Power Reactor Status Report for April 30, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 04/18/2014 DEFUELED    
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 100     *  
FitzPatrick 100        
Ginna 0 04/27/2014 REFUELING OUTAGE    
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100   138 KV LINE OOS DUE TO MAINTENANCE *  
Limerick 1 100        
Limerick 2 6   NOT SYNCED TO THE GRID *  
Millstone 2 0 04/05/2014 DEFUELED    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 66   INCREASING POWER PER THE POWER PROFILE *  
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 0 04/12/2014 REFUELING OUTAGE    
Seabrook 1 100     *  
Susquehanna 1 0 04/12/2014 REFUELING OUTAGE *  
Susquehanna 2 100     *  
Three Mile Island 1 100     *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 99   INCREASING POWER TO 100% *  
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 0 04/14/2014 DEFUELED    
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100     *  
Sequoyah 2 84   COASTDOWN TO REFUELING OUTAGE *  
Summer 0 04/04/2014 DEFUELED    
Surry 1 100        
Surry 2 0 04/20/2014 REFUELING OUTAGE    
Turkey Point 3 84   INCREASING POWER *  
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 0 03/23/2014 REFUELING OUTAGE    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 97   DECREASED POWER FOR STEAM GENERATOR SAFETY VALVE TESTING *  
Byron 1 100        
Byron 2 100     *  
Clinton 98   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100     *  
D.C. Cook 2 100     *  
Davis-Besse 0 01/31/2014 REFUELING OUTAGE *  
Dresden 2 100     *  
Dresden 3 100        
Duane Arnold 100        
Fermi 2 94   HOLDING POWER FOR POWER UPRATE TESTING *  
La Salle 1 100        
La Salle 2 0 04/27/2014 MAINTENANCE OUTAGE    
Monticello 89   ENGINEERING HOLD FOR EPU TESTING *  
Palisades 100        
Perry 1 100     *  
Point Beach 1 0 04/28/2014 MAINTENANCE OUTAGE - CONTAINMENT DOME TRUSS REPAIRS    
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 0 03/31/2014 REFUELING OUTAGE    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 69   INCREASING POWER *  
Arkansas Nuclear 2 0 04/27/2014 AUTOMATIC REACTOR TRIP DUE TO AUXILIARY TRIP ON CORE PROTECTION CALCULATOR - SEE EN #50063    
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100     *  
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 78   HOLDING FOR HEATER DRAIN PUMP MAINTENANCE *  
Palo Verde 1 100        
Palo Verde 2 0 04/04/2014 REFUELING OUTAGE    
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 0 03/15/2014 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 0 04/12/2014 DEFUELED    
Wolf Creek 1 0 03/07/2014 MAINTENANCE OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.