Power Reactor Status Report for October 29, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 77   INCREASING POWER *  
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 0 10/07/2000 REFUELING OUTAGE    
GINNA 1 99        
HOPE CREEK 1 100        
INDIAN POINT 2 0 02/15/2000 DEFUELED    
INDIAN POINT 3 100     *  
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 20   WILL SHUTDOWN TO REPAIR FLOW CONTROL VALVE *  
OYSTER CREEK 1 0 10/13/2000 REFUELING OUTAGE    
PEACH BOTTOM 2 100     *  
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 0 10/05/2000 REFUELING OUTAGE - CORE RELOAD COMPLETED    
SEABROOK 1 0 10/20/2000 ENTERING REFUELING OUTAGE    
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 0 10/14/2000 REFUELING OUTAGE - DEFUELED    
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 0 09/29/2000 EXITING REFUELING OUTAGE    
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100   .    
SEQUOYAH 1 0 10/06/2000 FORCED MAINTENANCE OUTAGE - REDUCED INVENTORY    
SEQUOYAH 2 0 10/22/2000 REFUELING OUTAGE *  
SUMMER 1 0 10/07/2000 REFUELING OUTAGE - DEFUELED    
SURRY 1 100        
SURRY 2 0 09/30/2000 EXITING REFUELING OUTAGE *  
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 0 10/20/2000 REFUELING OUTAGE - CORE RELOAD COMPLETE *  
BYRON 1 100        
BYRON 2 100        
CLINTON 1 0 10/14/2000 REFUELING OUTAGE    
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 100        
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 99     *  
FERMI 2 100        
KEWAUNEE 1 96   MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES    
LASALLE 1 100        
LASALLE 2 95   COASTDOWN TO REFUELING OUTAGE    
MONTICELLO 1 100        
PALISADES 1 52   REDUCED POWER FOR CONDENSER MAINTENANCE *  
PERRY 1 75   CONTROL ROD ACCUMULATOR MAINTENANCE AND SCRAM TIME TESTING *  
POINT BEACH 1 73   STARTUP TESTING *  
POINT BEACH 2 0 10/13/2000 REFUELING OUTAGE - DEFUELED    
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 0 10/14/2000 REFUELING OUTAGE    
QUAD CITIES 2 95   HOLDING POWER AT THIS LEVEL DUE TO A TURBINE CONTROL VALVE # 3 OSCILLATION.    

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 0 09/15/2000 REFUELING OUTAGE - DEFUELED    
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 0 09/30/2000 EXITING REFUELING OUTAGE *  
COOPER 1 100        
DIABLO CANYON 1 0 10/08/2000 REFUELING OUTAGE - CORE RELOAD COMPLETED    
DIABLO CANYON 2 100        
FT CALHOUN 1 0 10/14/2000 MAINTENANCE OUTAGE *  
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 0 10/03/2000 REFUELING OUTAGE *  
PALO VERDE 3 100     *  
RIVER BEND 1 100        
SAN ONOFRE 2 0 10/07/2000 REFUELING OUTAGE    
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 0 10/14/2000 REFUELING OUTAGE - DEFUELED    
WNP-2 97     *  
WOLF CREEK 1 0 09/29/2000 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021