Power Reactor Status Report for April 3, 2002

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 63   REDUCED POWER FOR FEEDWATER PUMP MAINTENANCE *  
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 0 02/15/2002 REFUELING OUTAGE - DEFUELED    
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 0 03/18/2002 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS *  
HOPE CREEK 1 100        
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 30   INCREASING POWER *  
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 0 03/15/2002 REFUELING OUTAGE - SECOND PHASE OF FUEL SHUFFLE IN PROGRESS. *  
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 0 03/02/2002 REFUELING OUTAGE    
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 91   HOLDING AT THIS POWER LEVEL *  

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 0 03/26/2002 REFUELING OUTAGE    
BRUNSWICK 1 85   INCREASING POWER *  
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 0 03/23/2002 REFUELING OUTAGE - FIRST PHASE OF FUEL OFFLOAD COMPLETE    
HATCH 2 100   ALERT DECLARED ON 4/2/02 AT 1040 EST DUE TO LOSS OF ALARM ANNUNCIATORS. EVENT WAS TERMINATED AT 1237 EST. SEE EVENT # 38823. *  
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 0 03/23/2002 REFUELING OUTAGE - DEFUELED    
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 97   COASTDOWN TO REFUELING OUTAGE *  
SUMMER 1 100        
SURRY 1 100        
SURRY 2 0 03/24/2002 REFUELING OUTAGE - DEFUELED    
TURKEY POINT 3 100        
TURKEY POINT 4 0 03/23/2002 REFUELING OUTAGE - CORE LOADING COMPLETE    
VOGTLE 1 0 03/06/2002 REFUELING OUTAGE - CORE LOADING COMPLETE    
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 96   100% ELECTRICAL CAPABILITY    
BYRON 1 100        
BYRON 2 100   MEASURED STEAM GENERATOR TUBE LEAKAGE LESS THAN 5 GPD    
CLINTON 1 0 04/01/2002 SHUTTING DOWN FOR REFUELING OUTAGE *  
COOK 1 100        
COOK 2 100        
DAVIS BESSE 1 0 02/15/2002 REFUELING OUTAGE - REFUELED    
DRESDEN 2 95   100% ELECTRICAL CAPABILITY    
DRESDEN 3 100        
DUANE ARNOLD 1 94   100% ELECTRICAL CAPABILITY *  
FERMI 2 54   HOLDING POWER AT THIS LEVEL IN SINGLE LOOP OPERATIONS DUE TO A RECIRC PUMP MG SET TRIP    
KEWAUNEE 1 100        
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 20   HOLDING POWER LEVEL FOR MAINTENANCE *  

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 0 03/30/2002 REFUELING OUTAGE    
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 98        
GRAND GULF 1 100        
PALO VERDE 1 99        
PALO VERDE 2 0 03/15/2002 REFUELING OUTAGE - DEFUELED    
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 0 03/22/2002 REFUELING OUTAGE-FUEL SHUFFLE IN PROGRESS    
WOLF CREEK 1 0 03/23/2002 REFUELING OUTAGE - DEFUELED    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021