Power Reactor Status Report for March 14, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100     *  
BEAVER VALLEY 2 0 02/26/1999 REFUELING OUTAGE - DEFUELED    
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 0 03/12/1999 ENTERING REFUELING OUTAGE *  
FITZPATRICK 1 100        
GINNA 1 0 03/01/1999 REFUELING OUTAGE - DEFUELED    
HOPE CREEK 1 0 02/12/1999 REFUELING OUTAGE - DEFUELED    
INDIAN POINT 2 93   INCREASING POWER FOLLOWING A LOAD REDUCTION TO 70% POWER TO REPLACE A FIRST *  
INDIAN POINT 3 56   HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT A MAIN FEEDWATER PUMP *  
LIMERICK 1 100        
LIMERICK 2 94   COASTDOWN TO REFUELING OUTAGE    
MILLSTONE 2 0 02/20/1996 REFUELING OUTAGE    
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 77   HOLDING POWER AT THIS LEVEL FOR REACTOR FEEDWATER PUMP TESTING FOLLOWING A P *  
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 0 03/12/1999 ENTERING REFUELING OUTAGE *  
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 94   COASTDOWN TO REFUELING OUTAGE    
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 99   COASTDOWN TO REFUELING OUTAGE *  
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 0 03/12/1999 MAINTENANCE OUTAGE DUE TO AN AUTOMATIC REACTOR TRIP/TURBINE TRIP FROM 100% P *
HATCH 1 0 03/01/1999 REFUELING OUTAGE - INSPECTING FUEL PRIOR TO PERFORMANCE OF A FUEL SHUFFLE *  
HATCH 2 98   MAXIMUM OPERATING POWER *  
MCGUIRE 1 100        
MCGUIRE 2 0 03/12/1999 ENTERING REFUELING OUTAGE *  
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 81   COASTDOWN TO REFUELING OUTAGE *  
SUMMER 1 100        
SURRY 1 100        
SURRY 2 87   COASTDOWN TO REFUELING OUTAGE *  
TURKEY POINT 3 100        
TURKEY POINT 4 50   COASTDOWN TO REFUELING OUTAGE - HOLDING POWER AT THIS LEVEL TO PERFORM SECON *  
VOGTLE 1 0 02/27/1999 REFUELING OUTAGE - FUEL RELOAD IN PROGRESS *  
VOGTLE 2 100        
WATTS BAR 1 0 02/27/1999 REFUELING OUTAGE - DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 90   HOLDING POWER AT THIS LEVEL TO PERFORM SECONDARY MAINTENANCE *  
BYRON 1 100        
BYRON 2 100        
CLINTON 1 0 09/06/1996 REFUELING OUTAGE    
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 30   HOLDING POWER AT THIS LEVEL TO PERFORM PLANNED RECIRCULATION PUMP MAINTENANC *  
DRESDEN 3 99   MAXIMUM OPERATING POWER *  
DUANE ARNOLD 1 57   INCREASING POWER FOLLOWING A REDUCTION TO APPROXIMATELY 50% - PERFORMING A R *  
FERMI 2 97   POWER LIMITED DUE TO POWER UPRATE ISSUES    
KEWAUNEE 1 97   POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING    
LASALLE 1 100        
LASALLE 2 0 09/20/1996 REFUELING OUTAGE - DEFUELED    
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 83   INCREASING POWER FOLLOWING A REDUCTION TO 81.8% TO PERFORM ROD EXERCISING - *  
POINT BEACH 1 79   HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING *  
POINT BEACH 2 100     *  
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100     *  
COOPER 1 100        
DIABLO CANYON 1 0 02/07/1999 EXITING REFUELING OUTAGE - PERFORMING LOW POWER PHYSICS TESTING - PLAN TO PL *  
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 76   INCREASING POWER AFTER RECOVERING FROM A REACTOR TRIP FROM 100% DUE TO CLOSU *  
PALO VERDE 2 100        
PALO VERDE 3 100        
RIVER BEND 1 81   POWER SUPPRESSED DUE TO FUEL LEAKERS    
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 91   COASTDOWN TO REFUELING OUTAGE    
SOUTH TEXAS 2 100        
WASHINGTON NUCLEAR 2 65   LOAD FOLLOWING    
WATERFORD 3 0 02/19/1999 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS *  
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021