Power Reactor Status Report for April 19, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 04/14/2008 REFUELING OUTAGE    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 99   COASTDOWN TO REFUELING OUTAGE *  
Hope Creek 1 100   500 KV LINE #5021 OOS    
Indian Point 2 0 03/23/2008 EXITING REFUELING OUTAGE. *  
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 04/05/2008 DEFUELED    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 88   INCREASING POWER *  
Oyster Creek 92   HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM AND FEEDWATER HEATER ISSUES *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100   500 KV LINE OOS FOR MAINTENANCE    
Salem 2 0 03/11/2008 DEFUELED - 500 KV LINE OOS FOR MAINTENANCE    
Seabrook 1 0 03/31/2008 345 KV (BUS 2) OOS    
Susquehanna 1 65   HOLDING POWER FOR TESTING *  
Susquehanna 2 100   VOLTAGE REGULATOR IN MANUAL    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 0 03/18/2008 REFUELING OUTAGE    
Brunswick 1 0 03/14/2008 REFUELING OUTAGE    
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 88   ROD PATTERN ADJUSTMENT *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 58   INCREASING POWER *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 04/11/2008 REFUELING OUTAGE    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 92   COASTDOWN TO REFUELING OUTAGE    
Summer 99   INCREASING POWER *  
Surry 1 0 04/16/2008 MAINTENANCE OUTAGE - SHUTDOWN TO REPAIR FEEDWATER HEATER    
Surry 2 98   COASTDOWN TO REFUELING *  
Turkey Point 3 100        
Turkey Point 4 0 03/30/2008 DEFUELED    
Vogtle 1 0 03/15/2008 REFUELING OUTAGE    
Vogtle 2 98   100% ELECTRICAL CAPABILITY.    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 89   COASTDOWN TO REFUELING OUTAGE *  
Byron 1 89   HOLDING POWER FOR PRECONDITIONING *  
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 0 03/25/2008 REFUELING OUTAGE - UNUSUAL EVENT DECLARED (2) FOR SEISMIC ACTIVITY - SEE EVENT # 44147 *  
D.C. Cook 2 100   UNUSUAL EVENT DECLARED (2) FOR SEISMIC ACTIVITY - SEE EVENT # 44147 *  
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 98   100% ELECTRICAL CAPABILITY *  
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 0 03/28/2008 DEFUELED    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100   UNUSUAL EVENT DECLARED FOR SEISMIC ACTIVITY - SEE EVENT # 44148 *  
Perry 1 100        
Point Beach 1 100   GRID VOLTAGE IS EXPECTED TO DIP WHEN KEWAUNEE ENERGIZES NEW TRANSFORMER ON 04/19 *  
Point Beach 2 0 04/05/2008 REFUELING OUTAGE - TRANSFORMERS 2X03 & 2X04 OOS - GRID VOLTAGE IS EXPECTED TO DIP WHEN KEWAUNEE ENERGIZES NEW TRANSFORMER ON 04/19 *  
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 97   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 1   LOW POWER PHYSICS TESTING IN PROGRESS - REACTOR CRITICAL IN THE INTERMEDIATE RANGE *  
Cooper 0 04/11/2008 REFUELING OUTAGE    
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 03/28/2008 DEFUELED    
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99        
San Onofre 3 0 04/16/2008 PLANNED SHUTDOWN IN ORDER TO CONSERVE FUEL FOR SUMMER LOADS - WILL MAINTAIN UNIT IN MODE 3 (HOT STANDBY)    
South Texas 1 0 03/29/2008 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 03/17/2008 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021