Change Notice 01-014
Issue Date: 08/14/01
NRC INSPECTION MANUAL IIPB
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
TRAINING: | No special training requirements have been identified for any documents issued with this change notice. |
REMARKS: | IMC 0609, Appendix E (Interim Physical Protection - Significance Determination Process) has been revised to add definitions to the interim Physical Protection Significance Determination Process. The definitions are to be used in conjunction with the flow chart. The sequence of the flow chart boxes on the right side of the flow chart was also revised to make the chart more "user friendly." |
DISTRIBUTION: | Standard |
END
Page Last Reviewed/Updated Thursday, July 02, 2015