Power Reactor Status Report for October 14, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 25   INCREASING POWER *  
Beaver Valley 2 100        
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 100     *  
FitzPatrick 54   B RECIRC PUMP MG SET TRIP *  
Ginna 100        
Hope Creek 1 100     *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 0 10/11/2014 REFUELING OUTAGE    
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 20   HOLDING POWER - PREPARING TO SYNC TO THE GRID *  
Peach Bottom 2 87   COASTDOWN TO REFUELING OUTAGE *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100   SINGLE DOWN POWER CONTINGENCY IN PLACE FOR A TRANSMISSION LINE OUT OF SERVICE *  
Susquehanna 1 100     *  
Susquehanna 2 100     *  
Three Mile Island 1 100     *  
Vermont Yankee 93   COASTDOWN TO OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 10/03/2014 REFUELING OUTAGE    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 91   CONTROL ROD PATTERN ADJUSTMENT INCREASING POWER *  
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 82   COASTDOWN TO REFUELING OUTAGE *  
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 0 09/12/2014 REFUELING OUTAGE    
McGuire 2 100        
North Anna 1 100        
North Anna 2 97   INCREASING POWER *  
Oconee 1 100        
Oconee 2 0 10/13/2014 MAINTENANCE OUTAGE *  
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 0 10/13/2014 SEE EN #50529 * 1
Turkey Point 3 100        
Turkey Point 4 0 09/21/2014 REFUELING OUTAGE *  
Vogtle 1 100        
Vogtle 2 25   HOLDING POWER - PREPARING TO SYNC TO THE GRID *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 92   REDUCED POWER FOR PLANNED MAINTENANCE *  
Braidwood 2 100        
Byron 1 100     *  
Byron 2 0 09/28/2014 REFUELING OUTAGE *  
Clinton 98   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/23/2014 REFUELING OUTAGE    
D.C. Cook 2 100        
Davis-Besse 100     *  
Dresden 2 100        
Dresden 3 89   COASTDOWN TO REFUELING OUTAGE    
Duane Arnold 0 10/03/2014 REFUELING OUTAGE    
Fermi 2 65   REACTOR FEEDPUMP REPAIRS *  
La Salle 1 0 10/11/2014 FORCED OUTAGE-MSIV REPAIRS    
La Salle 2 100        
Monticello 31   REPAIR CIRC WATER PUMP    
Palisades 100        
Perry 1 100        
Point Beach 1 0 10/03/2014 DEFUELED *  
Point Beach 2 100        
Prairie Island 1 0 10/07/2014 REFUELING OUTAGE    
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 0 10/11/2014 REFUELING OUTAGE    
Columbia Generating Station 100        
Comanche Peak 1 0 10/04/2014 REFUELING OUTAGE    
Comanche Peak 2 100        
Cooper 0 09/27/2014 REFUELING OUTAGE    
Diablo Canyon 1 100        
Diablo Canyon 2 0 10/04/2014 REFUELING OUTAGE    
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 0 10/10/2014 REFUELING OUTAGE    
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 93   FEEDWATER REGULATING VALVE REPAIR *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.