM, G. Hubbard, NRR, Re: Fwd: VB: Comments nr 2. to Draft Final Technical SFP Risks at De corn NPPs. (6 page(s), 4/25/2000)
- ML011870362 - E-mail from R. Dudley, NRR, to G. Hubbard, NRR, Re: Fwd: VB: Draft Final Technical Study SFP Risks at Decom NPPs. (6 page(s), 4/27/2000)
- ML011870369 - EDO Briefing on ACRS Comments on the Draft Decommissioning Report. (8 page(s), 4/28/2000)
- ML011870374 - Notes on Decommissioning SFP Risk Study. (5 page(s), 5/31/2001)
- ML011870379 - Commissioner's Technical Assistants Briefing on the ACRS Comments on the Draft Final Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants. (8 page(s), 5/4/2000)
- ML011870382 - E-mail from G. Bagchi, NRR, to J. Hannon, NRR, Re: Fwd: VB: Draft Final Technical Study SFP Risks at Decom NPPs. (1 page(s), 5/4/2000)
- ML011870337 - E-mail from G. Bagchi, NRR, to G. Hubbard, NRR, Re: GT Response to ACRS on SFP Risk for Decommissioning Plants. (2 page(s), 5/10/2000)
- ML011870346 - E-mail from G. Kelly, NRR, to C. Tinkler, C. Boyd, F. Eltawila, RES, Re: GT Response to ACRS on SFP Risk for Decommissioning Plants. (2 page(s), 5/10/2000)
- ML011870351 - E-mail from M. Rubin, NRR, to G. Hubbard, NRR, Re: First Cut ACRS Response on Decision Criteria. (1 page(s), 5/10/2000)
- ML011870359 - E-mail from M. Cheok, NRR, to G. Hubbard, NRR, Re: ACRS Response on Decision Criteria. (2 page(s), 5/11/2000)
- ML011870368 - E-mail from G. Bagchi, NRR, to C. Tinkler, C. Boyd, F. Eltawila, RES, Re: GT Response to ACRS on SFP Risk for Decommissioning Plants. (2 page(s), 5/11/2000)
- ML011870377 - E-mail from G. Parry, NRR, to D. Jackson, G. Hubbard, G. Kelly, NRR, Re: Input to Green Ticket on ACRS response. (4 page(s), 5/12/2000)
- ML011870383 - E-mail from J. Staudenmeier, NRR, to G. Hubbard, NRR, Re: Fwd: Spent Pool Accident. (1 page(s), 5/15/2000)
- ML011870390 - E-mail from L. Kopp, NRR, to G. Hubbard, NRR, Re: Loss of SFP Water. (2 page(s), 5/19/2000)
- ML011870394 - Public Comments/Staff Commitments. (13 page(s), 6/6/2000)
- ML011870398 - Note from T. Eaton, and J Lehning Re: Summary of Public Comments/Staff Commitments. (15 page(s), 6/7/2000)
- ML011870399 - Formatting of Public Comment Responses from T. Eaton, NRR. (2 page(s), 6/12/2000)
- ML011870568 - E-mail from T. Eaton, NRR, to C. Boyd, D. Barss, D. Jackson, NRR, Re: TAC Number to Respond to SFP Public Comment Assignments. (1 page(s), 6/15/2000)
- ML011870570 - E-mail from J. Lehning, NRR, to T. Eaton, NRR, Re: Fwd: Decommissioning: Responses. (2 page(s), 6/28/2000)
- ML011870571 - E-mail from G. Kelly, NRR, to G. Hubbard, M. Rubin, T. Eaton, NRR, Re: Appendix 5 to the SFP Risk Assessment. (1 page(s), 6/29/2000)
- ML011870573 - E-mail from G. Kelly, NRR, to G. Hubbard, M. Rubin, R. Barrett, NRR, Re: Implications of Joe's Findings on SFP Fire Timing. (1 page(s), 6/29/2000)
- ML011870574 - E-mail from J. Staudenmeier, NRR, to G. Hubbard, T. Collins, NRR, Re: Summary of Issues Attached re Spent Fuel Pool Decommissioning. (2 page(s), 6/29/2000)
- ML011870575 - E-mail from T. Collins, NRR, to G. Holahan, NRR, Re: Fwd: Summary of Issues Attached. (2 page(s), 6/29/2000)
- ML011870576 - E-mail from G. Bagchi, NRR, to G. Kelly, NRR, Re: Decommissioning Input for Staff Technical Report. (2 page(s), 6/30/2000)
- ML011870512 - Goutam's Report Input re SFP. (6 page(s), 6/30/2000)
- ML011870514 - Memo from C. Carpenter, NRR, to G. Hubbard, NRR, Re: Public Comments on "Draft Final Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Plants." (2 page(s), 7/1/2000)
- ML011870516 - E-mail from D Jackson, NRR to G Hubbard, NRR, Re: Scenario Boxes. (2 page(s), 7/5/2000)
- ML011870518 - E-mail from D Jackson, NRR to F Akstulewicz, G Kelly, G Hubbard, NRR, Re: Table to Summarize Timing & Probability of SFP Events. (3 page(s), 7/6/2000)
- ML011870519 - E-mail from D Jackson, NRR to F Akstulewicz, G Kelly, J Staudenmeier, NRR, Re: SFP Accident Timing & Probability Table. (3 page(s), 7/10/2000)
- ML011870522 - E-mail from G Kelly, NRR to D Jackson, F Akstulewicz, et al., NRR, Re: SFP Accident Timing & Probability Table. (2 page(s), 7/11/2000)
- ML011870525 - E-mail from G Bagchi, NRR to G Kelly, NRR Re: Revision: Seismic Risk: Spent Fuel Pool Failures at 69 Sites. (1 page(s), 7/12/2000)
- ML011870527 - E-mail from T Eaton, NRR to D Jackson, NRR re: Last Information on Public Comments. (2 page(s), 7/13/2000)
- ML011870528 - E-mail from D Jackson, NRR to G Hubbard, NRR, J Mitchell, J Murphy, RES, Re: Public Comments on Report on SFP Risk ant Decommissioning Plants. (2 page(s), 7/13/2000)
- ML011870531 - Draft Appendix 8, Public Concerns Raised During the Public Comment Period re "Draft Final Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Plants." (31 page(s), 7/14/2000)
- ML011870533 - Spent Fuel Pool Accident Consequences Tables. (6 page(s), 7/14/2000)
- ML011870535 - E-mail from S Staudenmeier, NRR to G Hubbard, NRR re: T/H Appendix. (14 page(s), 7/17/2000)
- ML011870537 - E-mail from J Staudenmeier, NRR to G Hubbard, NRR re answers to questions. (3 page(s), 7/17/2000)
- ML011870539 - July 19, 2000 Public Meeting Agenda. (1 page(s), 7/19/2000)
- ML011900005 - E-mail from M Rubin, NRR, to G Hubbard, NRR, Re: Seismic Writeup. (1 page(s), 7/19/2000)
- ML011900012 - SPSB comments, conclusions and important findings in the Technical Study are undermined by Appendix 1. (4 page(s), 7/19/2000)
- ML011900040 - E-mail from D Jackson, NRR to C Tinkler, RES, G Hubbard and G Kelly, NRR Re: White Board Notes from Meeting. (2 page(s), 7/19/2000)
- ML011900044 - Handwritten Notes Re: Status of Rulemaking, Seismic, etc. (2 page(s), 7/19/2000)
- ML011900048 - Viewgraphs: Risk Informed Decommissioning Rulemaking, etc. (8 page(s), 7/19/2000)
- ML011900055 - E-mail from R Dudley, NRR to D Jackson, D Wrona, G Hubbard, et, al., NRR Re: DLPM Responses to TWG Comments. (48 page(s), 7/21/2000)
- ML011900057 - E-mail from D Jackson, NRR to C Tinkler, G Kelly, G Hubbard, NRR Re: Partial Draindown - GSI 82. (2 page(s), 7/23/2000)
- ML011900062 - E-mail from J Hannon, NRR to G Bagchi, R Barrett, NRR and S Basu, RES, Re: Items from Last Week's Meeting on TWG Report. (1 page(s), 7/24/2000)
- ML011900067 - E-mail regarding Spent Fuel Pool Heatup Calculations. (1 page(s), 7/24/2000)
- ML011900070 - DLPM Comment Analysis (Insert all responses in Appendix 8). (10 page(s), 7/25/2000)
- ML011900071 - E-mail regarding Items from Last Week's Meetings on TWG Report. (1 page(s), 7/25/2000)
- ML011900087 - Draft Versions of Main Body Seismic Writeup. (10 page(s), 6/25/2001)
- ML011900085 - E-mail regarding Spent Fuel Pool Heatup Calculations. (2 page(s), 7/25/2000)
- ML011900088 - Draft Versions of Main Body Seismic Writeup. (13 page(s), 7/26/2000)
- ML011900092 - Draft Versions of Appendix 2b Structural Integrity of Spent Fuel Pools Subject to Seismic Loads. (12 page(s), 7/26/2000)
- ML011900097 - E-mail regarding Draft Final Technical Study of Spent Fuel Pool Accident Risk. (1 page(s), 7/28/2000)
- ML011900097 - E-mail regarding Draft Final Technical Study of Spent Fuel Pool Accident Risk. (1 page(s), 7/28/2000)
- ML011900099 - E-mail regarding Draft Final Technical Study of Spent Fuel Pool Accident Risk. (1 page(s), 7/28/2000)
- ML011900099 - E-mail regarding Draft Final Technical Study of Spent Fuel Pool Accident Risk. (1 page(s), 7/28/2000)
- ML011900101 - E-mail regarding Draft Final Technical Study of Spent Fuel Pool Accident Risk. (1 page(s), 7/28/2000)
- ML011900101 - E-mail regarding Draft Final Technical Study of Spent Fuel Pool Accident Risk. (1 page(s), 7/28/2000)
- ML011900105 - Additional Comments Concerning Seismic Screening & Seismic Risk of Spent Fuel Pools for Decommissioning Plants. (4 page(s), 8/31/2000)
- ML011900105 - Additional Comments Concerning Seismic Screening & Seismic Risk of Spent Fuel Pools for Decommissioning Plants. (4 page(s), 8/31/2000)
- ML011900106 - E-mail regarding IOLB support SPSB Comments. (1 page(s), 8/1/2000)
- ML011900106 - E-mail regarding IOLB support SPSB Comments. (1 page(s), 8/1/2000)
- ML011900107 - E-mail regarding Spent Fuel Pool Decommissioning: Seismic Screening. (1 page(s), 8/2/2000)
- ML011900107 - E-mail regarding Spent Fuel Pool Decommissioning: Seismic Screening. (1 page(s), 8/2/2000)
- ML011900110 - E-mail regarding Spent Fuel Pool Decommissioning: Seismic Screening. (1 page(s), 8/2/2000)
- ML011900110 - E-mail regarding Spent Fuel Pool Decommissioning: Seismic Screening. (1 page(s), 8/2/2000)
- ML011900008 - Decommissioning Rulemaking Status Summary & Recommended Course of Action. (2 page(s), 8/4/2000)
- ML011900009 - E-mail regarding EP History. (1 page(s), 8/8/2000)
- ML011900010 - E-mail regarding RES Activity in the Decommissioning Area. (2 page(s), 8/9/2000)
- ML011900013 - E-mail regarding Goals for TWG Report. (2 page(s), 8/9/2000)
- ML011900024 - E-mail regarding Goals for TWG Report. (1 page(s), 8/10/2000)
- ML011900033 - E-mail regarding Goals for TWG Report. (1 page(s), 8/10/2000)
- ML011900045 - E-mail regarding Siesmic Input for TWG Report: Decommissioning. (4 page(s), 8/11/2000)
- ML011900047 - E-mail regarding Risk Metrics vs Time After Shutdown. (1 page(s), 8/11/2000)
- ML011900050 - E-mail regarding Important - Distances at which Consequence Measures are Calculated. (1 page(s), 8/11/2000)
- ML011900128 - E-mail regarding Spent Fuel Pool Decommissioning: Siesmic Screening. (1 page(s), 8/14/2000)
- ML011900128 - E-mail regarding Spent Fuel Pool Decommissioning: Siesmic Screening. (1 page(s), 8/14/2000)
- ML011900136 - E-mail regarding Spent Fuel Pool Decommissioning Siesmic Screening. (2 page(s), 8/14/2000)
- ML011900136 - E-mail regarding Spent Fuel Pool Decommissioning Siesmic Screening. (2 page(s), 8/14/2000)
- ML011900141 - E-mail regarding Research Support for Decommissioning. (1 page(s), 8/14/2000)
- ML011900141 - E-mail regarding Research Support for Decommissioning. (1 page(s), 8/14/2000)
- ML011900159 - E-mail regarding Corrected G-mean with/Duke EPRI Technical Report. (31 page(s), 8/15/2000)
- ML011900159 - E-mail regarding Corrected G-mean with/Duke EPRI Technical Report. (31 page(s), 8/15/2000)
- ML011900022 - E-mail regarding Spent Fuel Pool Decommissioning: Seismic Screening. (1 page(s), 8/16/2000)
- ML011900026 - E-mail regarding Spent Fuel Pool Decommissioning: Seismic Screening. (2 page(s), 8/16/2000)
- ML011900028 - E-mail regarding some questions/comments on seismic write up. (5 page(s), 8/16/2000)
- ML011900031 - E-mail regarding Draft Agenda for meeting to evaluate bases and uses of seismic risk. (2 page(s), 8/16/2000)
- ML011900034 - E-mail regarding Consequence Calculations for Decommissioning PRA. (2 page(s), 8/17/2000)
- ML011900035 - E-mail regarding Spent Fuel Pool Decommissioning: Seismic Screening. (1 page(s), 8/17/2000)
- ML011900037 - E-mail regarding Draft Agenda for meeting to evaluate bases and use of seismic risk. (2 page(s), 8/17/2000)
- ML011900039 - E-mail regarding Draft Agenda for meeting to evaluate Bases & Uses of Seismic Risk. (2 page(s), 8/17/2000)
- ML011910324 - Appendix 6 Public Comments.wpd Last Revised During the Public Comment Period. (34 page(s), 8/18/2000)
- ML011900049 - E-mail regarding NEI Response to Our Proposed Meeting Agenda. (1 page(s), 8/18/2000)
- ML011900054 - E-mail regarding Some questions/comments on seismic write up. (5 page(s), 8/21/2000)
- ML011900058 - E-mail regarding 3.5 Cores for SFP accidents. (2 page(s), 8/21/2000)
- ML011900060 - E-mail regarding Risk Increase from EP Changes Versus RG 1.174 LERF Criterion. (5 page(s), 8/22/2000)
- ML011900064 - Agenda regarding Decommissioning Spent Fuel Pool Accident Risk Seismic. (10 page(s), 8/23/2000)
- ML011900068 - Handwritten notes regarding 08/23/2000 NEI meeting. (2 page(s), 8/23/2000)
- ML011900074 - Draft Version 6 of Various Sections 3. (29 page(s), 8/25/2000)
- ML011900082 - Suggested Changes for Section 3. (3 page(s), 8/25/2000)
- ML011900086 - E-mail regarding Assumptions in study. (3 page(s), 8/28/2000)
- ML011900098 - Version 7, Sections 3.0, 3.1 and 3.2. (42 page(s), 8/28/2000)
- ML011900098 - Version 7, Sections 3.0, 3.1 and 3.2. (42 page(s), 8/28/2000)
- ML011900090 - E-mail regarding If you like this, please pass it on to Goutam and Nielish. (2 page(s), 8/29/2000)
- ML011900095 - Handwritten notes regarding 08/30/2000 FEMA meeting. (3 page(s), 8/30/2000)
- ML011910337 - Draft TWG Report & Completion Status. (131 page(s), 8/30/2000)
- ML011900142 - Part 2 - Attachment A - Fault Trees Used in the Risk Analysis. (190 page(s), 9/5/2000)
- ML011900142 - Part 2 - Attachment A - Fault Trees Used in the Risk Analysis. (190 page(s), 9/5/2000)
- ML011900163 - E-mail regarding Question's for FEMA (and NRR). (2 page(s), 8/31/2000)
- ML011900163 - E-mail regarding Question's for FEMA (and NRR). (2 page(s), 8/31/2000)
- ML011900164 - Table regarding Dose Conversion Factors For I-131, Ru-106 and Cs-137. (1 page(s), 9/5/2000)
- ML011900164 - Table regarding Dose Conversion Factors For I-131, Ru-106 and Cs-137. (1 page(s), 9/5/2000)
- ML011900165 - E-mail regarding Questions for FEMA related to decommissioning EP rulemaking pages. (3 page(s), 9/7/2000)
- ML011900165 - E-mail regarding Questions for FEMA related to decommissioning EP rulemaking pages. (3 page(s), 9/7/2000)
- ML011900218 - E-mail regarding Early Evacution. (2 page(s), 9/7/2000)
- ML011900218 - E-mail regarding Early Evacution. (2 page(s), 9/7/2000)
- ML011900220 - E-mail regarding Dose Conversion Factors for inhalation. (2 page(s), 9/7/2000)
- ML011900220 - E-mail regarding Dose Conversion Factors for inhalation. (2 page(s), 9/7/2000)
- ML011900226 - E-mail regarding Sections 2 and 3.5 of TWG. (25 page(s), 9/13/2000)