Change Notice 00-007
Issue Date: 04/21/00
NRC INSPECTION MANUAL IIPB
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| DELETED: | | TRANSMITTED: | |
| Number | Date | Number | Date |
1. | ---- | ---- | IMC 0609 | 04/21/00 |
2. | ---- | ---- | IMC 0609.01 | 04/21/00 |
3. | ---- | ---- | IMC 0609.02 | 04/21/00 |
4. | ---- | ---- | IMC 0609.03 | 04/21/00 |
5. | ---- | ---- | IMC 0609.04 | 04/21/00 |
6. | ---- | ---- | IMC 0609, App A | 04/21/00 |
7. | ---- | ---- | IMC 0609, App B | 04/21/00 |
8. | ---- | ---- | IMC 0609, App C | 04/21/00 |
9. | ---- | ---- | IMC 0609, App D | 04/21/00 |
10. | ---- | ---- | IMC 0609, App E | 04/21/00 |
11. | ---- | ---- | IMC 0609, App F | 04/21/00 |
12. | ---- | ---- | IMC 0609, App G | 04/21/00 |
13. | ---- | ---- | IMC 0609, App H | 04/21/00 |
TRAINING: | The TTC G-200 course is recommend before implementing the requirements of the manual chapter. |
REMARKS: | IMC 0609 | Significance Determination Process |
| IMC 0609.01 | Enforcement Review Panel |
| IMC 0609.02 | Initial Assessment of Inspection Observations For SDP Entry |
| IMC 0609.03 | Process For Appealing NRC Characterization of Inspection Findings (SDP Appeal Process) |
| IMC 0609.04 | Senior Reactor Analyst Support Objectives |
| IMC 0609, App A | Significance Determination of Reactor Inspection Findings for At-Power Situations |
| IMC 0609, App B | Emergency Preparedness Significance Determination Process |
| IMC 0609, App C | Occupational Radiation Safety Significance Determination Process |
| IMC 0609, App D | Public Radiation Safety Significance Determination Process |
| IMC 0609, App E | Physical Protection Significance Determination Process |
| IMC 0609, App F | Fire Protection Significance Determination Process |
| IMC 0609, App G | Shutdown Operations Significance Determination Process |
| IMC 0609, App H | Containment Integrity Significance Determination Process |
| This manual chapter supports the New Reactor Oversight Program for the significance determination of findings. The significance determination process detailed in the manual chapter is designed to characterize the significance of inspection findings for the NRC licensee performance assessment process using risk insights as appropriate. |
DISTRIBUTION: | STANDARD |
END
Page Last Reviewed/Updated Thursday, July 02, 2015