Power Reactor Status Report for March 7, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 0 02/22/2008 REFUELING OUTAGE    
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 0 02/29/2008 REFUELING OUTAGE    
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 90   PERFORM TURBINE VALVE TESTING *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100     *  
Salem 2 87   COASTDOWN TO REFUELING OUTAGE *  
Seabrook 1 100        
Susquehanna 1 0 03/03/2008 REFUELING OUTAGE *  
Susquehanna 2 100   VOLTAGE REGULATOR IN MANUAL    
Three Mile Island 1 100     *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   500 KV UNION LINE OOS    
Browns Ferry 2 100   500 KV UNION LINE OOS    
Browns Ferry 3 98   500 KV UNION LINE OOS COASTDOWN TO REFUELING OUTAGE    
Brunswick 1 93   COASTDOWN TO REFUELING OUTAGE    
Brunswick 2 62   INCREASING POWER *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 03/01/2008 SCHEDULED REPAIR TO RCP SEAL    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 0 02/03/2008 REFUELING OUTAGE    
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 03/01/2008 REFUELING OUTAGE    
North Anna 1 100        
North Anna 2 100        
Oconee 1 73   1A RCP SHUT DOWN    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100     *  
Sequoyah 2 100     *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 95   COASTDOWN TO REFUELING OUTAGE - 100% ELECTRICAL CAPABILITY - TG VOLTAGE REGULATOR IN MANUAL *  
Vogtle 2 98   100% ELECTRICAL CAPABILITY    
Watts Bar 1 0 02/10/2008 DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY *  
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY *  
Fermi 2 100   BROWNSTOWN-WAYNE 2 LINE (1 OF 3) OOS THRU 3/7    
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100   345KV PALISADES-COOK #1 LINE (BACKFEED) AND 345KV PALISADES-COOK #2 (1 OF 6 REDUNDANT) LINES OOS SVC FOR MAINTENANCE UNTIL 3/8    
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 0 02/12/2008 REFUELING OUTAGE *  
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL OUTPUT    
Quad Cities 2 0 03/02/2008 REFUELING OUTAGE    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100   SYSTEM STATUS RED DUE TO HIGH DEMAND (PRICING) *  
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 94   COASTDOWN TO REFUELING OUTAGE    
Diablo Canyon 1 100   MORRO-DIABLO 230 KV LINE (1 OF 4) OOS THRU 3/12    
Diablo Canyon 2 0 02/03/2008 DEFUELED    
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 1   STARTUP IN PROGRESS - REACTOR SUBCRITICAL IN THE SRM RANGE *  
San Onofre 2 99        
San Onofre 3 100        
South Texas 1 97   COASTDOWN TO REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021