Power Reactor Status Report for May 2, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100   SWITCHYARD BREAKER #552-21 MAINTENANCE    
Calvert Cliffs 2 100   SWITCHYARD BREAKER #552-21 MAINTENANCE    
FitzPatrick 100        
Ginna 100   34.5 KV CKT 767 MAINTENANCE *  
Hope Creek 1 100        
Indian Point 2 100     *  
Indian Point 3 65   TROUBLESHOOTING MAIN GENERATOR VOLTAGE REGULATOR PLANT SHUTDOWN EXPECTED TO BEGIN AT 08:00 *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 100   SYSTEM WIDE VOLTAGE REDUCTION TEST SOMETIME TODAY *  
Millstone 3 0 04/07/2007 DEFUELED    
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 0 04/28/2007 SHUTDOWN FOR A & C RECIRC PUMP SEAL REPLACEMENT.    
Peach Bottom 2 100   220 KV LINE 220-08 OOS    
Peach Bottom 3 100   220 KV LINE 220-08 OOS    
Pilgrim 1 0 04/06/2007 REFUELING OUTAGE    
Salem 1 0 04/30/2007 REACTOR TRIP DUE TO GRASS INTRUSION INTO CIRCULATING WATER INTAKE STRUCTURE. SEE EN# 43329.    
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 97   COASTDOWN TO REFUELING OUTAGE *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 MAINTENANCE OUTAGE 500KV BUS 2 SECTION 1 & 2 OUT OF SERVICE *  
Browns Ferry 2 100   500KV BUS 2 SECTION 1 & 2 OUT OF SERVICE. *  
Browns Ferry 3 100   500KV BUS 2 SECTION 1 & 2 OUT OF SERVICE *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 0 04/09/2007 RELOADING FUEL    
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 0 03/10/2007 REFUELING OUTAGE    
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 0 04/27/2007 REFUELING OUTAGE *  
Oconee 3 100        
Robinson 2 0 04/06/2007 REFUELING OUTAGE *  
Saint Lucie 1 0 04/01/2007 REFUELING OUTAGE *  
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 93   HOLDING POWER FOR FW BOOSTER PUMP MAINT *  
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 98   100% ELECTRICAL CAPABILITY.    
Vogtle 2 2   HOLDING POWER FOR SECONDARY WARMUP *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 0 04/01/2007 EXITING REFUELING OUTAGE *  
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 99   100% ELECTRICAL CAPABILITY *  
Dresden 3 100   100% ELECTRICAL CAPABILITY *  
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 40   HOLDING FOR TESTING    
Palisades 100        
Perry 1 0 04/01/2007 REFUELING OUTAGE    
Point Beach 1 0 03/31/2007 EXITING REFUELING OUTAGE *  
Point Beach 2 100        
Prairie Island 1 56   FEED WATER PUMP REPAIRS 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY    
Prairie Island 2 100   345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY.    
Quad Cities 1 77   COASTDOWN TO REFUELING OUTAGE *  
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 05/01/2007 REFUELING OUTAGE *  
Arkansas Nuclear 2 100     *  
Callaway 0 04/01/2007 EXITING REFUELING OUTAGE    
Columbia Generating Station 93   COASTDOWN TO REFUELING OUTAGE    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 0 04/30/2007 REFUELING OUTAGE *  
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 11   INCREASING POWER *  
River Bend 1 100        
San Onofre 2 99   100% ELECTRICAL CAPABILITY    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100     *  
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.