Power Reactor Status Report for December 12, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Beaver Valley 1 | 100 | | | | |
Beaver Valley 2 | 100 | | | | |
Calvert Cliffs 1 | 100 | | | | |
Calvert Cliffs 2 | 100 | | | | |
FitzPatrick | 100 | | | | |
Ginna | 100 | | | | |
Hope Creek 1 | 100 | | | | |
Indian Point 2 | 100 | | | | |
Indian Point 3 | 100 | | | | |
Limerick 1 | 100 | | | | |
Limerick 2 | 100 | | | | |
Millstone 2 | 100 | | MINIMUM GENERATION GRID WARNING TODAY (12/12/08 FROM 0200 TO 0600). | * | |
Millstone 3 | 100 | | MINIMUM GENERATION GRID WARNING TODAY (12/12/08 FROM 0200 TO 0600). | * | |
Nine Mile Point 1 | 100 | | | | |
Nine Mile Point 2 | 100 | | | | |
Oyster Creek | 96 | | HOLDING AT REDUCED POWER FOR TURBINE VALVE TESTING. | * | |
Peach Bottom 2 | 100 | | SWITCHYARD 500KV LINE #5007 OUTAGE SCHEDULED FOR 12/1 THRU 12/19 - NO IMPACT ON ELECTRICAL REQUIREMENTS FOR SITE | | |
Peach Bottom 3 | 100 | | SWITCHYARD 500KV LINE #5007 OUTAGE SCHEDULED FOR 12/1 THRU 12/19 - NO IMPACT ON ELECTRICAL REQUIREMENTS FOR SITE | | |
Pilgrim 1 | 100 | | OFFSITE GRID ABNORMAL CONDITION ALERT DUE TO LINE ICING | * | |
Salem 1 | 100 | | | | |
Salem 2 | 100 | | | | |
Seabrook 1 | 100 | | OFFSITE GRID ABNORMAL CONDITION ALERT DUE TO LINE ICING. NOTIFIED BY NEW ENGLAND ISO TO IMPLEMENT CONTINGENCY FOR REDUCING POWER TO LESS THAN 800 MWE, IF NECESSARY, DUE TO SCHEDULED LINE OUTAGE FROM 12/1 TO 12/15. | * | |
Susquehanna 1 | 94 | | 100% ELECTRICAL CAPABILITY | | |
Susquehanna 2 | 100 | | | | |
Three Mile Island 1 | 100 | | | | |
Vermont Yankee | 82 | | OFFSITE GRID ABNORMAL CONDITION ALERT DUE TO LINE ICING RESULTING IN REDUCED POWER. | * | |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Browns Ferry 1 | 100 | | #1 COOLING TOWER TRANSFORMER OOS | * | |
Browns Ferry 2 | 100 | | #1 COOLING TOWER TRANSFORMER OOS | | |
Browns Ferry 3 | 100 | | #1 COOLING TOWER TRANSFORMER OOS | | |
Brunswick 1 | 100 | | | | |
Brunswick 2 | 99 | | ROD SHUFFLE | * | |
Catawba 1 | 100 | | | | |
Catawba 2 | 100 | | | | |
Crystal River 3 | 100 | | | | |
Farley 1 | 100 | | | | |
Farley 2 | 100 | | | | |
Harris 1 | 100 | | | | |
Hatch 1 | 100 | | | | |
Hatch 2 | 100 | | | | |
McGuire 1 | 100 | | | | |
McGuire 2 | 100 | | | | |
North Anna 1 | 100 | | | | |
North Anna 2 | 100 | | | | |
Oconee 1 | 100 | | | | |
Oconee 2 | 19 | | ROLLING TURBINE - GENERATOR TESTING TO FOLLOW | * | |
Oconee 3 | 100 | | | | |
Robinson 2 | 100 | | | | |
Saint Lucie 1 | 100 | | | | |
Saint Lucie 2 | 100 | | | | |
Sequoyah 1 | 100 | | | | |
Sequoyah 2 | 100 | | | | |
Summer | 100 | | | | |
Surry 1 | 100 | | | | |
Surry 2 | 100 | | | | |
Turkey Point 3 | 100 | | | | |
Turkey Point 4 | 100 | | | | |
Vogtle 1 | 100 | | | | |
Vogtle 2 | 100 | | | | |
Watts Bar 1 | 100 | | | | |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Braidwood 1 | 100 | | | | |
Braidwood 2 | 100 | | | | |
Byron 1 | 100 | | | | |
Byron 2 | 100 | | | | |
Clinton | 80 | | HOLDING FOR MAINTENANCE ON 345 KV TRANSMISSION LINE #4571 | | |
D.C. Cook 1 | 0 | 09/20/2008 | SEE EN #44507. | | |
D.C. Cook 2 | 100 | | | | |
Davis-Besse | 100 | | | | |
Dresden 2 | 98 | | 100% ELECTRICAL CAPABILITY | | |
Dresden 3 | 99 | | 100% ELECTRICAL CAPABILITY | * | |
Duane Arnold | 95 | | COASTDOWN TO REFUELING OUTAGE | | |
Fermi 2 | 100 | | | * | |
Kewaunee | 100 | | | | |
La Salle 1 | 100 | | | | |
La Salle 2 | 98 | | CORE FLOW LIMITED; HOLDING FOR ROD SEQUENCE EXCHANGE ON 12/14/08 THEN UPPOWER TO 100% | | |
Monticello | 100 | | | | |
Palisades | 100 | | | | |
Perry 1 | 100 | | | | |
Point Beach 1 | 100 | | | | |
Point Beach 2 | 100 | | | | |
Prairie Island 1 | 100 | | | | |
Prairie Island 2 | 100 | | | * | |
Quad Cities 1 | 97 | | 100% ELECTRICAL CAPABILITY | | |
Quad Cities 2 | 95 | | HP FEED HEATER | * | |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Arkansas Nuclear 1 | 11 | | POWER ASCENSION | * | |
Arkansas Nuclear 2 | 100 | | | | |
Callaway | 0 | 12/11/2008 | TRIP - SEE EN #44714. | * | 1 |
Columbia Generating Station | 100 | | | | |
Comanche Peak 1 | 100 | | | | |
Comanche Peak 2 | 100 | | | | |
Cooper | 100 | | | | |
Diablo Canyon 1 | 100 | | | | |
Diablo Canyon 2 | 100 | | | | |
Fort Calhoun | 100 | | | * | |
Grand Gulf 1 | 100 | | 115KV PORT GIBSON LINE OOS | * | |
Palo Verde 1 | 99 | | STEAM GENERATOR BLOWDOWNS | * | |
Palo Verde 2 | 0 | 11/21/2008 | GENERATOR REPAIRS COMPLETE; REASSEMBLY ONGOING | * | |
Palo Verde 3 | 100 | | | | |
River Bend 1 | 100 | | | | |
San Onofre 2 | 99 | | STEAM GENERATOR LIMITATIONS | * | |
San Onofre 3 | 0 | 10/12/2008 | EXITING REFUELING OUTAGE | | |
South Texas 1 | 100 | | | | |
South Texas 2 | 100 | | | | |
Waterford 3 | 100 | | | | |
Wolf Creek 1 | 100 | | | | |
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
Page Last Reviewed/Updated Thursday, March 25, 2021