Power Reactor Status Report for November 10, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 10/01/2006 STARTUP PREPARATIONS IN PROGRESS *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100   SOLAR ACTIVITY WARNING UNTIL 1100 EST *  
Ginna 91   HOLDING FOR FW REG VALVE TUNING    
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100   ALTERNATE ELECTRICAL CONFIG WITH PLANNED OUTAGE OF #20 BUS    
Limerick 2 100   ALTERNATE ELECTRICAL CONFIG WITH PLANNED OUTAGE OF #20 BUS    
Millstone 2 0 10/06/2006 STARTUP PREPARATIONS IN PROGRESS *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 0 10/15/2006 REFUELING OUTAGE    
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 17   PREPARING TO CONTINUE STARTUP *  
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100   2 (500 KV) OF 7 OFFSITE LINES OOS.    
Browns Ferry 3 100   2 (500 KV) OF 7 OFFSITE LINES OOS.    
Brunswick 1 100        
Brunswick 2 0 11/01/2006 STARTUP PREPARATIONS IN PROGRESS *  
Catawba 1 95   HOLDING PRIOR TO BEGINNING SHUTDOWN TO ENTER REFUELING OUTAGE LATER IN THE DAY *  
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 2   STARTUP IN PROGRESS *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 10/06/2006 DEFUELED    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 97   COASTDOWN TO REFUELING OUTAGE *  
Summer 0 10/13/2006 REFUELING OUTAGE *  
Surry 1 100        
Surry 2 0 10/07/2006 STARTUP PREPARATIONS IN PROGRESS    
Turkey Point 3 100        
Turkey Point 4 0 10/30/2006 DEFUELED    
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 0 09/10/2006 DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 99   HOLDING POWER FOR CLAD RELAXATION *  
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/15/2006 STARTUP IN PROGRESS - REACTOR IS CRITICAL *  
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 85   83% ELECTRICAL CAPABILITY - HOLDING POWER DUE TO DAMAGED FEEDWATER HEATER *  
Dresden 3 0 11/03/2006 REFUELING OUTAGE    
Duane Arnold 19   INCREASING POWER *  
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 98   FEEDWATER HEATER MAINTENANCE - MAINTENANCE ON ONE OFFSITE POWER FEED TO SAFETY BUSES. *  
Perry 1 100        
Point Beach 1 100        
Point Beach 2 0 10/15/2006 STARTUP PREPARATIONS IN PROGRESS    
Prairie Island 1 100        
Prairie Island 2 100     *  
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 42   HOLDING POWER FOLLOWING TRIP OF THE "A" MFP - TROUBLESHOOTING/REPAIRS IN PROGRESS *  
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100     *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 10/20/2006 REFUELING OUTAGE - GRID STATUS YELLOW DUE TO 1 LOOP OF S/D COOLING UNAVAILABLE - RING BUS FEEDER WORK COMPLETED *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 09/09/2006 DEFUELED    
Grand Gulf 1 100   SCHEDULED 500KV FRANKLIN TO BRASWELL LINE OUTAGE TIL 11/12 *  
Palo Verde 1 99   REDUCED POWER FOR SG HIGH RATE BLOWDOWNS *  
Palo Verde 2 0 09/29/2006 STARTUP PREPARATIONS IN PROGRESS *  
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99   STEAM GENERATOR TUBE PLUGGING LIMITATION    
San Onofre 3 0 10/16/2006 DEFUELED    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 4   STARTUP IN PROGRESS *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.