Power Reactor Status Report for May 9, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100   SWITCHYARD WORK    
Calvert Cliffs 2 100   SWITCHYARD WORK    
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100   MAINTENANCE ON FEEDER 95331    
Indian Point 3 100   MAINTENANCE ON FEEDER 95331    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100   SWITCHYARD WORK    
Millstone 3 0 04/07/2007 REFUELING OUTAGE AND SWITCHYARD WORK *  
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 0 04/06/2007 REFUELING OUTAGE *  
Salem 1 91   INCREASING POWER *  
Salem 2 100        
Seabrook 1 100   SWITCHYARD BREAKER 169 OOS UNTIL 23MAY07 *  
Susquehanna 1 100   MIN. GEN. ALERT *  
Susquehanna 2 100   MIN. GEN. ALERT *  
Three Mile Island 1 100   MIN. GEN. ALERT *  
Vermont Yankee 96   COASTDOWN TO REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 MAINTENANCE OUTAGE    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100     *  
Farley 2 0 04/09/2007 REFUELING OUTAGE *  
Harris 1 100        
Hatch 1 100     *  
Hatch 2 100        
McGuire 1 0 03/10/2007 REFUELING OUTAGE. LICENSEE WILL CHANGE MODE BACK TO MODE 4 BECAUSE OF A LEAK IN THE FW SYSTEM AND A STUCK CONTROL ROD (H8) AT 126 STEPS. *  
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 0 04/27/2007 DEFUELED    
Oconee 3 100        
Robinson 2 0 04/06/2007 REFUELING OUTAGE    
Saint Lucie 1 0 04/01/2007 REFUELING OUTAGE    
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 98   100% ELECTRICAL CAPABILITY.    
Vogtle 2 99   INCREASING POWER *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 85   HOLDING FOR FUEL CONDITIONING *  
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 44   INCREASING POWER *  
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY *  
Fermi 2 100        
Kewaunee 100        
La Salle 1 100     *  
La Salle 2 100        
Monticello 100        
Palisades 0 05/08/2007 SEE EN #43351, RX TRIP *  
Perry 1 0 04/01/2007 REFUELING OUTAGE    
Point Beach 1 93   INCREASING POWER *  
Point Beach 2 100        
Prairie Island 1 55   LICENSEE PLANS TO COME OFF-LINE ON THUR. 10MAY07 TO REPAIR FW. PUMP    
Prairie Island 2 100        
Quad Cities 1 0 05/04/2007 REFUELING OUTAGE    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 05/01/2007 REFUELING OUTAGE    
Arkansas Nuclear 2 100        
Callaway 8   HOLDING POWER FOR TROUBLESHOOTING ON TURBINE *  
Columbia Generating Station 90   COASTDOWN TO REFUELING OUTAGE    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 0 04/30/2007 REFUELING OUTAGE, MAIN TRANSFORMER WORK *  
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 86   INCREASING POWER, SWITCHYARD RELAY WORK *  
San Onofre 2 99   100% ELECTRICAL CAPABILITY    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021