Power Reactor Status Report for March 13, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100   COLD WEATHER ALERT IN EFFECT FROM 0600-1500 HOURS *  
Beaver Valley 2 100   COLD WEATHER ALERT IN EFFECT FROM 0600-1500 HOURS *  
Calvert Cliffs 1 0 02/16/2014 REFUELING OUTAGE - PRPEPARATIONS FOR STARTUP IN PROGRESS *  
Calvert Cliffs 2 100        
FitzPatrick 98   INCREASING POWER TO 100% - COMPLETED CONDENSER TUBE LEAK REPAIR - 115KV LIGHTHOUSE HILL #3 LINE UNAVAILABLE (1 OF 2 OFFSITE POWER LINE) *  
Ginna 100        
Hope Creek 1 100        
Indian Point 2 0 02/23/2014 REFUELING OUTAGE LINE 95891 OOS FOR SCHEDULED MAINTENANCE *  
Indian Point 3 100   LINES 96952 AND 95951 ARE RESTRICTED DUE TO UNIT 2 OUTAGE BECAUSE LINE 95891 OOS FOR SCHEDULED MAINTENANCE.    
Limerick 1 0 03/04/2014 REFUELING OUTAGE    
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100   115KV LINE #4 UNAVAILABLE DUE TO GRID MAINTENANCE *  
Nine Mile Point 2 16   HOLDING POWER - GENERATOR OFFLINE - TROUBLESHOOTING TURBINE TRIP THAT OCCURRED ON 3/12/14. *  
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100   JUMPERS INSTALLED AROUND MAIN GENERATOR DISCONNECT    
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 99   OPERATION LIMITED BY GENERATOR CAPABILITY CURVE    
Susquehanna 2 0 03/01/2014 MAINTENANCE OUTAGE - PLANNED TURBINE MAINTENANCE    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 0 02/14/2014 REFUELING OUTAGE *  
Brunswick 1 0 02/28/2014 REFUELING OUTAGE    
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 99   REDUCED POWER AFTER INSTRUMENTATION SHOWED TURBINE BYPASS VALVE OPENING *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 03/07/2014 FORCED OUTAGE - SHUTDOWN FOR SG TUBE REPAIRS *  
Saint Lucie 1 100        
Saint Lucie 2 0 03/02/2014 DEFUELED *  
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 97   COASTDOWN TO REFUELING OUTAGE    
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 0 03/09/2014 REFUELING OUTAGE    
Byron 2 100        
Clinton 86   GENERATOR DISPATCH REQUEST    
D.C. Cook 1 100   COLD WEATHER ALERT *  
D.C. Cook 2 100   COLD WEATHER ALERT *  
Davis-Besse 0 01/31/2014 REFUELING OUTAGE - COLD WEATHER ALERT IN EFFECT ON 3/13    
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 02/10/2014 REFUELING OUTAGE    
La Salle 1 100   COLD WEATHER ALERT *  
La Salle 2 100   COLD WEATHER ALERT *  
Monticello 93   ENGINEERING HOLD FOR EPU TESTING    
Palisades 0 01/19/2014 REFUELING OUTAGE    
Perry 1 100   COLD WEATHER ALERT *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 83   COASTDOWN TO REFUELING OUTAGE - REDUCED POWER TO SUPPORT OFFSITE TRANSFORMER WORK *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 74   INCREASING POWER *  
Diablo Canyon 1 1   STARTUP-LOW POWER PHYSICS TESTING *  
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 0 02/09/2014 REFUELING OUTAGE    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 03/07/2014 MID CYCLE PLANNED MAINTENANCE OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.