Power Reactor Status Report for February 4, 2016

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100     *  
Beaver Valley 2 0 02/03/2016 MAINTENANCE OUTAGE *  
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 100     *  
FitzPatrick 100     *  
Ginna 100        
Hope Creek 1 98   REDUCED POWER FOR PLANNED MAINTENANCE *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100   COASTDOWN TO REFUELING OUTAGE    
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   100 MVAR RESTRICTION DUE TO TURBINE BEARING VIBRATIONS    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 98   COASTDOWN TO REFUELING OUTAGE *  
Susquehanna 2 100     *  
Three Mile Island 1 100     *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 74   COASTDOWN TO REFUELING OUTAGE    
Brunswick 1 89   COASTDOWN TO REFUELING OUTAGE    
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 86   COASTDOWN TO REFUELING OUTAGE    
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 0 12/26/2015 FORCED OUTAGE - UNIT OFF LINE FOR A GENERATOR INSPECTION AND REPAIR    
Sequoyah 2 16   REDUCED POWER FOR MAINTENANCE *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 0        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 99   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 95   HOLDING POWER TO ADJUST BORON AND CONTROL ROD POSITION *  
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
La Salle 1 93   COASTDOWN TO REFUELING OUTAGE *  
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 96   HOLDING POWER *  
Point Beach 1 100     *  
Point Beach 2 100     *  
Prairie Island 1 100        
Prairie Island 2 0 12/17/2015 FORCED OUTAGE - TG REPAIRS    
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 98   COASTDOWN TO REFUELING OUTAGE    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 78   INCREASING POWER *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021