October 2, 2002
JAFP-02-0195
United States Nuclear Regulatory Commission
Attn: Document Control Desk
Mail Station P1-137
Washington, D.C. 20555
Subject: James A. FitzPatrick Nuclear Power Plant Docket No.50-333
10 CFR Part 21 Notification EC-1 Overcurrent Sensors Failed Prematurely
Dear Sir:
This report is being submitted in accordance with IOCFR2I.21(d) to address a reportable defect. The defect deals with EC-1 overcurrent sensors for a safety related circuit breaker. The defect was discovered after two overcurrent sensors withdrawn from warehouse stock failed during bench testing in preparation for installation in the plant during the upcoming refueling outage. The failure mode was premature tripping of the magnetic (instantaneous) element of the device, such that the associated circuit breaker would have tripped early and the corresponding loads would not have remained energized to perform their required safety function.
The only application of these specific EC-1 overcurrent sensors would have been in a circuit breaker used in cubicle 71-11510, which is the emergency bus feeder breaker providing 600 VAC power to Motor Control Center (MCC)-1 51. Electrical loads powered from this MCC include various safety systems such as the Standby Gas Treatment System (SBGT), Residual Heat Removal System (RHR) and High Pressure Coolant Injection System (HPCI). The loss of the MCC could have resulted in the failure of SBGT to perform its safety function. See the Attachment for specific details.
There are no commitments contained in this report.
October 2,2002
JAFP-02-O195
Questions concerning this report may be addressed to Mr. Timothy Page at (315) 349- 6209.
Very truly yours,
T.A. SULLIVAN
TAS:TP:dmr
Attachment
cc: USNRC, Region I
USNRC, Project Directorate
USNRC Resident Inspector
INPO Records Center
General Electric Nuclear
Attachment to JAFP-02-0195
Page 1 of2
I. Name and Address
Mr. T. A. Sullivan - Vice President, Operations
Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant
P.O. Box 110
Lycoming, NY 13093
II. Facility. Activity or Component
James A. FitzPatrick Nuclear Power Plant (JAF)
The components in question are EC-1 overcurrent sensors for a safety related circuit
breaker. Two overcurrent sensors removed from stock for bench testing tripped
prematurely.
GE Model Type EC-1 Trip Device
225Amp,6OCycle
Sensor Trip, Characteristic 1B-2C
GE P/N QEC1O225ABCG1ONOO
Serial Nos. 77386-3A and 77386-3B
III. Constructor or Supplier
General Electric Nuclear
MIC 397
l75 Curtner Ave.
San Jose,CA 95125
IV. Defect and Safety Hazard
A Condition Report (CR-JAF-2002-03255) identified that two new EC-1 overcurrent sensors withdrawn from warehouse stock failed during bench testing in preparation for installation in the plant during the upcoming refueling outage. The failure mode was premature tripping of the magnetic (instantaneous) element of the device, such that the associated circuit breaker would have tripped early. The only application of these specific EC-1 overcurrent sensors is in the circuit breaker used in cubicle 71-11510, which is the emergency bus feeder breaker providing 600 VAC power to Motor Control Center (MCC)-151. Electrical loads powered from this MCC include various safety systems such as the Standby Gas Treatment System (SBGT), Residual Heat Removal System (RHR) and High Pressure Coolant Injection System (HPCI).
Attachment to JAFP 02-0195
Page2of2
IV. Defect and Safetv Hazard (continued)
The test information indicates that the circuit breaker would have prematurely tripped based on the starting current of the 'A' SBGT Exhaust Fan and thus the associated MCC would not have remained energized. Assuming a concurrent single failure of the 'B' SBGT subsystem, this could have resulted in the loss of both subsystems and the failure of SBGT to perform its safety function. Therefore, a substantial safety hazard existed in that the potential existed for a major deficiencylmajor degradation of essential safety-related equipment.
No other safety functions would have been lost.
V. Date
This defect was discovered on August 27, 2002.
VI. Location and Number of Defective ComDonents
The only application of these specific EC-1 overcurrent sensors would have been in a circuit breaker used in cubicle 71-11510, which is the emergency bus feeder breaker providing 600 VAC power to MCC-151. The spare overcurrent sensors that failed had been in parts inventory for approximately 2 years. There are no other spares in the JAF stock system.
The overcurrent sensors currently installed in the plant were tested satisfactorily prior to installation and have not demonstrated the failure mechanism described in this letter (i.e., SBGT System testing which involves starting the 'A' SBGT Exhaust Fan has not resulted in breaker tripping).
VII. Corrective Action
The defective components were placed in a "hold" status to prevent issuance in the plant. Corrective Action Request 02-111 was issued to General Electric for evaluation and corrective action, with a requested response date of October 21, 2002.
VIII. Advice
None.
Attachment