Power Reactor Status Report for December 9, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100     *  
Indian Point 3 100     *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 93   FLUX SHAPING AND CONDENSER BAY MAINTENANCE *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100   GENERATOR VOLTAGE REGULATOR IN MANUAL    
Susquehanna 2 100        
Three Mile Island 1 100     *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100   1 OF 2 161 KV LINES OOS AND 1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE    
Browns Ferry 3 15   1 OF 2 161 KV LINES OOS AND 1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE. DRYWELL LEAK INSPECTION AND 3 "B" RECIRC RBCC MAINTENANCE *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 0 11/10/2006 DEFUELED    
Catawba 2 64   MAIN FEED PUMP REPAIR *  
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 10/06/2006 COMING OUT OF REFUELING OUTAGE - HEATUP IN PROGRESS *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 11/26/2006 LOADING FUEL *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 0 10/30/2006 REACTOR CRITICAL AT 0425 12/9/06 *  
Vogtle 1 100   100% ELECTRICAL CAPABILITY *  
Vogtle 2 100        
Watts Bar 1 85   HOLDING FOR FUEL PRECONDITIONING *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100   MAINTENANCE ON 69 KV OFFSITE SUPPLY LINE *  
D.C. Cook 2 100   MAINTENANCE ON 69 KV OFFSITE SUPPLY LINE *  
Davis-Besse 100        
Dresden 2 97   100% ELECTRICAL CAPABILITY    
Dresden 3 67   ROD PATTERN ADJUSTMENT *  
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 99        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 11/14/2006 REFUELING OUTAGE    
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 95   100% ELECTRICAL CAPABILITY *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100   SWITCHYARD MAINTENANCE UNTIL 12/9    
Columbia Generating Station 100        
Comanche Peak 1 100     *  
Comanche Peak 2 100     *  
Cooper 100        
Diablo Canyon 1 100   MAINTENANCE ON 500 KV OUTPUT BREAKER *  
Diablo Canyon 2 100   MAINTENANCE ON 500 KV OUTPUT BREAKER *  
Fort Calhoun 70   HOLDING POWER WHILE TROUBLESHOOTING RPS TRIP UNIT    
Grand Gulf 1 100        
Palo Verde 1 99   REDUCED FOR S/G BLOWDOWNS *  
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99   STEAM GENERATOR TUBE PLUGGING LIMITATION    
San Onofre 3 0 10/16/2006 PREPARING FOR STARTUP *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 0 11/25/2006 REFUELING OUTAGE    
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021