Power Reactor Status Report for October 15, 2011

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 0 10/11/2011 REACTOR TRIP - SEE EN#47338    
Hope Creek 1 100   HIGH SYSTEM VOLTAGE ACTION    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 0 10/08/2011 REFUELING OUTAGE    
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 17   TURBINE ROLLING; EXPECT SYNC AT 0800 EDT *  
Pilgrim 1 100        
Salem 1 100   HIGH SYSTEM VOLTAGE WARNING *  
Salem 2 100   HIGH SYSTEM VOLTAGE WARNING *  
Seabrook 1 0 10/06/2011 AUTOMATIC REACTOR TRIP-SEE EN #47327    
Susquehanna 1 100   HIGH SYSTEM VOLTAGE ACTION    
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION    
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION    
Vermont Yankee 0 10/08/2011 REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   YELLOW GRID - TRINITY 161 KV LINE OOS *  
Browns Ferry 2 100   YELLOW GRID - TRINITY 161 KV LINE OOS *  
Browns Ferry 3 84   ROD PATERN ADJUSTMENTS; YELLOW GRID - TRINITY 161 KV LINE OOS *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 60   REPAIRED CONDENSER TUBE LEAK; INCREASING POWER *  
Crystal River 3 0 09/25/2009 DEFUELED; CONTAINMENT TENSIONING ON HOLD    
Farley 1 100        
Farley 2 0 10/09/2011 REFUELING OUTAGE    
Harris 1 100        
Hatch 1 100        
Hatch 2 91   POWER LIMIT DUE TO SRV LEAKAGE    
McGuire 1 12   STARTING TO ROLL TURBINE *  
McGuire 2 100        
North Anna 1 0 08/23/2011 FORCED OUTAGE - HIGH SYSTEM VOLTAGE ACTION    
North Anna 2 0 08/23/2011 REFUELING OUTAGE - HIGH SYSTEM VOLTAGE ACTION    
Oconee 1 100        
Oconee 2 97   COASTDOWN TO REFUELING OUTAGE *  
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 86   MONITORING CHEMISTRY; ONE WATER BOX OUT OF SERVICE *  
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100     *  
Surry 2 100     *  
Turkey Point 3 0 10/03/2011 MAINTENANCE OUTAGE COMPLETED; HEATING UP *  
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 80   STABLE FOR NI CALIBRATIONS *  
Watts Bar 1 29   CHEMISTRY HOLD *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 99   FEEDWATER INSTRUMENT FLOW UNCERTAINTY    
Byron 2 99     *  
Clinton 97   100% ELECTRICAL OUTPUT    
D.C. Cook 1 0 09/21/2011 REFUELING OUTAGE    
D.C. Cook 2 100        
Davis-Besse 0 09/30/2011 MAINTENANCE OUTAGE DEFUELED    
Dresden 2 99   COASTDOWN TO REFUELING OUTAGE    
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 0 10/02/2011 FORCED OUTAGE - TECH SPEC REQUIRED SHUTDOWN - SEE EN #47312    
Point Beach 1 0 10/02/2011 REFUELING OUTAGE    
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 10/04/2011 MAINTENANCE OUTAGE - RX COOLANT PUMP SEAL FAILURE    
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 80   COASTDOWN TO REFUELING OUTAGE *  
Arkansas Nuclear 2 100        
Callaway 7   SHUTTING DOWN FOR REFUELING OUTAGE *  
Columbia Generating Station 100   ONE COOLING TOWER OUT OF SERVICE    
Comanche Peak 1 0 10/01/2011 REFUELING OUTAGE    
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE    
Grand Gulf 1 96   2ND STAGE MSR LIMITED TO 96% POWER    
Palo Verde 1 0 10/07/2011 REFUELING OUTAGE    
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 100        
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021