Part 21 Report - 1999-451

ACCESSION #: 9910280141

Solutions for Today... Standards of Tomorrow
(714) 528-2301l
2950 Birch Street, Brea, CA 92821-5235
FAX (714) 528-0128

ENERTECH
Curtiss-Wright Flow Control Corporation

October 22, 1999

Document Control Desk
Nuclear Regulatory Commission
Washington, D.C. 20555

Subject: 10CFR21 Interim Report: Potential Deficiencies In Enertech Commercial Grade Dedication Program

Dear Madam or Sir

In late 1999 Enertech manufactured and shipped electro-hydraulic actuators for installation on valves to be installed in an overseas plant Prior to shipment, the valve manufacturer observed pressure switch indication problems during final testing of the valves on which the actuators were installed.

Collective investigation by Burns and Roe Enertech, including its switch supplier and the valve manufacturer determined the problem resulted from changes in manufacturing methods implemented by the switch supplier. The immediate problem was addressed, the pressure switches were modified using the supplier's previous manufacturing methods, installed on the valves and subsequently passed all final Test requirements.

The noted change in manufacturing method was not detected by Enertech's commercial grade dedication process. Enertech initiated a corrective action review process to determine the root cause and impact of the potential deficiency. While Enertech's dedication process procedures are considered adequate by outside auditing agencies, Enertech has revised the appropriate procedures to strengthen requirements regarding sub-supplier design control. Enertech personnel involved in the dedication process have been trained regarding the events surrounding the incident discussed above, and on the enhanced requirements of the applicable Procedures.

To date, Enertech has determined The potential deficiency is limited to the case discussed above. However, the review is ongoing. Should Enertech determine any dedicated product previously supplied is at risk due to this potential deficiency, Enertech will make an immediate notification to the NRC, and the appropriate end-users.

Enertech is making this notification on the basis it has determined this issue to be potentially reportable under the provisions of 10CFR21 on October 22, 1999.

Enertech's evaluation of this issue under the provisions of 10CFR21 is not complete. Final evaluation results will be documented in a report to the NRC not later than November 30, 1999.

Sincerely

James Leachman
President


[Illegible print]
10/22/1999 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 1
General Information or Other (PAR) Event# 36332
Rep Org: ENERTECH, BREA, CA Notification Date / Time: 10/22/1999 15:37 (EDT)
Supplier: ENERTECH, BREA,CA Event Date/ Time: 10/22/1999 10:00 (PDT)
Last Modification: 10/22/1999
Region: 4 Docket #:
City: BREA Agreement State: Yes
County: License #:
State: CA
NRC Notified by: JOHN DeKLEINE Notifications: LINDA SMITH R4
HQ Ops Officer: DICK JOLLIFFE VERN HODGE (by fax) NRR
Emergency Class: NON EMERGENCY
10 CFR Section: 21.21
UNSPECIFIED PARAGRAPH

- Potential 10CFR Part 21 Report -

In late 1998 Enertech manufactured and shipped electro-hydraulic actuators for installation on valves to be installed in an overseas plant. Prior to shipment, the valve manufacturer observed pressure switch indication problems during final testing of the valves on which the actuators were installed.

Collective investigation by Burns and Roe, Enertech, including its switch supplier and the valve manufacturer determined the problem resulted from changes in manufacturing methods implemented by the switch supplier. The immediate problem was addressed, the pressure switches were modified using the supplier's previous manufacturing methods, installed on the valves and subsequently passed all final test requirements.


FAX TRANSMITTAL SHEET

Date: October 22, 1999

ENERTECH
2950 Birch Street. Brea, CA 92821, USA
Telephone (714) 528-2307 / Fax (714) 528-0128

TO: Document Control Clerk
FROM: John DeKleine x 152
Director Quality Assurance
COMPANY: Nuclear Regulatory Commission
TELEPHONE. 0
FAX NO.:
Receipt Confirmation Requested [ ] YES [ ] NO
 
SUBJECT: Potential Part 21 notification
REFERENCE: 99-002
 
Enertech has provided the following correspondence to address an issue that potentially is a 10CFR Part 21.
If you have any questions please contact me at your convenience.
 
REGARDS,
 
ENERTECH

[lllegible print]


*** END OF DOCUMENT ***