Power Reactor Status Report for October 3, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 1   STARTUP IN PROGRESS *  
Hope Creek 1 100        
Indian Point 2 100   138KV LINE 33332 L&M OOS    
Indian Point 3 100   138KV LINE 33332 L&M OOS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 0 09/13/2009 REFUELING OUTAGE    
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 0 09/30/2009 REFUELING OUTAGE *  
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 80   DOWNPOWER FOR WATERBOX CLEANING *  
Three Mile Island 1 100   HIGH GRID VOLTAGE WARNING *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   161 KV OFFSITE LINE OOS    
Browns Ferry 2 0 09/29/2009 RX SUBCRITICAL; 161 KV OFFSITE LINE OOS *  
Browns Ferry 3 100   161 KV OFFSITE LINE OOS    
Brunswick 1 93   DECREASING POWER FOR C.R. PATTERN ADJUSTMENT *  
Brunswick 2 90   INCREASING POWER    
Catawba 1 88   TURBINE CONTROL VALVE TESTING IN PROGRESS *  
Catawba 2 100        
Crystal River 3 0 09/25/2009 REFUELING OUTAGE *  
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 50   DOWNPOWER TO TROUBLESHOOT "B" FEEDPUMP WHICH IS OOS *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/05/2009 REFUELING OUTAGE    
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 0 10/02/2009 REACTOR TRIP SEE EN# 45404 *  
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 0 09/20/2009 REFUELING OUTAGE - DEFUELED    
Vogtle 2 100        
Watts Bar 1 0 09/20/2009 REFUELING OUTAGE - DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 0 09/13/2009 REFUELING OUTAGE *  
Byron 2 100        
Clinton 1   STARTUP IN PROGRESS *  
D.C. Cook 1 0 03/02/2009 FORCED OUTAGE    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 99   100% ELECTRICAL CAPABILITY *  
Duane Arnold 100        
Fermi 2 0 09/30/2009 FORCED OUTAGE *  
Kewaunee 0 09/25/2009 REFUELING OUTAGE    
La Salle 1 100        
La Salle 2 100        
Monticello 52   INCREASING POWER TO 100% - ROD PATTERN ADJUST SCHEDULED FOR SUNDAY, 10/04. *  
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 0 09/11/2009 REFUELING OUTAGE - CORE RELOAD IN PROGRESS *  
Prairie Island 2 100   CONTINGENCIES IN PLACE FOR BORIC ACID INTEGRATOR PROBLEM    
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 14   HOLDING POWER - GENERATOR OFFLINE *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 09/25/2009 REFUELING OUTAGE    
Diablo Canyon 1 100        
Diablo Canyon 2 100   UNIT WILL ENTER RFO ON 10/4 *  
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 99   REDUCED POWER IN PREPARATION FOR MTC TESTING SCHEDULED FOR MONDAY, 10/04. *  
Palo Verde 2 0 10/02/2009 REFUELING OUTAGE *  
Palo Verde 3 100        
River Bend 1 0 09/20/2009 REFUELING OUTAGE    
San Onofre 2 0 09/26/2009 REFUELING OUTAGE    
San Onofre 3 100        
South Texas 1 0 09/30/2009 REFUELING OUTAGE *  
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021