Generic Letters - 1990

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
GL-90-09 Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions -- 12/11/1990 --
GL-90-08 Simulation Facility Exemptions -- 08/10/1990 --
GL-90-07 Operator Licensing National Examination Schedule W 81 FR 31969
05/20/2016
--
  08/10/1990
GL-90-06 Resolution of Generic Issues 70, "PORV and Block Valve Reliability," and 94, "Additional Ltop Protection for PWRs" -- 06/25/1990 --
GL-90-05 Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 Piping -- 06/15/1990 --
GL-90-04 Request for Information on the Status of Licensee Implementation of GSIs Resolved with Imposition of Requirements or CAs -- 04/25/1990 --
GL-90-03 Relaxation of Staff Position in Generic Letter 83-28, Item 2.2 Part 2, "Vendor Interface for Safety-Related Components" S1 05/14/1990 --
-- 03/20/1990 --
GL-90-02 Alternative Requirements for Fuel Assemblies in the Design Features Section of Technical Specifications S1 07/31/1992 --
-- 02/01/1990 --
GL-90-01 Request for Voluntary Participation in NRC Regulatory Impact Survey -- 01/18/1990 --