Change Notice 05-020
Issue Date: 07/21/05
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| DELETED: Number | Date | TRANSMITTED: Number | Date |
1. | IMC 0609 App E | 08/14/01 | IMC 0609 App E | 07/21/05 |
2. | IMC 0609 App E Part I | ------- | IMC 0609 App E Part I | 07/21/05 |
3. | IMC 0609 App E Part II | ------- | IMC 0609 App E Part II | 07/21/05 |
TRAINING: | Training to be conducted at next security counterpart meeting. |
REMARKS: | IMC 0609 App E (Physical Protection Significance Determination Process for Power Reactors) is being revised to align the process with the current security baseline inspection procedures. IMC 0609 App E Part I (Baseline Physical Protection Significance Determination Process for Power Reactors) is being issued to align the process with the current security baseline inspection procedures. IMC 0609 App E Part II (Force-on-Force Physical Protection Significance Determination Process for Power Reactors) is being issued to align the process with the current security baseline inspection procedures. |
DISTRIBUTION: These documents have been designated as containing “Official Use Only” information and are therefore not available to the public. For information on this TI, please contact Peter Prescott, 301-415-7591.
END
Page Last Reviewed/Updated Thursday, July 02, 2015