Power Reactor Status Report for May 26, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100     *  
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ACTION *  
FitzPatrick 100        
Ginna 48   CHEMISTRY HOLD *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100     *  
Millstone 2 0 05/25/2014 AUTOMATIC REACTOR TRIP ON LOSS OF OFFSITE POWER. SEE EN #50142. * 1
Millstone 3 0 05/25/2014 AUTOMATIC REACTOR TRIP ON LOSS OF OFFSITE POWER. SEE EN #50141. * 1
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 0 04/12/2014 REFUELING OUTAGE    
Seabrook 1 100        
Susquehanna 1 0 04/12/2014 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION *  
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION    
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 0 05/06/2014 REFUELING OUTAGE    
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 05/11/2014 REFUELING OUTAGE    
Summer 0 04/04/2014 REFUELING OUTAGE *  
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 0 05/25/2014 AUTOMATIC REACTOR TRIP ON TURBINE TRIP DUE TO LOSS OF CONDENSER VACUUM. SEE EN #50140. * 1
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 79   INCREASING POWER *  
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 100     *  
Dresden 3 100        
Duane Arnold 93   INCREASING POWER FOLLOWING LOAD LINE ADJUSTMENT *  
Fermi 2 100        
La Salle 1 100        
La Salle 2 100     *  
Monticello 88   ENGINEERING HOLD FOR EPU TESTING    
Palisades 100        
Perry 1 95   HOLDING POWER WHILE RESOLVING FW HEATER ISSUES    
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 72   HOLDING POWER FOR GRID STABILIZATION    
Arkansas Nuclear 2 0 04/27/2014 REFUELING OUTAGE    
Callaway 100        
Columbia Generating Station 65   REDUCED POWER FOR ECONOMIC DISPATCH    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 12   PLANT STARTUP HOLDING FOR TESTING *  
South Texas 2 100        
Waterford 3 98   INCREASING POWER *  
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021