RELAP5/MOD3.2 Validation Using BETHSY Test 6.9a (NUREG/IA-0188)
On this page:
Download complete document
Publication Information
Date Published: August 2000
Prepared by:
S. Bouabdallah
NNC Ltd.
Booths Hall
Chelford Road
Knutsford, Cheshire
GB–WA16 8QZ
UNITED KINGDOM
Prepared as part of:
The Agreement on Research Participation and Technical Exchange
under the International Code Application and Maintenance Program (CAMP)
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001
Availability Notice
Abstract
This report provides the results of a RELAP5/MOD3.2 calculation of Test 6.9a which was carried out on the BETHSY facility. The purpose of the calculation is to provide validation evidence for the use of RELAP5/MOD3.2 for application to faults at Sizewell B which can occur when the plant is in Modes 5 and 6 (and including the use of nozzle dams).
Page Last Reviewed/Updated Tuesday, March 09, 2021