Power Reactor Status Report for November 11, 2002

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 0 11/08/2002 Cold Shutdown
MAINTENANCE OUTAGE
   
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 0 10/25/2002 Refueling
REFUELING OUTAGE-CORE RELOAD IN PROGRESS
*  
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 97     *  
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 Refueling
DEFUELED
   
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 94   Power Operation
100% ELECTRICAL CAPABILITY
   
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100     *  
CRYSTAL RIVER 3 100     *  
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100   Power Operation
UE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.5FT.
   
NORTH ANNA 2 0 09/07/2002 Refueling
UE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.5FT REFUELING OUTAGE - DEFUELED
   
OCONEE 1 100        
OCONEE 2 0 10/11/2002 Refueling
REFUELING OUTAGE - COMPLETED REFUELING
   
OCONEE 3 100        
ROBINSON 2 0 10/11/2002 Hot Standby
REFUELING OUTAGE - COMPLETED REFUELING
*  
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 0 10/05/2002 Hot Standby
REFUELING OUTAGE - COMPLETED REFUELING
*  
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 92   Power Operation
100% ELECTRICAL CAPABILITY
*  
COOK 1 65   Power Operation
REDUCING POWER LEVEL TO 30% FOR PLANNED MAINTENANCE
*  
COOK 2 100        
DAVIS BESSE 1 0 02/15/2002 Refueling
REFUELING OUTAGE - DEFUELED
   
DRESDEN 2 96   Power Operation
100% ELECTRICAL CAPABILITY
   
DRESDEN 3 97     *  
DUANE ARNOLD 1 93   Power Operation
100% ELECTRICAL CAPABILITY
   
FERMI 2 100        
KEWAUNEE 1 100        
LASALLE 1 100        
LASALLE 2 98     *  
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 95   Power Operation
COASTING DOWN FOR REFUELING
*  
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 0 11/05/2002 Refueling
REFUELING OUTAGE
   
QUAD CITIES 2 97        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 0 10/05/2002 Hot Standby
REFUELING OUTAGE
*  
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 0 10/22/2002 Refueling
REFUELING OUTAGE
   
COLUMBIA GENERATING 100     *  
COMANCHE PEAK 1 1   Startup
PHYSICS TESTING IN PROGRESS
*  
COMANCHE PEAK 2 100        
COOPER 1 43   Power Operation
HOLDING POWER LEVEL FOR MAINTENANCE
*  
DIABLO CANYON 1 0 10/20/2002 Cold Shutdown
SCHEDULED MAINTENANCE OUTAGE
*  
DIABLO CANYON 2 30   Power Operation
HOLDING POWER FOR NI CALIBRATION
*  
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 0 11/10/2002 Hot Standby
REACTOR TRIP. SEE EVENT # 39361
* 1
PALO VERDE 2 98   Power Operation
TEMPERATURE LIMITED
   
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 0 10/01/2002 Refueling
REFUELING OUTAGE - DEFUELED
   
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021