Change Notice 99-005
Issue Date: 04/05/99
NRC INSPECTION MANUAL IIPB
|
DELETED: |
|
TRANSMITTED: |
|
|
Number |
Date |
Number |
Date |
1. |
IP 87110 |
02/03/97 |
IP 87110 |
04/05/99 |
2. |
IP 87110, App A |
02/03/97 |
IP 87110, App A |
04/05/99 |
3. |
---- |
---- |
IP 87110, App B |
04/05/99 |
4. |
IP 93808 |
09/06/95 |
---- |
---- |
5. |
TI 2515/065 |
07/30/93 |
---- |
---- |
6. |
TI 2515/103 |
12/18/89 |
---- |
---- |
7. |
TI 2515/113 |
11/18/91 |
---- |
---- |
TRAINING: |
No special training requirements have been identified for any documents issued with this change notice. |
REMARKS: |
IP 87110 |
(Industrial/Academic/Research Programs) |
|
IP 87110, Appendix A |
(Industrial/Academic/Research Inspection Record) |
|
IP 87110, Appendix B |
(Industrial/Academic/Research Inspection References) |
|
The inspection procedure has been revised to reflect a performance based inspection approach. This revision also changes the format, eliminates the field notes, adds an inspection record section, and adds a references section. |
|
IP 93808 |
(Integrated Performance Assessment Process) is deleted. The assessment processes described by this IP are no longer required. |
|
TI 2515/065 |
(TMI Action Plan Requirement Followup) is deleted. The inspection requirements identified in this TI have been completed. |
|
TI 2515/103 |
(Loss of Decay Heat Removal (Generic Letter No. 88-17) 10 CFR 50.54(f) Programmed Enhancements (Long Term Review)) is deleted. The inspection requirements for this TI have been completed. |
|
TI 2515/113 |
(Reliable Decay Heat Removal During Outages) is deleted. The inspection requirements identified in this TI have been completed. |
|
DISTRIBUTION: |
Standard |
END