Power Reactor Status Report for May 27, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 05/26/2006 SHUTDOWN FOR SSPS TRAIN "A" DECLARED INOP. RESTART IN PROGRESS. SEE EVENT # 42606. *  
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 92   INCREASING POWER *  
Indian Point 3 100        
Limerick 1 100        
Limerick 2 62   ROD SCRAM TIME TESTING IN PROGRESS *  
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100     *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100     *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100     *  
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 0 05/19/2006 MAINTENANCE OUTAGE *  
Catawba 1 0 05/20/2006 RX TRIP DUE TO LOSS OF OFFSITE POWER. SEE EVENT #42592    
Catawba 2 16   INCREASING POWER *  
Crystal River 3 100        
Farley 1 70   HOLDING POWER LEVEL FOR NUCLEAR INSTRUMENT CALIBRATIONS *  
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 75   GOING TO 65% POWER FOR ROD SEQUENCE EXCHANGE *  
McGuire 1 100        
McGuire 2 100     *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 0 04/29/2006 REFUELING OUTAGE    
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 0 04/23/2006 REFUELING OUTAGE *  
Sequoyah 1 100        
Sequoyah 2 100        
Summer 75   REDUCED POWER FOR MAIN FEEDWATER PUMP AND MAIN FEEDWATER BOOSTER PUMP WORK *  
Surry 1 30   HOLDING POWER FOR FLUX MAPPING AND STEAM GENERATOR WATER CHEMISTRY CONTROL *  
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 30   PLANNED MAINTENANCE ON DRYWELL FLOOR DRAIN *  
Dresden 3 100     *  
Duane Arnold 96   100% ELECTRICAL CAPABILITY    
Fermi 2 0 05/20/2006 TORQUING DRYWELL HEAD *  
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 86   TESTING STEAM DUMP AND HEAT EXCHANGER CLEANING *  
Point Beach 2 100        
Prairie Island 1 0 04/28/2006 COMING OUT OF REFUELING OUTAGE *  
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 95   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 0 05/17/2006 REPAIRS TO DAMAGED HP TURBINE    
Columbia Generating Station 65   LOAD DISPATCHER DOWNPOWER REQUEST *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 96   INCREASING POWER *  
Diablo Canyon 1 100        
Diablo Canyon 2 28   PLATEAU HOLDING TESTING FW SYSTEM *  
Fort Calhoun 100        
Grand Gulf 1 0 05/22/2006 PLANNED OUTAGE DUE TO LEAKING FUEL    
Palo Verde 1 0 03/17/2006 MAINTENANCE OUTAGE - DEFUELED    
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99   S/G PLUGGING LIMITED    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021