Nuclear Power Plant Security Assessment Guide (NUREG/CR-7145)
On this page:
Download complete document
Publication Information
Manuscript Completed: April 2013
Date Published: April 2013
Prepared by:
J. Zamanali and C. Chwasz
Nuclear Systems Analysis Operations Center
Information Systems Laboratories, Inc.
Rockville, MD 20852
Prepared for:
Office of Nuclear Security and Incident Response
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001
James E. Vaughn, NRC Project Manager
NRC Job Codes N4110 and N4116
Availability Notice
Abstract
This document provides detailed guidance for the format and content of a security assessment of a commercial nuclear power plant.
The U.S. Nuclear Regulatory Commission (NRC) encourages design certification and combined license applicants to use this guidance to optimize physical security during the design phase. The expected result is a more robust security posture with less reliance on operational programs (human actions) and potentially costly retrofits. The NRC also encourages operating reactor licensees to use this guidance in planning and executing changes and upgrades of physical protection systems at existing sites.