Power Reactor Status Report for June 15, 2010

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100     *  
Susquehanna 1 100        
Susquehanna 2 94   100% ELECTRICAL CAPABILITY    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 90   HOLD FOR CONDENSATE PUMP REPAIRS *  
Browns Ferry 3 100        
Brunswick 1 100   AT 1000 LEVEL ZERO SYSTEM RELIABILITY ALERT *  
Brunswick 2 100   AT 1000 LEVEL ZERO SYSTEM RELIABILITY ALERT *  
Catawba 1 100        
Catawba 2 100     *  
Crystal River 3 0 09/25/2009 DEFUELED    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 9   INCREASING POWER - TURBINE-GENERATOR OFFLINE *  
McGuire 2 100        
North Anna 1 98   100% ELECTRICAL CAPABILITY    
North Anna 2 98   FEEDFLOW TESTING *  
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 03/28/2010 CORE RELOAD IS COMPLETE    
Saint Lucie 1 30   HOLDING FOR CHEMISTRY *  
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 0 02/27/2010 REFUELING OUTAGE COMMENCING A SECONDARY PLANT STARTUP *  
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 1   PLANT STARTUP IN PROGRESS TENTATIVE AGREEMENT REACHED ON THE STRIKE *  
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 97   HOLDING FOR NI CALIBRATION AND DELTA-T CALCULATIONS *  
Columbia Generating Station 69   INCREASING POWER *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100   ONE ACCESS ROAD FLOODED BUT NO AFFECT ON PLANT *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100   NO AFFECT OF LOCAL FLOODING ON THE PLANT *  
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 100   EARTHQUAKE FELT IN CONTROL ROOM BUT NO AFFECT ON PLANT *  
San Onofre 3 100   EARTHQUAKE FELT IN CONTROL ROOM BUT NO AFFECT ON PLANT *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021