Power Reactor Status Report for January 10, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 01/06/2014 RPS ACTUATION SEE EN #49697    
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100   TWO RESTRICTED 138KV FEEDERS 95331 AND 95332 WITH LINE 33332L OOS *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100     *  
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 99   GENERATOR CURVE LIMITED *  
Susquehanna 2 99   GENERATOR CURVE LIMITED    
Three Mile Island 1 100        
Vermont Yankee 100     *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 99   MAX RECIRC FLOW *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 95   COASTDOWN TO REFUELING OUTAGE    
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 01/09/2014 EN #49708 REACTOR TRIP DUE TO TURBINE TRIP *  
Saint Lucie 1 100        
Saint Lucie 2 94   LOSS OF ONE ISO PHASE BUS DUCT COOLER FAN *  
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100   . .    
Braidwood 2 100   . .    
Byron 1 100        
Byron 2 100        
Clinton 98   100% ELECTRICAL CAPABILITY;    
D.C. Cook 1 100   .    
D.C. Cook 2 100   .    
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
La Salle 1 99   COASTDOWN TO REFUELING OUTAGE    
La Salle 2 100        
Monticello 91   HOLDING FOR POWER UPRATE TESTING    
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 76   INCREASING POWER *  
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 0 12/09/2013 COMPLETED TESTING OF MSIV'S *  
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 95   REDUCED POWER FOR PLANNED MAINTENANCE RAMPING DOWN TO 50% POWER TO CLEAR SALT WATER TUNNEL PLUGGING. *  
Fort Calhoun 0 01/09/2014 FORCED OUTAGE TRANSITIONING TO MODE 4 *  
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021